1.4 Pipa Conduit E-19 @3,66 mtr c/w accecories s0cket, piluck,bushing, etc 25,0 Length/Btg
1 Steel pipe conduit E-19, Panasonic / Equivalent 25,0 Length/Btg Rp300,000 Rp25,000
2 Set screw connector c/w bushing E-19 panasonic 12,5 set Rp35,000 Rp10,000
3 PH-clamp c/w piluck E-19, panasonic 50,0 set Rp25,000 Rp10,000
4 Set screw coupling E-19, Panasonic 12,5 pcs Rp35,000 Rp10,000
1.5 Pipa Conduit E-25 @3,66 mtr c/w accecories s0cket, piluck,bushing, etc 10,0 Length/Btg
1 Steel pipe conduit E-25, Panasonic / Equivalent 10,0 Length/Btg Rp400,000 Rp25,000
2 Set screw connector c/w bushing E-25 panasonic 5,0 set Rp35,000 Rp10,000
3 PH-clamp c/w piluck E-25, panasonic 20,0 set Rp25,000 Rp10,000
4 Set screw coupling E-25, Panasonic 5,0 pcs Rp35,000 Rp10,000
2.2 Unloading, Lifting & Setting, Termination, Resistance check, MCC Panel 30T EA Boiler 1,0 Set Rp7,500,000
c/w fabrikasi frame support panel
2 Setting, Termination, Resistance check, NLA/FLA Test Rotation Motor - Feed Pump 1 1,0 Set Rp5,000,000
3 Setting, Termination, Resistance check, NLA/FLA Test Rotation Motor - Feed Pump 2 1,0 Set Rp5,000,000
4 Setting, Termination, Resistance check, NLA/FLA Test Rotation Motor - Oil Pump 1,0 Set Rp5,000,000
2 Cable NYY 4 x 70mm2 - Combustion Fan 75 KW - Soft starter #1 Unit Motor/Fan 50 Meter Rp60,000
3 Cable NYY 4 x 10mm2 - Feed Pump 30 KW - Star Delta #2 Unit Motor - Pump 150 Meter Rp20,000
4 Cable NYY 4 x 4mm2 - Oil Pump 5.5 KW - DOL #1 Unit motor - pump 100 Meter Rp15,000
5 Cable NYY 5 x 1.5mm2 For LCS Motor/Pump 250 Meter Rp15,000
6 Cable NYY 3 x 2.5mm2 Installation Operation & Lighting 350 Meter Rp15,000
7 LIYCY - Cable Instrument Screen 4 x 1mm2 For Boiler 30T - Instrument ( 10 Unit 1500 Meter Rp15,000
Instrument )
8 Cable NYA Y/G 1 x 70 MM For Boiler 30T - Grounding 100 Meter Rp60,000
9 Cable NYY 4 x 16mm2 (Lighting Distribution Panel) 100 Meter Rp15,000
10 Cable NYY 1 x 120mm2 For Boiler 30T - Power From Existing Panel Feeder MCCB 400A 310 Meter Rp350,000 Rp120,000
11 Cable NYY 3 x 2.5mm2 Installation Operation & Lighting 200 Meter Rp35,000 Rp15,000
GA SATUAN HARGA JUMLAH PEKERJAAN
UPAH MATERIAL UPAH
Rp7,500,000 Rp7,500,000
Rp5,000,000 Rp5,000,000
Rp5,000,000 Rp5,000,000
Rp5,000,000 Rp5,000,000
Rp5,000,000 Rp5,000,000
Rp7,500,000
Rp30,000,000
Rp120,000
Rp60,000 Rp3,000,000
Rp20,000 Rp3,000,000
Rp15,000 Rp1,500,000
Rp15,000 Rp3,750,000
Rp15,000 Rp5,250,000
Rp15,000 Rp22,500,000
Rp60,000 Rp6,000,000
Rp15,000 Rp1,500,000
Rp108,500,000 Rp37,200,000
Rp120,000
Rp348,075,000 Rp190,185,000
12 Instruments control cable 3 x 1mm2 (Control cable) non screen 675 Meter
13 Cable NYY 4 x 1mm2 (Dosing Pump) 150 Meter
14 Scoon cable (cable lugs) Copper 120 mmsq c/w Bolt & Nut & accessories 10 Pcs
15 PVC/Vinyl Wire end caps, colour red, blue, black & yellow. 120 mmsq 10 Pcs
16 Scoon cable (cable lugs) Copper 70 mmsq c/w Bolt & Nut & accessories 10 Pcs
17 PVC/Vinyl Wire end caps, colour red, blue, black & yellow. 70 mmsq 10 Pcs
18 Scoon cable (cable lugs) Copper 10-4-1,5 mmsq c/w Bolt & Nut & accessories 10 Ls
19 PVC/Vinyl Wire end caps, colour red, blue, black & yellow. 10-4-1,5 mmsq 10 Ls
20 Scoon cable (cable lugs) Copper 0,75 mmsq c/w Bolt & Nut & accessories 1 Ls
21 Accessories termination, scoon cable, cable gland, sealing kit/foam/Isolation and etc. 1 Lot
6 Steel Pipe Conduit size E-19 c/w Accessories setscrew, bushing, piluck/clamp 40,0 set
4.2 Lighting Area Tanki - Lighting Installation LED 150Watt 3,0 PCS
1 Lighting Installation LED 150Watt 3,0 pcs
3 Steel Pipe Conduit size E-19 c/w Accessories setscrew, bushing, piluck/clamp 10,0 set
V Grounding/Earthing system
1 Grounding System IE - Terminal grounding, copper rod, Cable BC 70mm2 & Y/G 70mm2, 1,0 Ls
Grounding technical system <2 OHM
2 Grounding System PE/Electrical - Terminal grounding, copper rod, Cable BC 70mm2 & 1,0 Ls
Y/G 70mm2, Grounding technical system <2 OHM
VI Indirect Cost
1 Consumable 1,0 LS
2 Pre-Commissioning & Commisioning 1,0 LS
3 APD / Safety Tools 1,0 LS
4 Mobilization - Demobilization 1,0 LS
5 Cleaning Area Kerja 1,0 LS
6 Asbuilt drawing and reporting 1,0 LS
JUMLAH SUB
TOTAL