An operator drilling in shallow waters offshore Bahrain required a cuttings containment system and re-injection package that could be installed temporarily on a small rig with limited space. NOV FluidControl engineers designed a custom system that could be installed within 96 hours without disrupting the tight drilling schedule. Over the course of the project, over 7,000 barrels of cuttings slurry were successfully re-injected without environmental issues. The installation and removal of the re-injection unit was also completed on time and without interrupting drilling.
An operator drilling in shallow waters offshore Bahrain required a cuttings containment system and re-injection package that could be installed temporarily on a small rig with limited space. NOV FluidControl engineers designed a custom system that could be installed within 96 hours without disrupting the tight drilling schedule. Over the course of the project, over 7,000 barrels of cuttings slurry were successfully re-injected without environmental issues. The installation and removal of the re-injection unit was also completed on time and without interrupting drilling.
An operator drilling in shallow waters offshore Bahrain required a cuttings containment system and re-injection package that could be installed temporarily on a small rig with limited space. NOV FluidControl engineers designed a custom system that could be installed within 96 hours without disrupting the tight drilling schedule. Over the course of the project, over 7,000 barrels of cuttings slurry were successfully re-injected without environmental issues. The installation and removal of the re-injection unit was also completed on time and without interrupting drilling.
An operator drilling in shallow waters offshore Bahrain required a cuttings containment system and re-injection package that could be installed temporarily on a small rig with limited space. NOV FluidControl engineers designed a custom system that could be installed within 96 hours without disrupting the tight drilling schedule. Over the course of the project, over 7,000 barrels of cuttings slurry were successfully re-injected without environmental issues. The installation and removal of the re-injection unit was also completed on time and without interrupting drilling.
FluidControl Engineers Challenging CRI Installation in
Environmentally Sensitive Area Offshore Bahrain Challenges • Drilling in shallow water, environmentally sensitive area (Dugong feeding ground). • Small rig that could position itself in shallow water and avoid damaging marine life was required, which meant limited deck space. • Because of space restrictions, CRI unit could not be pre installed in the yard. • Short term contract requiring precise execution.
Well Information • Shallow water (<30ft) • Location: Offshore Bahrain
Solution & Results
• NOV FluidControl engineered a Because of rig space constraints, an operator drilling any unscheduled maintenance to the CRI package. cuttings containment system in shallow water offshore Bahrain required a cuttings Over the course of the project, the cuttings slurry and a cuttings re-injection containment system and cuttings re-injection was re-injected without environmental incident. package for a short term package that could be installed temporarily on Rig down of the CRI and skip & ship equipment was injection program. Space the rig and safely removed after use. The project completed in one day, and the well was successfully required a service provider with the experience to drilled within the operator’s specified time restraints on the small rig preplan, engineer and install the equipment without parameters. A total of approximately of 7000 bbl. was required that NOV welders disrupting a tight drilling schedule. NOV FluidControl injected in a short time period. create custom-made load engineers surveyed the rig and engineered a unit bearing frames and other custom that was compatible with the rig’s compact footprint. The equipment package consisted of: parts for the containment and The initial operation required the rig to conduct a • 1 x 12mtr, 12” screw conveyor (length of shale re-injection system. skip and ship operation to collect cuttings from top shakers) • Equipment quickly mobilized hole drilling until the injection zone was reached. • 1 x 6mtr, 12” screw conveyor from primary auger to between contract award and skip & ship and CRI package installation. Upon reaching casing point the rig conducted • 1 x CRI slurrification unit, consisting of a course and offline activities that allowed FluidControl a 96 hour a fines tank. • Cuttings re-injection completed window to install the cuttings re-injection package • 1 x Twin low pressure injection pump successfully with no in order to drill the remainder of the well. It was environmental impact. important that the operation could switch between Contact a NOV FluidControl representative to learn • Installation and removal of skip & ship (for collecting drilled out shoe and more about Cuttings Re-injection and other waste CRI unit completed with no cement) and CRI with no interruption to drilling. This transfer and containment needs. interruption to drilling schedule. also provided a contingency back up in the case of