This document provides a work package summary for an air product project in Neom. It outlines 27 work packages across 4 priority levels related to civil, mechanical, electrical, and other works for buildings including a cell assembly workshop building, central control building, and multiple operation buildings. The work packages include earthworks, concrete works, piping installation, equipment installation, testing and commissioning.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
275 views1 page

AP Work Package (00000003)

This document provides a work package summary for an air product project in Neom. It outlines 27 work packages across 4 priority levels related to civil, mechanical, electrical, and other works for buildings including a cell assembly workshop building, central control building, and multiple operation buildings. The work packages include earthworks, concrete works, piping installation, equipment installation, testing and commissioning.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PROJECT: Air Product Project -Neom

DURATION:
WORK PACKAGE SUMMARY
SL. NO. PRIORITY BLDG TAG PARCEL DESCRIPTION PARCEL # DISCIPLINE DISC CODE CODE WORK PACKAGE WORK PACKAGE DESCRIPTION REMARKS

01 1 01 I 01 01I01 Mobilization
Indirect Manpower, Design Services, Safety, Office Supply, Pantry Supply and
02 1 INDIRECT 01 INDIRECT I 02 01I02 Site Running Cost
Others
03 1 01 I 03 01I03 Demobilization
SUB-TOTAL
04 1 02 C 01 02C01 Substructure ( Earthworks ,Concrete & Waterproofing from SOG and below)
05 1 02 C 02 02C02 Super Structure (Concrete above SOG + Masonry+ PEB & S.Panel)
CIVIL
06 1 02 C 03 02C03 Finishing Works (Floor,Wall Ceiling Finishes)
07 1 02 C 04 02C04 Furnishing & Equipment ( Overhead Crane & Kitchen Appliances/Equipment)
09 1 02 M 01 02M01 Mechanical Works 1st & 2nd Fix ( Piping , Valves & others)
900-B917

CELL ASSEMBLY
10 1 02 MECHANICAL M 02 02M02 Mechanical Works Final Fix (Toilet Acc.,Equipment & Fixtures) 900-B917 CELL ASSEMBLY WORKSHOP BLDG
WORKSHOP BLDG.
11 1 02 M 03 02M03 Mechanical Works Testing & Commisioning
12 1 02 E 01 02E01 Electrical & Low Current Works 1st & 2nd Fix ( Piping , Wiring , Panel Board & Acc., Trays and others)
13 1 02 E 02 02E02 Electrical Works Final Fix ( Fixture, Switch, Equipment & Outlet)
ELECTRICAL
14 1 02 E 03 02E03 Low Current Works Final Fix ( Switch, Instrument & Equipment)
15 1 02 E 04 02E04 Electrical Works Testing & Commisioning
16 2 03 C 01 03C01 Substructure ( Earthworks ,Concrete & Waterproofing from SOG and below)
17 2 03 C 02 03C02 Super Structure (Concrete above SOG + Masonry+ PEB & S.Panel)
CIVIL
18 2 03 C 03 03C03 Finishing Works (Floor,Wall Ceiling Finishes)
19 2 03 C 04 03C04 Furnishing & Equipment ( Overhead Crane & Kitchen Appliances/Equipment)
20 2 03 M 01 03M01 Mechanical Works 1st & 2nd Fix ( Piping , Valves & others)
900-B901

21 2 Central Control Building 03 MECHANICAL M 02 03M02 Mechanical Works Final Fix (Toilet Acc.,Equipment & Fixtures) 900-B901 Central Control Building
22 2 03 M 03 03M03 Mechanical Works Testing & Commisioning
23 2 03 E 01 03E01 Electrical & Low Current Works 1st & 2nd Fix ( Piping , Wiring , Panel Board & Acc., Trays and others)
24 2 03 E 02 03E02 Electrical Works Final Fix ( Fixture, Switch, Equipment & Outlet)
ELECTRICAL
25 2 03 E 03 03E03 Low Current Works Final Fix ( Switch, Instrument & Equipment)
26 2 03 E 04 03E04 Electrical Works Testing & Commisioning
27 3 04 C 01 04C01 Substructure ( Earthworks ,Concrete & Waterproofing from SOG and below)
28 3 04 C 02 04C02 Super Structure (Concrete above SOG + Masonry+ PEB & S.Panel)
B903,B906,B101,B220,B203,B902

CIVIL BDLG. INCLUDED:


29 3 04 C 03 04C03 Finishing Works (Floor,Wall Ceiling Finishes)
1- (100-B101) Operator Building for ASU
30 3 04 C 04 04C04 Furnishing & Equipment ( Overhead Crane & Kitchen Appliances/Equipment)
2- (200-B220) Operator Building for Hydrogen
31 3 04 M 01 04M01 Mechanical Works 1st & 2nd Fix ( Piping , Valves & others)
3- (261-B203) Operator Building for Ammonia Generation Unit
32 3 Operation Buildings 04 MECHANICAL M 02 04M02 Mechanical Works Final Fix (Toilet Acc.,Equipment & Fixtures)
4-(900-903) Canteen
33 3 04 M 03 04M03 Mechanical Works Testing & Commisioning
5- (900-B902) Administration Building
34 3 04 E 01 04E01 Electrical & Low Current Works 1st & 2nd Fix ( Piping , Wiring , Panel Board & Acc., Trays and others)
6- (900-B906) Maintenance Workshop
35 3 04 E 02 04E02 Electrical Works Final Fix ( Fixture, Switch, Equipment & Outlet)
ELECTRICAL
36 3 04 E 03 04E03 Low Current Works Final Fix ( Switch, Instrument & Equipment)
37 3 04 E 04 04E04 Electrical Works Testing & Commisioning
38 4 05 C 01 05C01 Substructure ( Earthworks ,Concrete & Waterproofing from SOG and below)
B911,B910,B908,B912,B913,B920,B801B

39 4 05 C 02 05C02 Super Structure (Concrete above SOG + Masonry+ PEB & S.Panel) BDLG. INCLUDED:
CIVIL
40 4 05 C 03 05C03 Finishing Works (Floor,Wall Ceiling Finishes) 1- (900-B908) Security Control Building
41 4 05 C 04 05C04 Furnishing & Equipment ( Overhead Crane & Kitchen Appliances/Equipment) 2- (900-B910) Visitor Centre Main Gate Security building
42 4 05 M 01 05M01 Mechanical Works 1st & 2nd Fix ( Piping , Valves & others) 3- (900-B911) Main Gate Guard House
802

43 4 Security Buildings 05 MECHANICAL M 02 05M02 Mechanical Works Final Fix (Toilet Acc.,Equipment & Fixtures) 4- (900-B912) Internal Gate Security House
44 4 05 M 03 05M03 Mechanical Works Testing & Commisioning 5- (900-B913) Internal Gate Guard house
45 4 05 E 01 05E01 Electrical & Low Current Works 1st & 2nd Fix ( Piping , Wiring , Panel Board & Acc., Trays and others) 6- (900-B923) Preliminary Inspection and Check Point Building
46 4 05 E 02 05E02 Electrical Works Final Fix ( Fixture, Switch, Equipment & Outlet) 7- (800-802) Jetty Guard House
ELECTRICAL
47 4 05 E 03 05E03 Low Current Works Final Fix ( Switch, Instrument & Equipment) 8-(800-B801) Jetty Guard House
48 4 05 E 04 05E04 Electrical Works Testing & Commisioning