ME Issues
ME Issues
Business Scenario:
Issue:
Operators can labor on before starting the SFC. Labor on shouldn’t be allowed, if
the SFC is not active.
Observation:
Standard behavior is allowing the operators to labor on to the SFCs with status In
Queue or In-work.
Attaching the Labor on to Start activity is not possible, because multiple users
need to labor on to the SFC.
Expectation:
Users should be allowed to labor on if the SFC is not active. There should be
some activity rule/setting where we can configure the behavior.
Why labor on is allowed when the SFC is not active? is this standard behavior? is
there any setting available to control this?
Business Scenario:
Issue:
After adding the EWM managed non BOM component using Standalone As-
Built Configuration activity, the outbound message
ewmComponentAddReequest is failing in the queue monitor
Observation:
No component details are getting passed to the BAPI, the xslt is adding the
components if only they have the reservation number and reservation item
number.
As the non BOM component doesn’t have any reservation number its not passing
the components to BAPI, which is failing.
Expectation:
Business case is valid, Business needs to assemble the EWM managed non BOM
component, and the corresponding posting should be triggered to EWM.
Business requirement is to maintain the raw material/input material in EWM.
Finished and semifinished materials are getting received at IM location. Business
is adopting SAP MES. In MES assembly activity should trigger Goods issue from
EWM via ewmComponentAddRequest.
Issue:
Observation:
Business requirement is to use shop order specific Routing and BOM and in some
scenario business needs to change the BOM in ECC after releasing the Order to
ME.
Issue:
Change production activity is failing with exception “BOM is not assigned to the
routing please select a Routing to which BOM is assigned”
Observation:
Updated BOM Version is not updated in shop order specific Routing during
LOIPRO processing.
A new version of BOM is created due to the BOM change in ECC and no change
in the routing, but the BOM field in the Routing is pointing to the old version of
the routing.
Expectation:
Business case is valid, Business needs to change only the BOM in ECC and need
to update the same in SAP ME using Change production.
Business Scenario:
Issue:
Observation:
By-Product receipt plugin is not validating the required quantity and there is no
rule to control this behavior.
Expectation:
Business case is valid, Business needs to restrict the receipt quantity and need to
see the received quantity of the By-Product.
Issue:
Expectation:
SAP ME should allow repeated quality inspection for DC group created with
reference to in process inspection lot of ECC. Business case is valid.
Business Scenario:
Issue:
Expectation:
SAP ME should allow inspection point wise data collection. Business case is
valid.
Business Scenario:
Issue:
There is no option to collect the batch number while receiving the By-Product.
Observation:
By-Product receipt plugin is not considering the “Data to collect of Floor Stock
Receipt” value for the component.
Also, if we attach any mandatory field for the “Data to collect of Floor Stock
Receipt” the by-product receipt action is failing without any error in the screen,
but exception can be seen in the logs.
Expectation:
Business case is valid, need option to input batch number while receiving the By-
Product.
Business Scenario:
Raw materials are being received from the EWM, once the required components
are assembled, business needs to collect the leftovers as By-product, which is not
configured as By-Product in BOM.
Issue:
Observation:
Expectation:
Business case is valid, please let us know if any workaround is available for this
scenario.
Business Scenario:
While opening the By-Product receipt Plugin, need to hide the By-Products
which are configured as Backflush Components and show only the non
backflush items, otherwise operators will not know which By-Products needs to
be received manually.
Issue:
Observation:
Expectation:
Business case is valid.please let us know if any workaround is available for this
scenario.
Business Scenario:
In the Business scenario business will be having leftover from any of the BOM
component and they want to receive that as By-Product, which is not configured
as By-Product in BOM.
Issue:
Observation:
Expectation:
Business case is valid, please let us know if any workaround is available for this
scenario,
Business Scenario:
Issue:
Observation:
In attachment
Expectation:
Issue:
Collect Work Time Popup is not appearing while Labor Off, due to this, operator
was unable enter the distributed activity times spent on the operation.
Observation:
The Collect Work Time Plugin is appearing only when the logged in user labor
off from the POD, when other users try to labor off, system is laboring off the
operator with out collecting the distributed activity times.
Expectation:
Collect Work Time Popup should appear to collect the distributed activity time
for all the operators, while Labor Off.
Business Scenario:
Issue:
Observation:
Connection to the EWM is fine, we can execute JCo start session to the EWM
connection.
We are using the standard workflow and the JCo Interface is throwing Exception
while calling the RFC.
Expectation:
Got the update from my developer colleagues that this one is an enhancement request
and has been added to the backlog list of enhancements with no promised
implementation date.
Best Regards,
Janos
SAP Product Support
Dear Soumya,
I had some further discussion on this with my developer colleagues and they have
confirmed that inspection points are not supported at all because it would require
changes in the basic design.
Best Regards,
Janos
SAP Product Support
Dear Customer,
Got the update from my developer colleagues that this one is an enhancement request
and has been added to the backlog list of enhancements with no promised
implementation date.
Best Regards,
Janos
SAP Product Support
Dear Customer,
Got the update from my developer colleagues that this one is an enhancement request
and has been added to the backlog list of enhancements with no promised
implementation date.
Best Regards,
Janos
SAP Product Support
Dear Customer,
Got the update from my developer colleagues that this one is an enhancement request
and has been added to the backlog list of enhancements with no promised
implementation date.
Best Regards,
Janos
SAP Product Support
Dear Customer,
Got the update from my developer colleagues that this one is an enhancement request
and has been added to the backlog list of enhancements with no promised
implementation date.
Best Regards,
Janos
SAP Product Support
Dear Customer,
Got the update from my developer colleagues that this one is an enhancement request
and has been added to the backlog list of enhancements with no promised
implementation date.
Best Regards,
Janos
SAP Product Support
No Solution Provided
It's strange that in MEINT, we need to specify the ECC logial system as eWM prgram ID
to get the things work