SPLIT2 Rectifier Room - Gedung - Lt.3
SPLIT2 Rectifier Room - Gedung - Lt.3
SPLIT2 Rectifier Room - Gedung - Lt.3
Page 1 of 10
I. Safety Precautions
A. General Safety
• Before maintaining the equipment, read this document and observe all the safety instructions on the equipment and in this document.
• The "NOTICE", "CAUTION", "WARNING", and "DANGER" statements in this document do not cover all the safety instructions. They are only supplements to the
safety instructions. Huawei will not be liable for any consequence caused by the violation of general safety requirements or design, production, and usage
safety standards.
B. General Requirements
• Before maintaining the equipment, remove any conductive objects such as watches or metal jewelry like bracelets, bangles, and rings to avoid electric shock.
• When operating, or maintaining the equipment, wear dedicated protective gears such as insulation gloves, goggles, and safety clothing, helmet, and shoes, as
shown in the following figure.
• Use insulated tools or tools with insulated handles
• Follow the specified procedures for operation, and maintenance
• In the case of a fire, immediately leave the building or the equipment area, and turn on the fire alarm bell or make an emergency call. Do not enter the
building on fire in any case.
C. Personal Safety
• If there is a probability of personal injury or equipment damage during operations on the equipment, immediately stop the operations, report the case to the
supervisor, and take feasible protective measures.
II. Personnel Requirements
• Personnel who plan to maintain Huawei equipment must receive through training, understand all necessary safety precautions, and be able to correctly perform
all operations.
• Only qualified professionals or trained personnel are allowed to operate, and maintain the equipment.
• Only qualified professionals are allowed to remove safety facilities and inspect the equipment.
• Personnel who will operate the equipment, including operators, trained personnel, and professionals, should possess the local national required qualifications in
special operations such as high-voltage operations, working at heights, and operations of special equipment.
Page 2 of 10
Split, Standing, VRV/VRF Type Air Conditioner
PREVENTIVE MAINTENANCE CHECK LIST
Page 3 of 10
C Outdoor OK NOK N/A Value
1 Condenser cleaning √
2 Axial flow-Fan & Motor condition √
3 Capacitor compressor √ 50Uf+ 5%
4 Compressor condition √
5 Outdoor unit position (No Obstacle/Blocking) √
6 Outdoor Cage condition, Lock √
7 Compressor winding measurement:
a. Common (C) to Start (S) Range 0-30Ω √ 3.2 Ω
b. Common (C) to Run (R) Range 0-30Ω √ 9.8 Ω
D COMPRESSOR OK NOK N/A Value
1 Compressor Measurement (Ampere) √ 0A
Compressor input voltage (Range 220 ±10%)
2 UNDER <198Vac, NORMAL: 198-242Vac, OVER:>242Vac
√ 0Vac
E REFRIGERANT OK NOK N/A Value
1 Refrigerant pipes condition (No leakage) √
2 Refrigerant Type √ R32
3 Refrigerant Measurement √ 0Psi
Threshold: R32 R410A R22
UNDER: <100psi UNDER: <100psi UNDER <55psi
Suction Pressure (psi) NORMAL: 100psi - 110psi NORMAL: 100psi – 145psi NORMAL: 55psi – 85psi
OVER: >110psi OVER: >145psi OVER: >85psi
UNDER: <325psi UNDER: <325psi UNDER: <200psi
Discharge Pressure (psi) NORMAL: 325psi - 450psi NORMAL: 325psi – 450psi NORMAL: 200psi-280psi
OVER: >450psi OVER: >450psi OVER: >280psi
F PANEL SYSTEM OK NOK N/A Value
1 Main Input Rate MCB at ACPDB/SDP/MDP √ 20 A
2 Connected to AC Control √
3 Running Configuration, Duration √
4 Main input Rate MCB for the unit √ 20 A
G Final Conclusion: AC ABNORMAL,
Condenser leakage, compressor broken
Page 4 of 10
H Part List For Replacement (propose) :
Need replaced condenser and compressor
Date Date
Date Date
Page 5 of 10
1 View Of Airconditioning Unit 2 Room Temperature Humidity (before) 3 Room Temperature Humidity (after)
4 Evaporator Before Cleaning 5 Evaporator After Cleaning 6 Air Filter after Cleaning
Page 6 of 10
7 Cross-Flow After Cleaning 8 Overall Indoor Cleaning Process 9 Remote Control (Photo with Set Point Temp)
10 Condenser Status Before Cleaning 11 Condenser Status Cleaning Process 12 Condenser Status After cleaning
Page 7 of 10
13 Axial Flow-Fan & Motor Condition 14 Capacitor Compressor 15 Compressor Condition (clear photo with type)
16 Outdoor View and Cage Condition, lock 17 Compressor Winding Measurement (1) 18 Compressor Winding Measurement (2)
Page 8 of 10
19 Compressor Measurement (Ampere) 20 Compressor Input Voltage 21 Refrigerant Measurement (1)
22 Refrigerant Measurement (2) 23 Main Input Rate MCB at ACPDB/SDP/MDP 24 AC Control Panel ( if any )
NA NA
Page 9 of 10