Deliverable List Monitoring Update
Deliverable List Monitoring Update
IFR IFA
Procedure
1 DGLETC-PR-30-001-A4 02 Juli 2020 Procedure Instalasi Electrical & Cable Tray Review
Calculation
2 DGLETC-CAL-30-001-A4 08 Mei 2020 Electrical Load Data Calculation Approved with comment
3 DGLETC-CAL-30-002-A4 02 Juli 2020 Cable Sizing Calculation Review
4 DGLETC-CAL-30-003-A4 Illumination Level Calculation
Datasheet
5 DGLETC-DS-30-001-A4 17 Juni 2020 20 Juli 2020 Electrical Data Sheet for LV Switchgear and MCC Approved with comment
6 DGLETC-DS-30-002-A4 08 Mei 2020 20 Juli 2020 Electrical Data Sheet for MV Switchgear and MCC Approved with comment
7 DGLETC-DS-30-003-A4 08 Mei 2020 20 Juli 2020 Electrical Data Sheet for Power Transformer Approved with comment
8 DGLETC-DS-30-004-A4 08 Mei 2020 Electrical Data Sheet for Lighting and Recpetacle Panel Approved with comment
9 DGLETC-DS-30-005-A4 08 Mei 2020 Electrical Data Sheet for Lightning Protection & Grounding Approved with comment
10 DGLETC-DS-30-006-A4 08 Mei 2020 Electrical Data Sheet for Power Cable (LV & MV) Approved with comment
11 DGLETC-DS-30-007-A4 17 Juni 2020 Electrical Data Sheet for Control Cable LCS Approved with comment
12 DGLETC-DS-30-008-A4 17 Juni 2020 Electrical Data Sheet for Local Control Station (LCS) Approved with comment
Drawing
13 DGLETC-DG-30-001-A3 02 Juli 2020 Single Line Diagram for LV Switchgear and MCC Review
14 DGLETC-DG-30-002-A3 17 Juni 2020 Single Line Diagram for MV Switchgear Approved with comment
15 DGLETC-DG-30-003-A3 Single Line Diagram for Lighting & Distribution Panel Proses Penggantian Dok
DGLETC-DG-30-003-A3 20 Juli 2020 Standart Instalation For Power System Drawing Nama Dok Baru
16 DGLETC-DG-30-004-A3 Single Line Diagram for Grounding & Lightning Protection Proses Penggantian Dok
DGLETC-DG-30-004-A3 20 Juli 2020 Standart Instalation Detail For Lighting And Receptable Nama Dok Baru
17 DGLETC-DG-30-005-A3 08 Mei 2020 Overal Single Line Diagram Approved with comment
18 DGLETC-DG-30-006-A3 13 Juli 2020 Schematic And Connection Diagram For Switchgear And Mcc Review
19 DGLETC-DG-30-007-A3 Cable Tray and Trench Layout for General Area
20 DGLETC-DG-30-008-A3 Power and Control Wiring Layout for General Area
21 DGLETC-DG-30-009-A3 Section & Detail Power Wiring Layout for General Area
22 DGLETC-DG-30-010-A3 Cable and Gland Schedule for Power and Control
23 DGLETC-DG-30-011-A3 Street Lighting Layout for All Area
24 DGLETC-DG-30-012-A3 Lighting, Receptacle Wiring Layout for All Area
25 DGLETC-DG-30-013-A3 Connection Diagram for Lighting
26 DGLETC-DG-30-014-A3 20 Juli 2020 Panel Schedule for All Area
27 DGLETC-DG-30-015-A3 Grounding Wiring Layout for All Area
28 DGLETC-DG-30-016-A3 Lightning Protection Layout for All Area
29 DGLETC-DG-30-017-A3 Connection Diagram for Lightning Protection Proses Penggantian Dok
DGLETC-DG-30-017-A3 20 Juli 2020 Standart Installation For Grounding System Nama Dok Baru
30 DGLETC-DG-30-018-A3 13 Juli 2020 Electrical Equipment Layout for Electrical Review
31 DGLETC-DG-30-019-A3 02 Juli 2020 Identivikasi Hazardous Area Review