SCOPE:
This Document describes the Guideline for conducting Job Safety Analysis (JSA).
01 Guideline Basis 03
02 Job Safety Analysis Methodology 04
03 JSA Training & Team 09
04 Review Meeting 10
05 JSA Training Guide 11
06 JSA Example 12
07 JSA Format 17
SAF/2 /10 Page 2 of 16 Date Prepared:
Revision: 0 Date Revised:
As a job is analyzed, it will be found that some job steps have no hazards associated with them. On
the other hand, an individual job step may reveal several hazards or potential accident triggering
items. Obviously, some of hazards revealed will be conditions & some will arise out of employees’ action.
JSA will address all the possible hazards.
Frequency of Incidents/Injuries:
The greater the number of accidents associated with a job, the greater its priority claim for JSA. Every job
that has had disabling injuries should also be given a JSA, particularly if the injuries prove that prior preventive
action was not adequate.
Severity Potential
Some jobs may not have a history of accidents but may have the potential for producing severe injury. These
jobs are generally not done frequently therefore merit a special review. A guideline attached with this
procedure can be used for assigning a hazard class and then JSA can be performed for all jobs having 20
or more Hazard Score. Area owner (Mostly Maint. Unit Manager) will call up the JSA.
A numeric guideline for the scoring of consequences is given in Table-1 and should be used before embarking
upon the JSA activity. Maint. Unit manager in consultation with SET Advisor will assign scores and call for the
JSA of an activity. The overall Hazard score is obtained by multiplying the Consequence and Frequency
scores. Activities bearing high consequences have to go through JSA as per following table. All activities lying
outside the GREEN areas need to Analyzed using JSA technique.
SAF/2 /10 Page 2 of 16 Date Prepared:
Revision: 0 Date Revised:
Catastrophe (Level-II),
Noticeable equipment
First Aid injury, minor
to equipment, NEQS
LWI, VCM exposure,
equipment damage
Noticeable impact
Noticeable impact
Major equipment
damage, multiple
fire or moderate
Serious Injury,
violation.
fatalities.
damage
damage,
Changes in equipment or in the process obviously have no history of accidents. A JSA of job should be done
before embarking on the activity. Analysis should not be delayed until accident or nearmiss occur. Similarly,
all non-routine jobs of higher hazard classification are also required to be given a JSA.
Others:
JSA call up can also be recommended by the SUBSOCs for any jobs. Also, any other non-routine and
potentially hazardous jobs defined by Safety Advisor and Area in charges.
SAF/2 /10 Page 2 of 16 Date Prepared:
Revision: 0 Date Revised:
A job should be broken down into a sequence of task steps each describing what is being done. Do not
breakdown the job in such a detail that an unnecessarily large number of steps result. Similarly, the job
breakdown should not be so general that basic steps are missed.
To do a job breakdown, select experienced & capable employee who are knowledgeable to identify the
hazards & can suggest measures to eliminate or control them.
Determine the hazards and potential for accident in each job step.
Each step in the job breakdown should be carefully analyzed for hazards & accident potential with a view to
identifying all the possible hazards whether produced by the environment or job procedures. The familiar &
usual safety questions should be answered. Some of the questions are as under:
Frequency/Probability Level
All the potential hazards should be assigned a probability level based on the potential to cause an injury or
extreme unsafe condition in the area. The probability levels to be used are given in the Table-1
The final step in a JSA is to develop a safe job execution way to prevent occurrence of accidents. There are
four ways we can develop solutions that will eliminate or control hazards & offset accident potential. These
are:
To find entirely a new way to do a job, determine the work goal of the job & then analyze the various ways
of reaching this goal to see which way is the safest. Consider work-saving tools & equipment. If a new
way cannot be found, then ask this question about each hazard and potential cause listed: What change in
physical condition (such as change in tools, materials, equipment, layout or location) will eliminate the
hazard or prevent the accident.
To investigate the changes in the job procedure, ask the following questions about each hazard and potential
accident cause listed: “What should the employee do or not do to eliminate this particular hazard or
this potential accident? How should it be done?
SAF/2 /10 Page 2 of 16 Date Prepared:
Revision: 0 Date Revised:
List recommended safe operating procedure and required PPE for each step of the job.
Be specific; say exactly what needs to be done to address the hazard. Avoid general statements. Give a
recommended action or procedure for every hazard.
Below are some of the guidelines to be used for identifying the Human Factor related items in a JSA.
Human Factors
It is important to consider human factors and their impact on the likelihood of accidents. Human factors may
result in an increase in the likelihood of a human error, by utilizing the guideline (given below) during JSA,
human error situations can be identified and necessary actions to address the issue developed.
All the JSAs would be review by the Area Incharge / Safety Advisor & approved by the Sub SOC(Mechanical)
chairman.
SAF/2 /10 Page 2 of 16 Date Prepared:
Revision: 0 Date Revised:
Job Safety Analysis leader should go through a formal Safety Supervision Course in which Job Safety Analysis
is covered in detail & must have participated in a JSA before leading one. Adequate training of the JSA study
team must be done to ensure a high quality analysis. Training is most effective when atleast a re-fresher is
provided shortly before the beginning the study.
Team training requirements typically include a team resource, or leader, with in-depth knowledge of the
JSA methodology and experience in applying the method atelast once or twice. Team members should
receive overview training using the JSA Guideline & referring to previous JSAs.
Team
The team leader should be technically trained on JSA methodology. The team members must represent a
cross section of the disciplines involved in executing the job. It is extremely important to put the most
experienced and knowledgeable resource for this activity as inexperienced team tend to conduct a poor
quality JSA . The team should contain people from supervision and the operating levels. The membership
must include individuals with the following skills:
1) Knowledge of the basic technology involved in the operation / maintenance of the process and
equipment.
2) Hands-on operating / maintenance experience on the process or equipment.
The JSA team must conduct a field tour of the facility being studied. The team member with hands-
on experience should serve as the guide. The tour gives the team a clear picture of the job process
and the layout. The team members should break the job in logical task steps, identify potential
hazards, assign a probability level & then suggest the control measures. The JSA final document
should be reviewed with the Safety Advisor and approved by the relevent Sub SOC chairman.
SAF/2 /10 Page 2 of 16 Date Prepared:
Revision: 0 Date Revised:
Blinds to be inspected on
shift basis and sealing
verified and blind tags to
be installed.
Tyvek overalls to prevent
the resin contact with
skin. Each time a person
comes out of the vessel,
the overalls are disposed
off and new overalls worn
for the next entry (Resp :
CR-
Asia).
3 Set up equipment on Buildup of static S Earth all electrical supply
top of vessel electricity – possible connections. All earthing
ignition source connections on converter
top to be through ELCB
(Resp : EAPCL).
M
Slip/trip hazards Secure hoses, etc. on
SAF/2 /10 Page 2 of 16 Date Prepared:
Revision: 0 Date Revised:
outside of vessel
walkways/scaffolding.
Ensure hose joints are
clamped and tied
M securely to handrails.
Heat stress – accessing (Resp : CR- Asia)
and settingup
equipment Rest cycle as required.
(Resp: CR-Asia) Sufficient
H supply of potable water
and soft drinks on
Hoses/equipment converter top. (Resp :
falling from height EAPCL)
Hoses/leads on top of
vessel to be neatly coiled.
(Resp : CR-Asia).
Toe boards to be
provided on scaffolding.
And scaffolding to be
certified (Resp : EAPCL)
Area to be barricaded to be
decided by EAPCL and CR-
Asia.
4 Entry into vessel to Fall while accessing S Person entering vessel to be
remove catalyst and/ vessel and moving. secured to “grip tech” fall
or converter internals. protection equipment when
entering vessel and moving
within the vessel (vertical
entry). In addition to this,
life line also to be provided.
(Resp : CR-Asia)
LEL situation in (and S
on top of vessel) Confined space entry
permit system to be adhere
to – continuous
SAF/2 /10 Page 2 of 16 Date Prepared:
Revision: 0 Date Revised:
atmospheric monitoring of
atmosphere in and on top
of vessel. (Resp : CR-Asia)
Breathing apparatus to be
worn by personnel entering
vessel – CR inert
Heat stress procedures reviewed by
M EAPCL and entry
conditions apply. (Resp :
CR-Asia)
Standby personnel
Temperature rise. H (minimum of 2) on top of
vessel at all times (constant
communication with person
inside) (Resp : CR-Asia)
Temperature monitoring by
EAPCL on TDC. If
temperature increases by 9
deg F CR-Asia to be
informed, vessel entry to
be discontinued and
introduction of massive
amount of nitrogen into the
Ladder swings H vessel. For details refer to
the process specification.
(Resp : EAPCL).
Air supply fails. S
Secure ladder at the bottom
if needed. (Resp : CR-Asia).
Rescue of personnel Personnel to vacate the
required from inside vessel and EAPCL
the vessel. supervisor to be informed.
Seconday and tertiary air
supply is, however,
available. (Resp : CR-Asia)
Please refer to the process
specification for details.
EAPCL supervisor to be
informed. The first priority
is to pull him out by using
grip tech fall equipment or
life line. In case this is nt
SAF/2 /10 Page 2 of 16 Date Prepared:
Revision: 0 Date Revised:
adhered to).
Wrong loading S Load as per EAPCL
sequence loading diagram. Pre-
reduced and unreduced
catalyst drums to be
placed in separate stacks.
H
Temperature Rise Temperature monitoring
(Resp : EAPCL)
Inject massive amount
of nitrogen into the
vessel. (Resp:EAPCL)
O2 and LEL
monitoring. (Resp :
CR-Asia)
7 Close vessel and Rain entering vessel S Place boards and traps over
decommissioning of site manway plus tarpaulin. No
water to enter vessel.
Follow the EAPCL
rain contingency plan.
Special PPEs
Required:
Sr. Task Step Potential Hazard Prob. Control Measures
No. Level