0% found this document useful (0 votes)
75 views1 page

Houses

This document provides details for GI flashing for concrete tiles. It includes labels for different types of concrete tiles (WD-01, WD-07, etc.) along various sections of the building. It also labels features like the north elevation, natural grade lines, and installation details like "ie" and "g" that likely refer to installation elements. The diagram shows the layout and placement of different concrete tiles on the building and the associated flashing details.

Uploaded by

aamir ali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views1 page

Houses

This document provides details for GI flashing for concrete tiles. It includes labels for different types of concrete tiles (WD-01, WD-07, etc.) along various sections of the building. It also labels features like the north elevation, natural grade lines, and installation details like "ie" and "g" that likely refer to installation elements. The diagram shows the layout and placement of different concrete tiles on the building and the associated flashing details.

Uploaded by

aamir ali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

GI flashing

concrete tiles
concrete tiles concrete tiles concrete tiles

svp

svp svp
WD-01 WD-07 WD-07 WD-04 WD-05 WD-05 WD-04 WD-04 WD-06 WD-04 WD-04
WD-06
NGL NGL ie ie
ie ie
NGL rw g g g g g g NGL

NORTH ELEVATION 1:100


EAST ELEVATION 1:100

concrete tiles
concrete tiles

concrete tiles
concrete tiles

WD-02 WD-01
NGL NGL

WD-03 WD-03 WD-03

SOUTH ELEVATION 1:100 WD-01 WD-01 WD-01 WD-07


NGL NGL

WEST ELEVATION 1:100


20,332
28M BOUNDARY LINE SPECIFICATIONS
230 1,038 3,854 4,705 3,993 230 3 2,325 3,953 GENERAL GENERAL NOTES
All heights of plinths, depths of excavations & the # Do not scale drawing, only figured dimensions to be used
230 1,038 230 3,624 230 4,245 230 1,314 115 2,563 230 3 2,325 1,113 230 2,380 230 number of steps to be checked by contractor on site. # All dimensions to be checked on site and any
This drawing must be read in conjunction with the discrepancies reported to the Architect.
5M BUILDING LINE Structural Engineer's dwgs. the site must be treated for # This drawing is the copyright of the Architect and may
not be used, copied or reproduced except with the
230

2 230
WD-01
ab

termites in accordance with municipal By-Laws using


ab

written permission of the same.


SHELLDRITE soil poisoner.
rw

2 584
Top of foundation to be minimun of 600mm below

354
ab

ab
1,158

ab
230

rw natural ground level. Backfill of Foundations. Top of


928

soakway septic tank rw


ab

WD-07 WD-07 concrete floor slab, to a minimum of 200mm above


REVISIONS

228
rw
finished ground level. Concrete floor slab to be
g

reinforced with S310 mesh wire, black polythene damp

100mm dia drain to proposed septic tank .


230

230
ab

BEDROOM Roof pitch 25o


ab

Asbestors Sheets or equally approved proofing membrane on 50mm sand blinding on well LETTER DATE DESCRIPTION

Any part of drain with less than 350mm


Fall 1: 40 75mm conc mat under drain.
3,652

ROOM
ab

roofing material

earth cover to be encased in concrete.


WD-04

FFL=0.00 coimpacted hardcore. "GUNDLE" brickgrip emborsed


BATH

114x38mm s/w truss by damp proof course under all brick walls, window cills
DRAINAGES NOTES:
ie

specialist to manufacturer's and where floor levels change. Stormwater shall be


4,200 115 1,429 115 Truss by specialist removed from dwelling, yard and site.
WD-01

specifications

2.883
3,650

3,650

ab

5,349
rw
All building works to be carried out in accordance with

5,121
TV ROOM Municipal By-Laws with the inspector approving every
115

100mmX75mm g.i. stage.

100mm dia drain to proposed septic tank .


g

WD-04
ab

Any part of drain with less than 350mm


Fall 1: 40 75mm conc mat under drain.
FFL=0.00 FLD FOUNDATIONS

earth cover to be encased in concrete.


gutters on 38x228mm
115

ROOM

DRAINAGES NOTES:
All foundations, foundation walls, concrete works &

ie
BATH

fascia board or equally


ie

FFL=0.00
1,251

FLD subsoil stormwater drainage to Engineer's specification.


PASSAGE approved
ab

115 5,790 115 230x690mm concrete strip footings under 115mm walls
rw Ring beam Ring beam
brickwalls,and 500x230 conc strip fooitng

ie
concrete concrete

PASSAGE
115

115

under230brickwalls.
g

rw
115
ab

FLOORS

2.700

g
SHELVING KITCHEN
40mm rough cement screed to all floors with ceramic

50M BOUNDARY LINE

50M BOUNDARY LINE


BEDROOM
115

tile finishing to all the rooms except in the garages.


WD-01

230
230
ab

BEDROOM Ceramic tile skirting all round.


3,126

WD-06

rw
WALLS
3,714

FFL=0.00 all dpc to be min 150mm


ab

all dpc to be min 150mm above finished ground level


6,563

All bricks approved burnt clay commons/facings from

5M BUIDING LINE

2.5M BUIDING LINE


above finished ground level
FFL=0.00 NGL NGL
PASSAGE

rw willdale of any other reputable manufacturer (CAZ)


rw
FLD approved. All bricks to have "GRUNDLE" damp proffing
5,355
13,987

cource on slab & brickforce after every eleven brick


ab

4,694

cources. All paint work to comply with the


4,579
KITCHEN

690mmx230mm cnc 500mmx230mm cnc 690mmx230mm cnc manufacturer's specifications and with necessary under
115

footing, 1:2:4 mix coats. External finish rough cast plaster with three coats
SHELVING

footing, 1:2:4 mix footing, 1:2:4 mix


p.v.a. Internal finigsh steel trowel plaster, rhinoset
115

FOUNDATION:
ab

1,237 115 5,980 min 100mm 1:3:6 mix conc slab cast isolated skimming and 3 coats p.v.a.
WD-06

Foundation depth to be min 250mm well compacted fill after


WINDOWS AND DOORS
FLD A determined on site. Min 900mm removal of all organic top soil and from vertical walls with malthoid membrane
g

All windows and doors frames standard pressed steel


3,834

other deleterious matter,termicide and on black polythene sheeting lapped at joints rw


sections by specialist 6mm glazing/anodised alluminium
115
WD-01

& thickened at end finished to receive floor


3,135

treatment to fill and to extent of buiding


8,981

sliding doors by specialist.


ab

finish laid on 200mm thick hardcore 432,977,156 mm2


CEILINGS
BEDROOM FLD

ie
115

115

2,080 115

FFL=0.00 -6mm tapboard ceiling fixed to 38x38 timber branders


ab
1,438

@ 400 c/c both ways. Cover strips to all joints and


WD-04

FFL=0.00

g
76mm timber coved cornices all round.
DRAINAGE
A Building Section 1:100
ab

-100mm glazed earthenware sewer drain with a


115

minimum fall of 1:6, rodding eyes at all head of drain


WD-05 ab

ab
230

RC Beam to engineer

W W
and at all change in direction & at every 15m intervals.
RC Beam to engineer

3,972 PROPOSED HOUSE Inspection eyes at junctions to have clearly marked


230 2,093 115

covers on ground level


PANTRY

SHELVING
ON STAND 20436A
ab
2,917
2,798

-Drains under buildings to be 100mm cast iron pipe

ie
STUDY ROOM FLD
WD-04

encased in 150mm concrete and waste pipes under


floor slabs to sleeved.
100mm dia drain to proposed septic tank .

FFL=0.00 rw
Any part of drain with less than 350mm

-All waste pipes must 65mm reseal traps and to be


Fall 1: 40 75mm conc mat under drain.

FLD

g
904
earth cover to be encased in concrete.

accesible over the entire length for cleaning and


WINDOW SCHEDULE
230
ab
ab

SHELVING
ab

repairing purposes.
ab

DRAINAGES NOTES:
WD-05 WD-05
30,959

30,959

-Gutter downpipes must discharge at a distance of less


115

RC Beam to engineer
TYPE ELEVATION DESCRIPTION QTY
ie ab
230

than 1500mm from an open gulley.


1,036

1,036
ab

11/2 hrs 11/2 hrs Guest -provide inspection eyes to all bends,junctions and
fire rate fire rate 115 3,348 Toilet changes in direction to all soil,waste and drain pipes.
3,086
115

-all rodding eyes to terminate in ABC cover and tops of


115

all such covers, gulleys and manholes to be min.


5
all garage walls to be build up to the under side of the roof

GUEST 150mm above finished ground level.


1,332

purpose made steel


WD-01
1,500
DINING

ab g
4,227

BATH window frame with -ventilation pipe to terminate at least 900mm above
WD-03

shw
6.38mm clear glazing eaves
5,310

FFL=0.00
-where depth of drain is less than 400mm,drain is
ab RC Beam to engineer

to be encased in 100mm thick grade 20 concrete


115

3,929

2,401 all round.


ab

230 5,966 purpose made steel


-provide sealed traps to all soil and waste fittings.
window frame with 10M BUILDING LINE -all sinks to be fitted with 50mm dia. silent traps.
ab

2,592

fire place 6.38mm clear glazing


WD-02
1,500

FFL=-100 -all manholes to be 900x600mm internally in 230mm


RC Beam to engineer RC Beam to engineer
4
4 CAR GARAGE

-brick walls rendered smooth internally and wood


float externally above ground level and 600x400mm
230

fire place FFL=0.00 plumber to check all levels on site prior to the
ab

ab
ab

ab

cast iron medium duty manhole cover and frames


2,000 laying of any drains. all drainage works shall comply
ie ab
115

230

230

with the MBBL(1977)


12,455
11,995

11,995
WD-03

E
LOUNGE

purpose made steel


WD-03
DRESSING

600

FFL=-80
WALK IN

window frame with


WD-04

6.38mm clear glazing 3


2,788

2,788
ROOM
4,938

115 3,643 115 3,544


XQUISITE PLANS
900
ab

5,966 115 purpose made steel


PROPOSED 28M BOUNDARY LINE
WD-04 window frame with 5
ab

6,259
900
6,613

FFL=0.00 6.38mm clear glazing


3.5 GATE
115

architectural design, 3D presentation consultants and model makers


ab

230

SITE PLAN SCALE 1:200


ab

FLD
CNR Nelson Mandela &
RC Beam to engineer

11/2 hrs
Leopord Takawira
WD-03

fire rate 540 230 3000 230 3000 4700


115

3,135

100mm r.c. lid min Harare


38mm above n.g.l cell: 0776 375289
WD-05
900

MASTER S'BEDROOM
FFL=-100
2
5,359

FFL=0.00 100mm diameter pvc. earth fill 600 x 450mm c.i. CLIENT:
ab

cast iron
MR ELISHA SITU
230

drain fall 1: 60 manhole cover


ab
4,177
ab

2,081 1,495
230

garage roller shutter by specialist


RC Beam to engineer
3,655 150-300mm
ab

4,691

1210
purpose made steel
rock filling PROPOSED AREA

1518
FFL=0.00
900
ab

RC Beam to engineer
WD-06
1,878
1,878
ab

window frame with


2 PLAN OF SEPTIC TANK LID
106 1,347
1,347

6.38mm clear glazing


WD-07 ab

150
RC Beam to engineer

VICTORY PARK
ab
106

230
230
124
124

622
RUWA
ab

ab
ab

ab

WD-02 WD-01 purpose made steel


1,552
1,552

1,782
1,782

230
1,475

window frame with 230


WD-07
FFL=-100
1
230

6.38mm clear glazing 3460


SHEET CONTENT:
site plan, floor plan,
1560

960
RC Beam to engineer
230
230

elevations and section


230

230 6,259 230 2,081 3,767 230 4,695 230 57 2,324 230
WINDOW SCHEDULE 1:100
DATE SCALE

6,489 230 2,081 3,767 230 4,982 2,554


END ELEVATION 03/ 05/2022 AS SHOWN
PLAN OF SEPTIC TANK AND SOAKAWAY
20,332 OF SOAKAWAY DRAWN BY CHECKED BY

SEPTIC TANK AND SOAKAWAY DETAILS


B K
.R

PLINTH AREA=433m2 Tafadzwa Gavi Tafadzwa Gavi


Ground Floor 1:100 DWG NO.

GSPublisherVersion 0.30.100.100

You might also like