SAWT Training
SAWT Training
SAWT Training
Part one
Differences among VAWTs
Advantages of VAWT
● Safer
● Noise-free
● Lower tower
● Bird-friendly
● Easy maintenance
X For such turbines, the inside mill drive the outside mill, but the inside mill
causes turbulence which negatively influences the outside mill. Therefore,
combined drag-and-lift type VAWTs have a relatively low efficiency.
X Advantages : Simple structure; low cost.
X Disadvantages: Low efficiency; difficulty in over-speed regulation; narrow
working wind speed range; poor capability to withstand heavy
wind.
Lift-type VAWTs
X Since the blades are held at both ends, the structure can best maintain the inside-
and-outside air pressure difference during rotation. Thus such turbines perform
best aerodynamically. However, the long main shaft experiences bigger bending
moment, which is not ideal for mechanical structure and can lead to vibration.
X Advantages : Good aerodynamic performance
X Disadvantages: Longer main shaft; heavier
Shortened shaft; blades
are held in the middle
X This mill structure strikes a balance between aerodynamic efficiency and mechanical structure. Flaps
at both ends of blades help to maintain the air pressure difference between the inside-and-outside the
mill. With appropriate width of the blades, 5 blades is easy to start, good aerodynamic efficiency and
mechanical structure, pitch control device between blades and shaft operate to regulate rotation
speed; wide working wind speed range; with auto braking system, thus most suitable to be
commercialized
X Advantages : High efficiency; easy to start; wide working wind speed range; strong structure and
good ability to withstand heavy wind
X Disadvantages: Heavier; relatively costly
Pitch device
► When the wind speed exceeds the rated wind speed (12m/s), the pitch angle controlling
device will work automatically. It will maintain the RPM and power of the turbine.
This function is essential to VAWTs.
► The pitch device allows the mill to work at wind speed up to 25m/s. Thus ensures a wider
range of working wind speeds.
SAWT’s Auto-brake Structure
Brake for 1kw & 3kw turbines Brake for 5kw & 10kw turbines
X Braking system protects the wind turbine from disintegrating caused by over-
speed rotation in very high wind speeds. SAWT’s braking system keeps
turbines safe at wind speed up to 50-55m/s.
Wind
direction
Wind turbines could not be installed
in downwind area of buildings or close to buildings.
Wind
direction
Examples of inappropriate installation
Close to trees
Close to buildings and trees,
Buildings can influence a wind turbine’s performance positively,
enhancing the wind utilization ratio, if the layout of buildings can
collect wind.
l h
h1
d D
Wind
direction H
L
Determination of turbine installation height h when
H=30m, L=20m, h1=1m, D=30m
l
2 4 6 8 10 12 14 16 18
d
1 4.2 4.8 5.4 6.0 6.6 7.2 7.8 8.2 8.4
l
2 4 6 8 10 12 14 16 18
d
1 5.2 5.4 6.0 6.6 7.0 7.6 8.0 8.4 8.8
l
2 4 6 8 10 12 14 16 18
d
l
20 22 24 26 28
d
l
2 4 6 8 10 12 14 16 18
d
l
20 22 24 26 28
d
l
2 4 6 8 10 12 14 16 18
d
l
20 22 24 26 28
d
l
2 4 6 8 10 12 14 16 18
d
l
20 22 24 26 28
d
Wind speed
isoline
Possible
location for
wind turbines
Possible
location for
wind turbines
Possible
location for
wind turbines
Tilt roof
Wind speed
separation line
Wind
direction
d
h
风向
l
H
L
Determination of turbine installation height h when
H=8m, L=10m, D=25m
l
d 5 4 3 2 1
Wind
3D
direction
7H
Turbines are too close. One
will influence the other.
In addition, installation of wind turbines shall
avoid possible light pollution, i.e. avoid shadow
of the turning blades falls over the dwelling.
Part three
Maintaining
When pitch system works
► When the generator voltage reaches AC 280v, the brake will work to
shut down the mill. The brake will be released automatically after 3
hours.
Connecting of solenoid brake
(for 1kw & 3kw turbines)
Generator Controller
connecting block connecting block
Generator input
► Solenoid brake has two stages. The first is a drum brake and the
second is a pin lock.
► The drum brake is to stop the mill for short periods, while the pin
lock is to lock the mill for 3 hours.
► During the second stage, manual operation will override.
Brake inspect
(for 1kw & 3kw turbines)
► Press the Emergency button, and the manual brake function will start. The mill
should be stopped within a few seconds or dozens of seconds. If not, please press
the Emergency brake again and measure the W2/U2 and W2/V2 voltage with a
voltage meter.
► The W2/U2 and W2/V2 voltage: DC 48v for 1kw turbines, DC 110 for 3kw
turbines. W2/U2 is connected to the brake. Its working time is 3 minutes. W2/V2
is connected to the pin lock. Its working time is 3 hours. Manual operation will
override automatic braking.
► The controller will check the RPM of mill. If it is very slow or stop for 180
second, the pin lock will start to lock the mill. If the RPM of mill is still high the
pin lock will not start.
► For off grid system, the W2/U2 voltage is voltage of the battery.
Connecting of hydraulic brake
(for 5kw & 10kw turbines)
Generator Controller
connecting block connecting block
W2 is a common terminal; U2 is for applying of the brake; V2 is for releasing the brake.
Inspect the brake connecting
Generator input
► Hydraulic brake is a one-stage brake. The brake locks the mill for
3 hours. After 3 hours, the brake will be released automatically.
► During the braking process, manual operation will override.
Brake inspect
(for 5kw & 10kw turbines)
► Press the Emergency button, and the yellow LED will flash for 20 seconds. The
manual brake function will start. The mill should be stopped within a few
seconds. If not, please press the Emergency brake button again and measure the
W2/U2 voltage within 20 seconds.
► The W2/U2 voltage is DC 24. W2/U2 is increasing the oil press. Its working
time is 20 seconds. Press the Emergency button again after the brake working,
the W2/V2 has a 24v voltage in 1 minutes.
► W2/V2 is releasing the oil press. Its working time is 1 minute. Press the
Emergency button again, the braking process will be stopped. i.e. first press is to
start the brake and second press is to release the brake.
► The auto-brake will remain applied for 3 hours. But manual operation will override.
How to check for leakage
► The shaded area represents the electricity generated. It is smaller than the dotted
area.
Formulas for calculating output
If average wind speed is 4m/s, it can be 0m/s in 55% and 8.4m/s in 45%, so the
electricity produced is 0.6125*10.8*0.26*8.4*8.4*8.4*0.45=458w.
It is 4.6 times of 110w.
110w
If average wind speed is 11m/s, it can be 8m/s in 80% and 23m/s in 20%, so the
electricity produced is 0.6125*10.8*0.26*8*8*8*0.8+3600*0.2=880+720w=1600w.
It is 70% of 2290w.
Electricity generated at different average wind speed
and will depend on by the wind condition of average
Average wind
speed (m/s
Annual
(m/s)) 2 3 4 5 6 7 8
energy
Turbiene (KWH)
Model