NEOPRSP011 - Rev. 00 - Pages 11 - Plant Operation Quality Assurance Procedure
NEOPRSP011 - Rev. 00 - Pages 11 - Plant Operation Quality Assurance Procedure
NEOPRSP011 - Rev. 00 - Pages 11 - Plant Operation Quality Assurance Procedure
Procedure
Uncontrolled, if printed *Refer latest version in the server / SAP *If required, print both the sides*
Plant Operation Quality Assurance Procedure
Table of Contents
1. Purpose....................................................................................................................................................3
2. Scope........................................................................................................................................................3
3. Roles and Responsibilities........................................................................................................................3
4. Equipment/Software................................................................................................................................3
5. Terminology.............................................................................................................................................3
6. Procedure.................................................................................................................................................5
7. Records..................................................................................................................................................10
8. Legal Requirements and References......................................................................................................11
Uncontrolled, if printed * Refer latest version in the server / SAP * If required, print both the sides *
Proc. No: NE/OPR/SP-011 Rev: 00 Page 2 of 13
Plant Operation Quality Assurance Procedure
Uncontrolled, if printed * Refer latest version in the server / SAP * If required, print both the sides *
Proc. No: NE/OPR/SP-011 Rev: 00 Page 3 of 13
Plant Operation Quality Assurance Procedure
1. Purpose
To carry out and assure operational process and product water quality in order to meet the
customer requirements as agreed in contract and to fulfill the statutory and regulatory
requirements.
2. Scope
The scope of this operational quality assurance procedure includes the implementation of
policies and procedures followed by NOMAC SIWEP. Quality Assurance Procedure covers the
process and environmental monitoring and analysis at various stages of SIWEP operation.
Responsible for all activities of SIWEP related to operation departments, Responsible for the
implementation of this procedure.
Reporting to plant manager to all activities in the operation department and maintain the plant
availability as per the contractual requirements, Responsible for the implementation of this
plan.
Responsible for safe operation and shutdown of the plant, take appropriate action in case of
emergency, creation of PTW.
Plan, program, coordinate, direct, and evaluate laboratory activities in order to ensure adequate
administration of material and financial resources.
Reporting to Senior Chemist, SCE and process engineer regarding keeping the water quality of
various stages of process within limits, conducting in-process and final product inspection.
4. Equipment/Software
5. Terminology
Accuracy
Uncontrolled, if printed * Refer latest version in the server / SAP * If required, print both the sides *
Proc. No: NE/OPR/SP-011 Rev: 00 Page 4 of 13
Plant Operation Quality Assurance Procedure
The closeness of agreement between the measured value and the accepted, “true”, or
reference value.
Audit
Client
An entity (customer, agency, company, person, etc.) who receives a test result obtained
according to specified requirement.
Controlled Document
A document that is subjected to controls to ensure that the same version of the document and
any revisions are held by or available to all personnel to whom the document is applicable
Document:
A written policy, procedure, or work instruction which defines what people do and how to do it.
Documents should be distinguished from records which are data and/or information acquired by
the laboratory.
Inspection
Product
Result of a set of interrelated or interacting activities which transforms inputs into outputs.
Range
The range of an analytical procedure is the interval the upper and lower concentration
(amounts) of analyst in the sample (including these concentrations) for which it has been
demonstrate that the analytical procedure has a suitable level of uncertainty.
Refer to the document which is a supporting evidence for the effective operation of the IMS.
Sample
Specificity
Uncontrolled, if printed * Refer latest version in the server / SAP * If required, print both the sides *
Proc. No: NE/OPR/SP-011 Rev: 00 Page 5 of 13
Plant Operation Quality Assurance Procedure
The ability of a method to respond exclusively to the target analyst and not to any degrading,
impurity, or other component of the matrix (Official Methods of Analysis of AOAC
INTERNATIONAL)
Work Instruction
Refers to the specific method or activity to be carried out and determine the acceptable
standard for the service.
Abbreviation:
6. Procedure
Shuaiba IWEP Operation Department has developed a system of operational activities that
should be followed for operating the plant in safe manner and with in the design parameters
limitation. The performance of the plant being monitored by process engineer as per attached
operations procedure and work instructions.
The In-process Quality assurance composed of all the materials which are intended for in
process quality checking and testing generally done in the laboratory and monitoring of process
parameters in the field/ DCS. Following analysis are carried out:
Sea water quality monitoring: sampling from seawater is taken once a month from the
intake area, list of parameters to be inspected and their limits shown in the sea water
analysis sheet (NE/QAC/PN-001/FM-008).
DMF/CF outlet water quality monitoring: SDI of DMF/CF outlet water is done three
times per day; in case of close monitoring for DMF outlet water quality, sampling will be
done twice a shift, , the results are recorded in Pretreatment water analysis result sheet.
(NE/QAC/PN-001/FM-002).
First/Second pass Permeate water analysis: The permeate conductivity for first pass will
be checked once a day , if the Conductivity exceeds the limit of 500 us/cm , the
conductivity profile should be carried out for each vessel. The results of Permeate
conductivity will be recorded in (NE/QAC/PN-001/FM-022 and FM-023) and Profile
results should be recorded in (NE/QAC/PN-001/FM-012 and FM-013 )
Permeate water quality monitoring: permeate water quality is checked once a shift (08
hrs), the results are recorded in daily water analysis reports (NE/QAC/PN-
001/FM-023).
Uncontrolled, if printed * Refer latest version in the server / SAP * If required, print both the sides *
Proc. No: NE/OPR/SP-011 Rev: 00 Page 8 of 13
Plant Operation Quality Assurance Procedure
Potable water quality monitoring: Potable water is the final product of RO plant,
is being checked thrice in a day in case of any non conformance the frequency of
monitoring increased as per process requirements, the results are recorded in daily
water analysis report (NE/QAC/PN-001/FM-001).
Data normalization for SWRO trains will be carried out weekly and the results are
recorded in (NE/QAC/PN-001/CH-011), the normalization graphs will be recorded
(NE/QAC/PN-001/CH-012).
Data normalization for BWRO trains will be carried out monthly and the results are
recorded in (NE/QAC/PN-001/CH-013), the normalization graphs will be recorded
(NE/QAC/PN-001/CH-014).
NOMAC IWEP will carry out various analyses of water, effluents/waste water, for specific
purposes. Testing and analysis followed the worldwide accredited ASTM Procedures, Hach
Procedures and Standard Test Method for Water and Wastewater.
NEQACPN001WI00
1 Work Instruction for the Determination of Alkalinity in Water
NEQACPN001WI00
2 Work Instruction for the determination Of BOD in water
NEQACPN001WI00
3 Work Instruction for the Determination of Boron in Water
NEQACPN001WI00
4 Work Instruction for the Determination of Calcium in Water
Uncontrolled, if printed * Refer latest version in the server / SAP * If required, print both the sides *
Proc. No: NE/OPR/SP-011 Rev: 00 Page 9 of 13
Plant Operation Quality Assurance Procedure
NEQACPN001WI00
5 Work Instruction for the Determination of Chloride in Water
NEQACPN001WI00
6 Work Instruction for the Determination Of Copper In Water
NEQACPN001WI00
7 Work Instruction for the Determination Of Color In Water
NEQACPN001WI00
8 Work Instruction for the Determination of Iron in Water
NEQACPN001WI00
9 Work Instruction for the Determination Of Floatables in Water
NEQACPN001WI01
0 Work Instruction for the Determination of COD in Water
NEQACPN001WI01
1 Work Instruction for the Determination of Conductivity of Water
NEQACPN001WI01
2 Work Instruction for the Determination of Calcium and Magnesium in Water
NEQACPN001WI01
3 Work Instruction for the Determination of Langelier Saturation index (LSI)
NEQACPN001WI01
4 Work Instruction for the Determination of Sulfate in Water
NEQACPN001WI01
5 Work Instruction for the Determination of Chlorine Dioxide in Water
NEQACPN001WI01
6 Work Instruction for the Determination of pH of Water
NEQACPN001WI01
8 Work Instruction for the Determination of SDI of Water
NEQACPN001WI01
9 Work Instruction for the Determination of UV Organics in Water
NEQACPN001WI02
0 Work Instruction for the Determination of Bacteria in Water
NEQACPN001WI02
1 Work Instruction for the Determination of Aluminum in Water
NEQACPN001WI02
4 Work Instruction for the Determination of Zinc in Water
NEQACPN001WI02
5 Work Instruction for the Determination of Chlorine Dioxide in Water
NEQACPN001WI02 Work Instruction for the Determination of Specific gravity of Industrial
6 Chemicals
NEQACPN001WI02
9 Work Instruction for the Determination of Sulfuric Acid Purity
NEQACPN001WI03
0 Work Instruction for the Determination of Sodium Carbonate Purity
NEQACPN001WI03
3 Work Instruction for the Determination of Ferric Chloride Purity
NEQACPN001WI03
4 Work Instruction for the Determination of Hydrated Lime Purity
NEQACPN001WI03
5 Work Instruction for the Determination of Poly Aluminium Chloride Purity
NEQACPN001WI03
9 SIWEP - RO Calibration Work Instructions For Laboratory Instruments
Uncontrolled, if printed * Refer latest version in the server / SAP * If required, print both the sides *
Proc. No: NE/OPR/SP-011 Rev: 00 Page 10 of 13
Plant Operation Quality Assurance Procedure
NEQACPN001WI04
0 Work Instruction for the Calibration of pH Meters
NEQACPN001WI04
1 Work Instruction for the Calibration of Turbidity Meters
Document Number
Document Title
NEQACSP001 Industrial Chemicals Handling Procedure
NEQACSP002 Chemical Spillage Control Procedure
NEQACSP004 Water Analysis Guideline Procedure
NEQACSP005 Water Sample Digestion Procedure
NEQACSP006 Laboratory Waste Management Procedure
NEQACSP007 Water Sampling Procedure
NEQACSP008 Industrial Chemicals Sampling Procedure
NEQACSP009 Waste Water Sampling Procedure
NEQACSP010 Membrane Testing Skid Procedure
Permeate water is treated in the potabilization plant for production of potable water. SIWEP
Potabilization plant is equipped with on-line analyzers as well as there is a set of on-line
analyzers at the interface point for determining and maintaining potable water within the
specified limits as desired by the customer. These instrument analyzers are to be in good
working conditions, calibration must be done regularly, and analyzers results must match and
correlate with the actual laboratory analysis results.
Any abnormalities and out of range results are immediately informed to Operation Group for
necessary actions, likewise coordinating the concern departments and people for some tasks to
be quickly accomplished. The potable water quality must match to the guaranteed water quality
(Gulf Standard No.149/2000/Standardization and Meteorology Organization for GCC countries /
Appendix-19-Water Quality Specification of Water Purchase Agreement).
Any quality reports related to operational chemical department and the laboratory are
compiled in
Hardcopies, either by compilation of log sheets or by logbooks, some are maintained in
soft copies for easy tracking. Reports which have been made by the shift chemists will
be directly forwarded senior chemist and after his review forwarded to operation
department.
Log sheets, logbooks, and some special analysis related to quality monitoring, correlation of
tests are compiled for future references.
Uncontrolled, if printed * Refer latest version in the server / SAP * If required, print both the sides *
Proc. No: NE/OPR/SP-011 Rev: 00 Page 11 of 13
Plant Operation Quality Assurance Procedure
Some in-Process inspection and final product inspection results are recorded in QM module in
SAP by shift chemist after that it should be released by senior chemist.
7. Records
Retention
Record Number Record Title Responsibility
Period
NEOPRSP001LS001 Field Log sheet of Cartridge Filter System Process Engineer 5 Years
NEOPRSP001LS004 Field Log sheet of Sea Water Supply System Process Engineer 5 Years
NEOPRSP001LS005 CCR Log sheet for SWRO & BWRO Trains Process Engineer 5 Years
NEOPFSP005FM002 Field Log Sheet of BWRO Permeate Pressure Process Engineer 5 Years
Chemist
Senior Chemist/Shift
5 Years
NEQACPN001FM013 BWRO Train Conductivity Profile Result Sheet Chemist
Senior Chemist/Shift
5 Years
NEQACPN001FM014 ERD Conductivity Profile Result Sheet Chemist
Senior Chemist/Shift
5 Years
NEQACPN001FM015 pH Meter Calibration Record Format Chemist
Senior Chemist/Shift
5 Years
NEQACPN001FM016 Conductivity Meter Calibration Record Form Chemist
Uncontrolled, if printed * Refer latest version in the server / SAP * If required, print both the sides *