The document discusses FIDIC Module IV, which was published in 2000 by the International Federation of Consulting Engineers. Module IV provides guidance on FIDIC's standard forms of contract, focusing on the roles and relationships between the employer, engineer/project manager, and contractor. It also describes key aspects of the design, construction, completion, and defect remedy processes covered by FIDIC contracts.

Uploaded by

Yimo Wang
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views

Module IV Part 2

The document discusses FIDIC Module IV, which was published in 2000 by the International Federation of Consulting Engineers. Module IV provides guidance on FIDIC's standard forms of contract, focusing on the roles and relationships between the employer, engineer/project manager, and contractor. It also describes key aspects of the design, construction, completion, and defect remedy processes covered by FIDIC contracts.

Uploaded by

Yimo Wang
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 15

FIDIC Module IV

16
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG
Dr. Götz-Sebastian Hök
FIDIC Conditions of Contract

Employer

Engineer

Contractor

Design / Planning
Dispute Adjudication Board
Build / Construction

17
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG
Dipl.-Ing., Dipl.-Wirt.-Ing. Axel-V. Jaeger
FIDIC Plant, Design &Build Contract Conditions
Employer§ 2
Employer‘s Requirements Engineer § 3
§ 1.1.1.5, § 5.1

- Functional Description - Site Supervision


- Scope of Works - Contract Management
- Performance Description - Contract Administration
- Performance Specification - Instructions / Variations
- Quality Predetermination - Determinations
- Performance Data - Certificates ( Payment / Hand
- Outline Design Over )
- Inspections, Tests
Employer‘s Requirements
Contractor § 4 Engineer

Design Execution
Completion
Remedy any Defects
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS
Dipl.-Ing., Dipl.-Wirt.-Ing. Axel-V. Jaeger – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 18
FIDIC General Conditions of Contract

19
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG
© Dr. Hök
FIDIC General Conditions of Contract

20
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG
Dipl.-Ing., Dipl.-Wirt.-Ing. Axel-V. Jaeger
FIDIC Module IV

© Dr. Hök INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 21
FIDIC Conditions of Contract

Employer

Representative

Contractor

Design / Planning
Dispute Adjudication Board
Build / Construction

change liability
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS
Dipl.-Ing., Dipl.-Wirt.-Ing. Axel-V. Jaeger – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 65
FIDIC EPC Turnkey Projects Conditions
Employer§ 2
Employer‘s Requirements Representative § 3
§ 1.1.1.3, § 5.1 (a) to (d)

- Functional Description - Site Supervision


- Scope of Works - Contract Management
- Performance Description - Contract Administration
- Performance Specification - Instructions / Variations
- Quality Predetermination - Determinations
- Performance Datas - Certificates ( Payment / Hand
- Outline Design Over )
- Inspections, Tests
Employer‘s Requirements
Contractor § 4 Engineer

Vorschlag oder Anordnung


Execution
Tender and any other docs Design
Completion
Remedy any Defects 66
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG
Dipl.-Ing., Dipl.-Wirt.-Ing. Axel-V. Jaeger
FIDIC Module IV

24
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG
© Dr. Hök
FIDIC General Conditions of Contract

25
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG
Dipl.-Ing., Dipl.-Wirt.-Ing. Axel-V. Jaeger
FIDIC Module IV
Guide
published 2000

70
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG
Dipl.-Ing., Dipl.-Wirt.-Ing. Axel-V. Jaeger
FIDIC General Conditions of Contract

27
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG
Dr. Götz-Sebastian Hök
Module IV

INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 28
FIDIC Module IV

INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 29
FIDIC Module IV

INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 30

You might also like