Naukri AnilKumarSingh (26y 0m)
Naukri AnilKumarSingh (26y 0m)
Naukri AnilKumarSingh (26y 0m)
Mobile:+91-9404878255, +91-9765308515
E-Mail: [email protected]
PROFILE SUMMARY
Performance - driven Professional with over 25 years of Experience in:
Site execution of Major Structures for National/State Highways, Marine Bridge, Metro and Tunneling major reputed projects
including
Skilled in supervising all construction activities including providing technical inputs for preparation of
methodologies and site execution, co-ordination with site team and monitoring HSE compliances.
Distinction of working for all Highway’s, Marine Bridge & Metro Structures like major & minor bridges with
superstructure and Vehicular underpass, PUP, Box, Slab and HP Culverts & Retaining Wall.
Proficient in implementing stringent systems and quality plans to ensure high quality standards during all the
stages of project execution.
Demonstrated excellence by executing foundations like Pile Foundations, Well Foundations and Open Foundations.
Creative and Multi-disciplinary Executive renowned for swiftly completing up projects with competent cross-
functional skills and ensuring on time deliverables, quality, and safety parameters.
Sound exposure in preparation & checking of required construction materials for procurement.
An effective technical communicator with strong analytical, problem solving and management skills.
PROFESSIONAL EXPERIENCE
Execution Manager
May’2012 to Nov’2014 with Afcons Infrastructure Ltd., Jammu & Rohtang
Project Engineer
Mar’2003 to Mar’2008 with AR Infrastructure, Nagpur
Site Engineer
Aug’1998 to Dec’2002 with Kumar Construction Company Pvt. Ltd., Chandrapur, Maharashtra
Site Engineer
Jun’1996 to May’1998 with Hari Bhai Velji Construction Company, Yavatmal, Maharashtra
Responsibilities:
Executing different types of Major bridges, Minor bridges, Tunnels Concrete Work, Vehicular under passes,
Pedestrian under passes, Retaining wall, Box Culverts, Slab and HP culverts as per MORTH, IRC standards.
Analyzing requirements for structural works and reviewing all the proposals wherein mapping requirements of
manpower/ materials resources in which ensuring cost quality and safely effective execution as per schedule
Involved with internal and third parties project Audit.
Implementing approved construction methodologies & systems in compliance with quality & cost control standards
Ensuring effective preparation of BOQ, Weekly & Monthly progress reports
Monitoring implementation of HSE plan for execution zone and Worker’s welfare and Safety
Monitoring Daily progress report for achieving pre-planned target.
Pre checking of working drawing prior to submission for review & follow-up for approvals from Clients
ANNEXURE
PROJECTS EXECUTED
Title: - Bihar Border to Jharkhand Road Project, in the State of Jharkhand, Six-Lane Road Project of NH-02. The length
of the road project is 71.00 km with an investment pegged at 1000 crores.
Responsibilities: -
o Attending progress meetings with consultants/client
o Liaison with client and all stake holders
o Reviewing daily output by plant and machineries
o Responsibilities include creating clear and attainable project objectives, preparing the project requirements
o Anchoring on site construction activities to ensure target achievements
o Reviewing submittals related to quality control and monthly planning
o Reviewing construction drawings prior to submission
o Reviewing and approval of sub contractor’s bills, claims, etc.
o Reviewing and approval of all procurement request
o Reviewing and approval 3rd party’s proposals for site activities like Girder launching, Strengthening of Girder etc.
Project Details: - Gondkheri to Kalmeshwar to Dhapewada to Saoner, in the state of Maharashtra, four-laning road
Project of 28.87km and cost of Rs 480.06 crore,
Project Details: -Construction of the Zuari cable stayed bridge includes building a bridge across the river Zuari on NH-
17/ NH 66 on Panjim – Mangalore section in the State of Goa. The Zuari cable stayed bridge is 640m long with
central navigational span of 360m and end span on both sides of 140m. This makes the bridge the 2nd longest
and widest cable stay bridge in India
Responsibilities: -Execution In charge of 2m Dia. Pile Foundation around 50m length and Pile Cap Size (89x27x4) meter.
Period: - Nov 2017 to Sep 2019.
At JMC Projects (India) Ltd., New Delhi
Responsibilities:
Execution for:
o Station Building
o Pile foundation, Pile cap, Pier, Pier cap for station building and Viaduct, Extended Platform.
o Concourse level beam and slab
o Track level beam and slab
o Escalator and staircase
o Installation of Utilities
Responsibilities:
Title: Rehabilitation Strengthening and Four Laning of Road Project from Jammu to Udhampur on NH-1A.
Role: Execution Manager
Period: May’12 to Jul’14
Responsibilities:
Manage execution of all construction activities from conceptual stage till completion of works related to Major and
Minor Bridges including Viaduct, Culverts and CD works as per the work program
Monitoring the closure of submitted RFI’s by sub-ordinates
Responsibility includes progress and quality aspects of construction of Open foundations, Pier and Pier Cap for
square shape Hollow Pier & Round shape Pier, and superstructure with PSC which includes I girder with slab
Executed Super Structures, VUP, PUP, Box, Slab & HP Culverts and Retaining Wall.
Preparation and taking approvals for required amendments due to hill section.
Scheduling of work as per planning & programming for in time completion of assigned work with quality
Involved in Progress Review meetings, presentations, monthly progress reports.
Cross checking and verifying of submitted R/A Bill and BOQ of sub-contractors.
Daily Progress meeting with site engineers and arrangement for procurement of materials and other requirements.
Weekly meeting with sub-contractors to solve their issues and to expedite site progress.
At Supreme Infrastructure India Ltd., Panvel-Indapur,Maharshtra
Project Details: Four Laning of Panvel-Indapur Road Project on NH-17 on BOT Basis.
Period: Nov’11 to April’12
Role: Assistant Manager Structures
Responsibilities:
Title: Construction of South Kasheli & North Kasheli Bridge (Marine Bridge) along with its approaches on Thane :
Bhiwandi - Wadapa Road in Dist. Thane, Maharashtra
Period: Feb’10 to Nov’11
Role: Assistant Manager Structures
Responsibilities:
Assisted in making necessary arrangements for marking lay out of bridge jointly with consultant.
Carried out execution of all construction activities as per the approved working drawings which comprises of works
like pile boring, cage lowering, tremie lowering and concrete pouring for foundation works
Ensured effective preparation of:
o Bar bending schedule, reinforcement bending and binding, formwork fixing and concrete pouring for culverts and CD
works
o Quantities of various items of bills
Compliance quality control during execution of work.
Cross checking of monthly sub-contractor’s bills.
Title: Four laning of Sirval to Baramati Road Project, In Dist. Satara & Pune (MS)
Role: Senior Engineer (Structures)
Responsibilities:
At AR Infrastructure, Nagpur
Title: Pre Engineering Building (PEB) in Buttibori & Hingna Industrial area, Nagpur.
ACADEMIC DETAILS
Diploma in Civil Engineering from Board of Technical Examination, Maharashtra State 1993
PERSONAL DETAILS
Declaration
I, Anil Kumar Singh, hereby declare that the information contained herein is true and correct to the best of my
knowledge and belief .
Date: - …………………………
Place: - …………………………