0% found this document useful (0 votes)
53 views

Modul 1 Part 6

The document discusses FIDIC's training module 1. It covers topics like the roles and responsibilities of the contractor and engineer during project execution based on the FIDIC contract forms. The module examines the contractor's obligations like submitting programs, progress reports, notices and applications for payment. It also looks at the engineer's duties in monitoring progress, processing payments and issuing completion certificates. Dispute resolution processes involving claims, determinations and dispute adjudication boards are also outlined.

Uploaded by

Yimo Wang
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views

Modul 1 Part 6

The document discusses FIDIC's training module 1. It covers topics like the roles and responsibilities of the contractor and engineer during project execution based on the FIDIC contract forms. The module examines the contractor's obligations like submitting programs, progress reports, notices and applications for payment. It also looks at the engineer's duties in monitoring progress, processing payments and issuing completion certificates. Dispute resolution processes involving claims, determinations and dispute adjudication boards are also outlined.

Uploaded by

Yimo Wang
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 20

FIDIC Training Module 1

101
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG
FIDIC Training Module 1

10
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG
2
FIDIC Training Module 1

10
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG
3
FIDIC Tender Procurement Procedures

INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS


Dipl.-Ing., Dipl.-Wirt.-Ing. Axel-V. Jaeger – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 6
FIDIC Tender Procurement Procedures

INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS


Dipl.-Ing., Dipl.-Wirt.-Ing. Axel-V. Jaeger – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 6
FIDIC Tender Procurement Procedures

INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS


Dipl.-Ing., Dipl.-Wirt.-Ing. Axel-V. Jaeger – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 6
FIDIC Training Module 1

10
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG
7
FIDIC Training Module 1

Start
Notice of Commencement Date

Progress of the Actions of the


Contractor Contractor
Commencement of Early Warning, Cl. 8.3 Access to the Site?, Cl.
Execution, Cl. 8.1 2.1
Submission of Notice of Claims, Cl. Drawings?, Cl. 1.9
Programme, C. 8.3 20.1
Progress Reports, Cl. Others
4.21
Notice when work is Application for Payment, Interim & Final
ready, Cl. 7.3 Cl. 14 Statements
Agreement as to time Engineer shall give notice of Testing procedure, Cl.
and place for testing, 7.4 intention to attend 7.4

Contractor shall forward Engineer shall endorse certified


certified test results results
Ready for Tests Notice for Tests, Cl. 9.1 Testing procedure

Ready for Taking-Over Ready for Taking-Over

Expiry of Defects Issue of Performance


Notification period Certificate, Cl. 11.9 108
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG
FIDIC Training Module 1

10
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG
9
FIDIC Training Module 1

11
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG
0
FIDIC Training Module 1

•! II. After Contract Award (Documentation)


Monthly report
4.21
Monitoring

Future possible Contemporary


Contractor Event Engineer
event records

Personnel &
Equipment

Employer Claim Notices

11
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG
1
FIDIC Training Module 1

•! Reporting

Legal requirements

Monthly reports
Engineer
takes regard
Con- Early warning of all
tractor relevant
circumstances
Contractor´s Personnel

Claims

Preliminary notices

INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 112
FIDIC Training Module 1

11
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG
3
FIDIC Training Module 1

11
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG
4
FIDIC Training Module 1

11
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG
5
FIDIC Training Module 1

Amicable
Settlement

Interim
Claim Notice Substantiation
or final

Determination
by Engineer
Time line
Notice
28 days

42 days
116
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG
FIDIC Training Module 1

11
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG
7
FIDIC Training Module 1

11
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG
8
FIDIC Training Module 1

The Engineer is appointed to …

Determine Self-Binding DAB

Instruct Self-Binding DAB

Certify payments Correction Engineer

Determine Self-Binding DAB

Instruct Self-Binding DAB

Certify payments Correction Engineer

11
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG
9
FIDIC Training Module 1

12
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG
0

You might also like