Houses
Houses
concrete tiles
concrete tiles concrete tiles concrete tiles
svp
svp svp
WD-01 WD-07 WD-07 WD-04 WD-05 WD-05 WD-04 WD-04 WD-06 WD-04 WD-04
WD-06
NGL NGL ie ie
ie ie
NGL rw g g g g g g NGL
concrete tiles
concrete tiles
concrete tiles
concrete tiles
WD-02 WD-01
NGL NGL
2 230
WD-01
ab
2 584
Top of foundation to be minimun of 600mm below
354
ab
ab
1,158
ab
230
228
rw
finished ground level. Concrete floor slab to be
g
230
ab
Asbestors Sheets or equally approved proofing membrane on 50mm sand blinding on well LETTER DATE DESCRIPTION
ROOM
ab
roofing material
114x38mm s/w truss by damp proof course under all brick walls, window cills
DRAINAGES NOTES:
ie
specifications
2.883
3,650
3,650
ab
5,349
rw
All building works to be carried out in accordance with
5,121
TV ROOM Municipal By-Laws with the inspector approving every
115
WD-04
ab
ROOM
DRAINAGES NOTES:
All foundations, foundation walls, concrete works &
ie
BATH
FFL=0.00
1,251
115 5,790 115 230x690mm concrete strip footings under 115mm walls
rw Ring beam Ring beam
brickwalls,and 500x230 conc strip fooitng
ie
concrete concrete
PASSAGE
115
115
under230brickwalls.
g
rw
115
ab
FLOORS
2.700
g
SHELVING KITCHEN
40mm rough cement screed to all floors with ceramic
230
230
ab
WD-06
rw
WALLS
3,714
5M BUIDING LINE
4,694
690mmx230mm cnc 500mmx230mm cnc 690mmx230mm cnc manufacturer's specifications and with necessary under
115
footing, 1:2:4 mix coats. External finish rough cast plaster with three coats
SHELVING
FOUNDATION:
ab
1,237 115 5,980 min 100mm 1:3:6 mix conc slab cast isolated skimming and 3 coats p.v.a.
WD-06
ie
115
115
2,080 115
FFL=0.00
g
76mm timber coved cornices all round.
DRAINAGE
A Building Section 1:100
ab
ab
230
RC Beam to engineer
W W
and at all change in direction & at every 15m intervals.
RC Beam to engineer
SHELVING
ON STAND 20436A
ab
2,917
2,798
ie
STUDY ROOM FLD
WD-04
FFL=0.00 rw
Any part of drain with less than 350mm
FLD
g
904
earth cover to be encased in concrete.
SHELVING
ab
repairing purposes.
ab
DRAINAGES NOTES:
WD-05 WD-05
30,959
30,959
RC Beam to engineer
TYPE ELEVATION DESCRIPTION QTY
ie ab
230
1,036
ab
11/2 hrs 11/2 hrs Guest -provide inspection eyes to all bends,junctions and
fire rate fire rate 115 3,348 Toilet changes in direction to all soil,waste and drain pipes.
3,086
115
ab g
4,227
BATH window frame with -ventilation pipe to terminate at least 900mm above
WD-03
shw
6.38mm clear glazing eaves
5,310
FFL=0.00
-where depth of drain is less than 400mm,drain is
ab RC Beam to engineer
3,929
2,592
fire place FFL=0.00 plumber to check all levels on site prior to the
ab
ab
ab
ab
230
230
11,995
WD-03
E
LOUNGE
600
FFL=-80
WALK IN
2,788
ROOM
4,938
6,259
900
6,613
230
FLD
CNR Nelson Mandela &
RC Beam to engineer
11/2 hrs
Leopord Takawira
WD-03
3,135
MASTER S'BEDROOM
FFL=-100
2
5,359
FFL=0.00 100mm diameter pvc. earth fill 600 x 450mm c.i. CLIENT:
ab
cast iron
MR ELISHA SITU
230
2,081 1,495
230
4,691
1210
purpose made steel
rock filling PROPOSED AREA
1518
FFL=0.00
900
ab
RC Beam to engineer
WD-06
1,878
1,878
ab
150
RC Beam to engineer
VICTORY PARK
ab
106
230
230
124
124
622
RUWA
ab
ab
ab
ab
1,782
1,782
230
1,475
960
RC Beam to engineer
230
230
230 6,259 230 2,081 3,767 230 4,695 230 57 2,324 230
WINDOW SCHEDULE 1:100
DATE SCALE
GSPublisherVersion 0.30.100.100