Schedule of Columns: Beam/Slab Soffit
Schedule of Columns: Beam/Slab Soffit
Schedule of Columns: Beam/Slab Soffit
DESIGNATION
aggre Slump
SECTION B (mm) D (mm) f'c (psi) MAIN BAR CONC. COVER TIES NOTES
(in) (in)
SECTIO REINFO ORIENT
COLUMN
N RCEMNT ATION
B
Bottom of Footing - FFL:
5@50mm, 3@100mm
(MIRRORED ON THE
CENTER)
5@50mm, 5@100mm,
Roof Beam Level
5@150mm, rest@200mm
(MIRRORED ON THE
CENTER)
REINFORCEMENTS
SECTION f'c Aggreg. Slump Stirrups
BEAM DESCRI Stirrups
B (mm) D (mm) Spacing
NAME PTION BAR CROSS SECTION (mm)
(mm)
SIZE fy BAR TYPE
Midspan psi (mm) Right
Support in in Left End Midspan
End
B B
Cont. 3 3 3
10 MM Ø TIES, 5 @ 50mm,
Top Cut 2 - 2 5 @ 100mm, 5 @ 150mm
5@50,
275 MPa Layers 2 1 2 5@100, REST @ 200mm TILL MID
B 1 - 250 400 3000 3/4 4 16 10
(Grade 40) 5@150 rest HEIGHT, MIRROR TIES
D
Cut - 2 -
@ 200
Bot Cont. 3 3 3 SPACING FROM MID HEIGHT
Layers 1 2 1
Cont. 2 2 2
B B
Top Cut 1 - 1
5@50,
275 MPa Layers 1 1 1 5@100,
R B - 200 300 3000 3/4 4 12 (Grade 40)
10
5@150 rest
FINISH FLOOR LINE
D
Cut - 1 -
@ 200
Bot Cont. 2 2 2
Layers 1 1 1
NATURAL
SCHEDULE OF FOOTINGS (REINFORCED CONCRETE) GROUND LINE
S 1 one way 20.7 / 3000 3/4 4 VARY VARY 120 40 / 275 12 200 12 200 10 400 COLUMN FOOTING DETAIL
S C A L E : N T S
S 2 two way 20.7 / 3000 3/4 4 VARY VARY 120 40 / 275 12 200 12 200 10 400
PROJECT TITLE: APPROVED AS TO PLAN AND LOCATION: SHEET CONTENTS: SHEET NO.:
- SCHEDULE OF FOOTING
T IN.:
OWNER: SANCHO G. JUYAD JR.
LOCATION: BANGWALOG, DUERO, BOHOL
ADDRESS: BANGWALOG, DUERO, BOHOL
TIN: CTC NO.
-
DRAWN:
COLUMN FOOTING DETAIL
DATE: 2