Manhattan Island Definitions
Manhattan Island Definitions
Instrumentation
Contractor
Mechanical
Equipment
Handover
Packs per
Packs per
Structural
Handover
Electrical
RFC ( C2) Area Description Sub Areas Included
Number
Vendor
Island Date
Piping
Civil
Land clearance & Levelling 1 1
Small Power and Lighting 1 1
H1 28-Nov-14 Lay Down Area 1 Autogenous Milling 4 1
Water 1
Fencing 1 1
H4 01-Jun-15 Access Road South West of Flotation Land clearance & Levelling 1 1 1
Civil 1 1
H6 19-Oct-15 Flotation Internal Pipe Rack Steelwork 3 1 1
Small Power and Lighting 1 1
Civil 1 1
H7 19-Oct-15 Pipe Rack from Flotation to SMP Steelwork 3 1 1
Small Power and Lighting 1 1
Civil 1 1
H8 19-Oct-15 General Pipe & Cable Racks Steelwork 3 1 1
Small Power and Lighting 1 1
H9 23-Oct-15 Earthing & Lightning Protection - Underground Earth Mats and rebar Tie-in 1 1 1
H 10 23-Oct-15 Earthing & Lightning Protection - Underground Earth Mats and rebar Tie-in 1 1 1
Civil 1 1
Pipe/Cable Rack from Flotation
H 11 12-Nov-15 Steelwork 3 1 1
Substation to Flotation 1
Small Power and Lighting 1
Civil 1 1
H 13 08-Mar-16 SMP Transformer Bay Small Power and Lighting 3 1 1
Earthing 1 1
Lan 1 1
H 14 18-Mar-16 Communication Services 2 1
Fibre 1
Instrumentation
Contractor
Mechanical
Equipment
Handover
Packs per
Packs per
Structural
Handover
Electrical
RFC ( C2) Area Description Sub Areas Included
Number
Vendor
Island Date
Piping
Civil
Civil for equipment in Pack 1 1
Steelwork for equipment in Pack 1 1
Small Power and Lighting 1 1
19-109-001 Collector Dosing Pump Drip Tray 1 1
19-106-002 Collector Area Eye Bath 2 1 1
19-30-036 Collector Transfer Pump 4 1 1 1 1
19-30-046 Collector Transfer Pump S/B 4 1 1 1 1
19-30-011 Rougher Collector Dosage Pump 4 1 1 1 1
H 21 06-May-16 SIBX Distribution
19-30-012 Surge Tank Collector Dosage Pump
42 1 1 1 1
4
19-30-014 Cleaner Collector Dosage Pump 4 1 1 1 1
19-30-015 Standby Collector Dosage Pump 4 1 1 1 1
19-15-024 Collector Area Spillage Pump 3 1 1 1
19-03-011 Collector Area Spillage Sump Screen 1 1
19-15-025 Collector Area Spillage Sump 3 1 1 1
19-107-002 Collector Area Safety Shower 2 1 1
19-12-002 Collector Holding Tank 3 1 1 1
Instrumentation
Contractor
Mechanical
Equipment
Handover
Packs per
Packs per
Structural
Handover
Electrical
RFC ( C2) Area Description Sub Areas Included
Number
Vendor
Island Date
Piping
Civil
Civil for equipment in Pack 1 1
Steelwork for equipment in Pack 1 1
Small Power and Lighting 1 1
19-50-004 Instrument Air Compressor 1 5 1 1 1 1 1
19-50-005 Instrument Air Compressor 2 5 1 1 1 1 1
19-70-001 Instrument Air Dryer 1 5 1 1 1 1 1
19-70-002 Instrument Air Dryer 2 5 1 1 1 1 1
Instrument Air Compressor 19-35-005 Instrument Air Compressor 1 Inlet Filter 2 1 1
H 31 18-May-16 42
SMP/Flotation 19-35-006 Instrument Air Compressor 2 Inlet Filter 2 1 1
19-35-007 Instrument Air Compressor 1 Primary Oil Filter 2 1 1
19-35-008 Instrument Air Compressor 2 Primary Oil Filter 2 1 1
19-35-009 Instrument Air Dryer 1 Inlet Filter 2 1 1
19-35-010 Instrument air Dryer 2 Inlet Filter 2 1 1
19-35-011 Instrument air Dryer Outlet Filter 1 2 1 1
19-35-012 Instrument air Dryer Outlet Filter 2 2 1 1
19-14-001 Instrument Air Receiver 3 1 1 1
Instrumentation
Contractor
Mechanical
Equipment
Handover
Packs per
Packs per
Structural
Handover
Electrical
RFC ( C2) Area Description Sub Areas Included
Number
Vendor
Island Date
Piping
Civil
Civil for equipment in Pack 1 1
Steelwork for equipment in Pack 1 1
19-50-001 Flotation Air Blower 4 1 1 1 1
19-50-002 Flotation Air Blower 4 1 1 1 1
19-50-003 Flotation Air Blower 4 1 1 1 1
19-35-002 Aeration Blower Suction Air Filter 2 1 1
19-35-003 Aeration Blower Suction Air Filter 2 1 1
19-35-004 Aeration Blower Suction Air Filter 2 1 1
H38 02-Jun-16 Blowers - Flotation 19-108-001 Aeration Blower Suction Silencer 29 1 1
19-108-002 Aeration Blower Suction Silencer 1 1
19-108-003 Aeration Blower Suction Silencer 1 1
19-108-004 Aeration Blower Discharge Silencer 1 1
19-108-005 Aeration Blower Discharge Silencer 1 1
19-108-006 Aeration Blower Discharge Silencer 1 1
19-108-007 Aeration Blower Unloader Silencer 1 1
19-108-008 Aeration Blower Unloader Silencer 1 1
19-108-009 Aeration Blower Unloader Silencer 1 1
Civil 1 1
Steelwork for equipment in Pack 1 1
Small Power and Lighting 1 1
Fire Detection 3 1 1 1
19-55-300 HVAC 3 1 1 1
19-24-300 11kV 2500A 31.5kA Switch Board 3 1 1 1
19-24-301 11kV 2500A 31.5kA Switch Board 3 1 1 1
19-24-302 3.3kV 2500A 31.5kA Switch Board 3 1 1 1
19-24-303 3.3kV 2500A 31.5kA Switch Board 3 1 1 1
19-26-300 BTU 1 1
19-26-301 BTU 1 1
19-26-302 BTU 1 1
19-26-303 BTU 1 1
19-23-301 11kV to 550V 1600kVA Transformer 2 1 1
19-23-302 11kV to 550V 1600kVA Transformer 2 1 1
19-23-303 11kV to 550V 1600kVA Transformer 2 1 1
19-23-304 11kV to 550V 1600kVA Transformer 2 1 1
19-23-305 11kV to 550V 1600kVA Transformer 2 1 1
19-23-306 11kV to 550V 1600kVA Transformer 2 1 1
19-23-307 11kV to 550V 1600kVA Transformer 2 1 1
19-23-309 11kV to 3300V 10 MVA Transformer 3 1 1 1
Flotation Substation, Control Room & 19-23-310 11kV to 3300V 10 MVA Transformer 3 1 1 1
H 39 08-Jun-16 97
Transformers 19-23-300 100kVA Lighting Transformer 1 1
19-LP-300 400V Flotation Lighting Distribution Board 1 1
19-LP-302 Flotation Blower Room Lighting DB 1 1
19-23-308 100kVA Lighting Transformer 1 1
19-LP-301 400V Substation Lighting Distribution Board 1 1
19-LPUPS-300 230V Substation UPS Distribution Board 1 1
19-105-300 230V Substation UPS. (5kVA Single Phase) 3 1 1 1
19-105-301 230V Substation UPS. (5kVA Single Phase) 3 1 1 1
19-LPUPS-301 400V Substation UPS Distribution Board 1 1
19-25-300 Flotation 525V MCC 1 3 1 1 1
19-25-301 Flotation 525V MCC 2 3 1 1 1
19-25-302 Flotation 525V MCC 3 3 1 1 1
19-25-303 Flotation 525V MCC 4 3 1 1 1
19-25-304 Flotation 525V MCC 5 3 1 1 1
19-25-305 Flotation 525V MCC 6 3 1 1 1
19-25-306 Flotation 525V MCC 7 3 1 1 1
19-25-307 Flotation 525V MCC 8 3 1 1 1
19-25-308 Flotation 525V MCC 9 3 1 1 1
19-25-309 Flotation 525V MCC 10 3 1 1 1
19-25-400 Flotation 525V VSD 1 3 1 1 1
19-25-401 Flotation 525V VSD 2 3 1 1 1
19-25-402 Flotation 525V VSD 3 3 1 1 1
Civil for equipment in Pack 1 1
Steelwork for equipment in Pack 1 1
13-50-300 Ore Sorter Compressor 1 5 1 1 1 1 1
13-50-301 Ore Sorter Compressor 2 5 1 1 1 1 1
13-50-302 Ore Sorter Compressor 3 5 1 1 1 1 1
13-35-300 Compressor 1 Oil Filter 1 1
13-35-301 Compressor 1 Air Dryer Inlet Filter 1 1
13-35-302 Compressor 1 Oil Filter 1 1
13-35-303 Compressor 1 Air Dryer Outlet Filter 1 1
13-35-304 Compressor 2 Oil Filter 1 1
13-35-305 Compressor 2 Oil Filter 1 1
H 40 13-Jun-16 Ore Sorter Compressor No. 1 / 2 / 3
13-35-306 Compressor 2 Air Dryer Inlet Filter
50 1
1
13-35-307 Compressor 2 Air Dryer Outlet Filter 1 1
13-35-308 Compressor 3 Oil Filter 1 1
13-35-309 Compressor 3 Oil Filter 1 1
13-35-310 Compressor 3 Air Dryer Inlet Filter 1 1
13-35-311 Compressor 3 Air Dryer Outlet Filter 1 1
13-70-300 Ore Sorter Compressor 1 Air Dryer 5 1 1 1 1 1
13-70-301 Ore Sorter Compressor 2 Air Dryer 5 1 1 1 1 1
13-70-302 Ore Sorter Compressor 3 Air Dryer 5 1 1 1 1 1
13-14-300 Ore Sorter Air Receiver 1 3 1 1 1
13-14-301 Ore Sorter Air Receiver 2 3 1 1 1
HANDOVER (C2) DEFINITIONS 23-May-14
Instrumentation
Contractor
Mechanical
Equipment
Handover
Packs per
Packs per
Structural
Handover
Electrical
RFC ( C2) Area Description Sub Areas Included
Number
Vendor
Island Date
Piping
Civil
Civil for equipment in Pack 1 1
Steelwork for equipment in Pack 1 1
19-35-001 Mill Return Water Sand Filter 3 1 1 1
Gland Seal Water Make-up &
H 41 09-Jun-16 19-30-044 Gland Seal Water Distribution Pump 1 19 4 1 1 1 1
Distribution 1 1 1 1
19-30-045 Gland Seal Water Distribution Pump 2 4
19-15-001 Gland Seal Water Area Spillage Pump 4 1 1 1 1
19-12-004 Gland Seal Water Storage Tank 2 1 1
Instrumentation
Contractor
Mechanical
Equipment
Handover
Packs per
Packs per
Structural
Handover
Electrical
RFC ( C2) Area Description Sub Areas Included
Number
Vendor
Island Date
Piping
Civil
Civil for equipment in Pack 1 1
Steelwork for equipment in Pack 1 1
Small Power and Lighting 1 1
19-13-002 Rougher Tails Sampler Feed Box 1 1
19-13-003 Rougher Cell 1 Feed Box 1 1
19-13-004 Rougher 1 Conc Sampling Box 1 1
19-13-005 Rougher 2 Conc Sampling Box 1 1
19-13-006 Rougher 3 Conc Sampling Box 1 1
19-13-007 Rougher 4 Conc Sampling Box 1 1
19-13-008 Rougher 5 Conc Sampling Box 1 1
19-13-009 Rougher 6 Conc Sampling Box 1 1
19-13-010 Rougher 7 Conc Sampling Box 1 1
19-37-001 Rougher Flotation Cell 5 1 1 1 1 1
19-37-002 Rougher Flotation Cell 5 1 1 1 1 1
19-37-003 Rougher Flotation Cell 5 1 1 1 1 1
19-37-004 Rougher Flotation Cell 5 1 1 1 1 1
19-37-005 Rougher Flotation Cell 5 1 1 1 1 1
19-37-006 Rougher Flotation Cell 5 1 1 1 1 1
19-37-007 Rougher Flotation Cell 5 1 1 1 1 1
19-30-003 Rougher Concentrate Pump 5 1 1 1 1 1
Primary Rougher Flotation Cells,
19-13-011 Rougher 1-3 Concentrate Diverter Box 1 1
H 47 05-Jul-16 Samplers, Final Flotation Sump &
19-13-012 Rougher 4-7 Concentrate Diverter Box
116 1
1
Associated Equipment 19-30-007 Rougher Concentrate Pump 4 1 1 1 1
19-30-008 Rougher Concentrate Pump 4 1 1 1 1
19-30-009 Rougher Concentrate Pump 4 1 1 1 1
19-15-003 Rougher Spillage Pump 1 4 1 1 1 1
19-15-004 Rougher Spillage Pump 2 4 1 1 1 1
19-15-005 Rougher Tails Spillage Pump 3 1 1 1
19-15-015 Rougher Spillage Pump 3 3 1 1 1
19-30-016 Rougher Tails Sampler Feed Pump No 1 4 1 1 1 1
19-30-017 Rougher Tails Sampler Feed Pump No 2 4 1 1 1 1
19-30-018 Rougher Tails Sampler Feed Pump No 3 4 1 1 1 1
19-47-003 Rougher Tails Primary Sampler 4 1 1 1 1
19-47-004 Rougher Tails Secondary Sampler 4 1 1 1 1
19-03-002 Rougher Spillage Sump 1 Screen 1 1
19-03-003 Rougher Spillage Sump 2 Screen 1 1
19-03-004 Rougher Tails Spillage Sump Screen 1 1
19-03-005 Rougher Tails Spillage Sump Screen 1 1
19-15-008 Rougher Spillage Sump 1 3 1 1 1
19-15-009 Rougher Spillage Sump 2 3 1 1 1
19-15-010 Rougher Tails Spillage Sump 3 1 1 1
19-15-011 Rougher Spillage Sump 3 3 1 1 1
Instrumentation
Contractor
Mechanical
Equipment
Handover
Packs per
Packs per
Structural
Handover
Electrical
RFC ( C2) Area Description Sub Areas Included
Number
Vendor
Island Date
Piping
Civil
Civil for equipment in Pack 1 1
Steelwork for equipment in Pack 1 1
Small Power and Lighting 1 1
19-13-025 Re-Cleaner Cell 1 Feed Box 1 1
19-13-026 Re-Cleaner 1 Sampling Box 1 1
19-13-027 Re-Cleaner 2 Sampling Box 1 1
19-13-028 Re-Cleaner 3 Sampling Box 1 1
Primary Re-Cleaner Flotation Cells & 19-13-029 Re-Cleaner 4 Sampling Box 1 1
H 49 05-Jul-16 37
Associated Equipment 19-13-030 Recleaner Concentrate Diverter Box 1 1
19-37-015 Re-Cleaner Flotation Cell 5 1 1 1 1 1
19-37-016 Re-Cleaner Flotation Cell 5 1 1 1 1 1
19-37-017 Re-Cleaner Flotation Cell 5 1 1 1 1 1
19-37-018 Re-Cleaner Flotation Cell 5 1 1 1 1 1
19-15-026 Re-Cleaner Spillage Pump 3 1 1 1
19-15-021 Re-Cleaner Spillage Sump 4 1 1 1 1
19-03-010 Re-Cleaner Spillage Sump Screen 1 1