Estimate Try Tables For Backup Computations

This document provides material takeoff and quantity estimates for various construction items for an excavation project. It includes estimates for excavation volumes, concrete works for footings and beams, rebar requirements, masonry works, electrical works, plumbing materials, and summaries of quantities needed for steel, roof framing, paint, tiles, and other items. The total material quantities estimated include a 10% contingency for most items.

Uploaded by

Juneld Ian Ramos
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views

Estimate Try Tables For Backup Computations

This document provides material takeoff and quantity estimates for various construction items for an excavation project. It includes estimates for excavation volumes, concrete works for footings and beams, rebar requirements, masonry works, electrical works, plumbing materials, and summaries of quantities needed for steel, roof framing, paint, tiles, and other items. The total material quantities estimated include a 10% contingency for most items.

Uploaded by

Juneld Ian Ramos
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 12

EXCAVATION VOLUMES

L (m) W (m) D (m) Volume ExcavQty Total Volume (m^3)


Footing F1 1.2 1.2 1.5 2.16 24 51.84
Beam FTB 01 30.8 0.25 0.4 3.08 32 98.56
Wall Footing 01
Gravel Fill 01
Septic Vault
TOTAL

SLAB ON GRADE FILL


Slab Area (sq D (m) Volume (cu.m)
Earthfill
Gravel Fill
Granular Fill

FOUNDATION VOLUMES
L (m) W (m) D (m) Volume ExcavQty Total Volume (m^3)
Footing F1
Beam FTB 01
Wall Footing 01
TOTAL

CONCRETING WORKS
Item Description L/H (m) W (m) T (m) Vol. (m^3) Qty Total Vol. + 10% Contingency
FOOTINGS
1 Footing F1 1.2 1.2 0.3 0.432 12
2 Wall Footing 01

Concrete Class A
Cement
Gravel
Sand

Rebar length LONG/ Top&bot


Rebar (m)
length Rebar Size Total RequireEquivalent noTire Wire Reqd (kg)

COLUMNS
1 Columns C1

Concrete Class A Unit


Cement bags
Gravel cu.m
Sand cu.m

Main Bars Tie Bars Tie Wire Reqd (kg)


reqd length +Size Equiv. nos of Bar length eacNo. of loops/ Size Equiv. nos of 6-meter length (w/ 10% contige

BEAMS
1 Beam RB1
2 Beam RB2
3 Beam RB3
4 Beam FTB 01
5 Beam FTB 02
Subtotal

Concrete Class A Unit


Cement bags
Gravel cu.m
Sand cu.m

No. of top ba No. of bot. baTotal length Rebar Size Eq. nos of 6-meter length

Stirrups Tie Wire


Size No. of beamsTotal No. of slength of bar Total reqd st Equiv. nos of 6-meter length

SLAB
1 Slab on grade Main
2 Slab on grade BR1
3 Slab on grade BR2
4 Slab on grade T&B
5 Slab on grade CP
6 Slab on grade Porch
7 Slab on grade SA
Subtotal

Concrete ClasMain House Unit CP Stairs


Cement
Gravel
Sand

No. of steel Total rebars Size Total equiv. Tie wire reqd (kg)

MASONRY WORKS Rebar


CHB Wall Effective HeigLength (m) Window AreaDoor Area (sqEffective wal Required No. Hor

Cement MortEffective wal CHB size Cement "TypeFine Sand

Plastering walEffective wal Wall area x 2 Plaster FactorCement Fine Sand


MATERIALS SUMMARY FOR STEEL
Item Total Length Qty Reqd of 6-meter + 10% contingency

ROOF FRAMNG WORKS


Item Reqd Length (m) Length (ft) Unit price/sh unit price/pc Subtotal

PAINT WORKS
Location Area (sq.m) Area +10% contingency (sq.m)

Items Unit Reqd qty

PLUMBING MATERIALS SUMMARY


Item Reqd Unit
SEPTIC VAULT
L (m) W (m) T (m) Reqd Unit
Length Height Area Cement Fine sand
Internal wall plaster

CEILING MATERIALS
Total area (s Area Per SheeRequired Quantity + 10% contingency

Rooms Length Width Hor SpVer spacing Total Area Number of 4 Number of Ceiling Joint Reqd (bd ft.)

TILE WORKS
Total Area (sqm) Tile area (sq Tile Size No. of Tiles Price Subtotal

ELECTRICAL WORKS
Items Qty Unit
Item No. Description Area Qty Unit
otal Vol. + 10% Contingency
e Wire Reqd (kg)
-meter length (w/ 10% contigency)
Rebar
Ver Size Total Reqd length (m) + 5% contingency
ing Joint Reqd (bd ft.)