Estimate Try Tables For Backup Computations
Estimate Try Tables For Backup Computations
FOUNDATION VOLUMES
L (m) W (m) D (m) Volume ExcavQty Total Volume (m^3)
Footing F1
Beam FTB 01
Wall Footing 01
TOTAL
CONCRETING WORKS
Item Description L/H (m) W (m) T (m) Vol. (m^3) Qty Total Vol. + 10% Contingency
FOOTINGS
1 Footing F1 1.2 1.2 0.3 0.432 12
2 Wall Footing 01
Concrete Class A
Cement
Gravel
Sand
COLUMNS
1 Columns C1
BEAMS
1 Beam RB1
2 Beam RB2
3 Beam RB3
4 Beam FTB 01
5 Beam FTB 02
Subtotal
No. of top ba No. of bot. baTotal length Rebar Size Eq. nos of 6-meter length
SLAB
1 Slab on grade Main
2 Slab on grade BR1
3 Slab on grade BR2
4 Slab on grade T&B
5 Slab on grade CP
6 Slab on grade Porch
7 Slab on grade SA
Subtotal
No. of steel Total rebars Size Total equiv. Tie wire reqd (kg)
PAINT WORKS
Location Area (sq.m) Area +10% contingency (sq.m)
CEILING MATERIALS
Total area (s Area Per SheeRequired Quantity + 10% contingency
Rooms Length Width Hor SpVer spacing Total Area Number of 4 Number of Ceiling Joint Reqd (bd ft.)
TILE WORKS
Total Area (sqm) Tile area (sq Tile Size No. of Tiles Price Subtotal
ELECTRICAL WORKS
Items Qty Unit
Item No. Description Area Qty Unit
otal Vol. + 10% Contingency
e Wire Reqd (kg)
-meter length (w/ 10% contigency)
Rebar
Ver Size Total Reqd length (m) + 5% contingency
ing Joint Reqd (bd ft.)