Audit Plan Sample
Audit Plan Sample
Cert. No.:
Page 1 / 5
Production site(s)/ : Lapangan Produksi DOH JBB Cemara, Losarang, Jawa Barat
subsidiary(ies)
Order Number :
Date of Audit :
Lead Auditor :
Auditor(s) :
Translator(s) / : -
Interpreter(s)
This audit plan lists the expected time and duration for each audit activity, based on the information in the quality
manual and other documents. Break times are flexible and can be matched to each company area. Company
representatives should be informed about the audit, and be available to the team(s) in each department. Any
objections to this plan should immediately be clarified with the lead auditor.
2006-01-06 Auditor:
Date Name Signature
Page 2 of 5
Day One
Feb 09
07:30 travel by car to Cemara-Indramayu
11:00 arrival at Cemara Field - Indramayu greeting
11:10 Managers, Management opening meeting,
Representative introduction to company,
fine-tuning of audit plan
Page 3 of 5
Day Two
Dec 17
08:30 Top Management 5.1 Management commitment
President Director, MR 5.2 Customer focus
5.3 Quality policy
5.4 Planning
5.5 Responsibility, … communication
5.6 Management review
6.1 Provision of resources
7.2 Cust.-related processes
8.2.1 Customer Satisfaction
8.5 Improvement
09:00 Management Representative and ISO MR, Internal Auditor verification of corrective action from
Team and Document previous audit and
Controller changes in the quality system
4.1 General requirements
4.2 Documentation reqs.
5.4 Planning
5.6 Management review
8.1 Measurement…: General
8.2.2 Internal audit
8.4 Analysis Data
8.5.2 Corrective action
8.5.3 Preventive action
Page 4 of 5
Within four weeks following the audit, please submit the deviation reports (originals) showing the
corrections and proposed corrective and preventive actions and due dates (plan for the implementation).
Where a deviation indicates to submit new documents, please attach copies.
For a follow-up audit, please have available as evidence the originals of previous deviation reports.
Page 5 of 5