QCP Overall File...
QCP Overall File...
QCP Overall File...
Approved
Erbacon Construction (Pty) Ltd
QCP/ (Rev 0)
(PROVISIONAL)
CONTRACT NAME:
QCP Aproval
Submitted By Approved By
0 0
QC Manager (Project Quality Control)
Date Submitted Date Approved
Erbacon Construction (Pty) Ltd
QUALITY
CONTROL
PROFILE
Client 0
Contract Name 0
Erbacon Contract Number 0 Job Number 0
Quality Control Plan Document ref QCP I N D 0 0 1 REV NO 0
Last Revised Date 12/30/1899 Page Number 0 /11
Index Of Quality Control Plan
INDEX
Approval
Submitted By Approved By
0 0
Quality Control Manager (Project Quality Control)
Date Submitted Date Approved
Client 0
Contract Name 0
Erbacon Construction (Pty) Ltd Contract Number 0 Job Number 0
Quality Control Plan Document ref QCP I N T 0 0 1 REV NO 0
Last Revised Date 12/30/1899 Page Number 1 /11
Introduction
INTRODUCTION
In order to achieve these objectives Erbacon has developed and implemented a Quality Control Plan
based on the requirements of the Clients.
It is the management's intent that the commitments and policies outlined in this document will be
strictly followed by all personnel. Such personnel shall be trained and familiarised with such
requirements, policies and objectives set forth herein.
Approval
Submitted By Approved By
0 0
(Site Agent) (Project Quality Control)
Date Submitted Date Approved
Client 0
Contract Name 0
Erbacon Construction (Pty) Ltd Contract Number 0 Job Number 0
Quality Control Plan Document ref QCP D O C 0 0 1 REV NO 0
Last Revised Date 12/30/1899 Page Number 2 /11
Description Of Company
DESCRIPTION OF COMPANY
Erbacon is a dynamic company with resources to undertake a wide range of construction projects in
South Africa. Erbacon owns and operates the plant and equipment that is required to carry out its main
line activities which are maintained to the highest quality by its own workshops.
Erbacon permanently employees over 220 highly skilled personnel with a large cross section of skills
from which suitable terms are made up for appropriate projects.
The company believes quality to be better than quantity and throughout its existence has built a
reputation for quality and service.
Erbacon strives for increased profitability through training, innovation and taking a positive and realistic
approach to available business opportunities which is proven in the fact that the company is financially
sound and survived harsh economical conditions.
COMPANY ACTIVITIES
COMPANY OBJECTIVES
Approval
Submitted By Approved By
0 0
(Site Agent) (Project Quality Control)
Date Submitted Date Approved
Client 0
Contract Name 0
Erbacon Construction (Pty) Ltd Contract Number 0 Job Number 0
Quality Control Plan Document ref QCP D O C 0 0 1 REV NO 0
Last Revised Date 12/30/1899 Page Number 3 /11
Description Of Company (cont)
DESCRIPTION OF COMPANY
Head Office
Durban
2 Montreal Place P.O. Box 40346
Glen Anil, Durban Redhill, Durban
4051 4071
Contact Persons:
Dave Erskine 082-557-9288
Lenny Naidoo 083-298-4894
Mohammmed Butler 084-589-4786
Approval
Submitted By Approved By
0 0
(Site Agent) (Project Quality Control)
Date Submitted Date Approved
Client 0
Contract Name 0
Erbacon Construction (Pty) Ltd Contract Number 0 Job Number 0
Quality Control Plan Document ref QCP O R G 0 0 1 REV NO 0
Last Revised Date 12/30/1899 Page Number 4 /11
Company Organogram
COMPANY ORGANOGRAM
The following diagram illustrates the main disciplines and infrastructure of the company. Interaction
between disciplines and participative management are established from the start of a project to the
successful completion. This ensures maximum input and feedback from all the expertise within the
company.
Managing Director
DAVE ERSKINE
Safety Quality
Contracts Manager
B
LENNY NAIDOO
Site Agent
MOHAMMED BUTLER
Approval
Submitted By Approved By
0 0
(Site Agent) (Project Quality Control)
Date Submitted
Date Approved
Client 0
Contract Name 0
Contract Number 0 Job Number 0
Erbacon Construction (Pty) Ltd Document ref QCP C O N T 0 1 REV NO 0
Quality Control Plan
Last Revised Date 12/30/1899 Page Number 5 /11
Description Of Contract
DESCRIPTION OF CONTRACT
Description: 0
Order no: 0
Client: 0
Engineer 0
Tel no: 011 498 6009
Fax no: 011 498 6210
Cell no: 083 786 4506
E-mail:
Site Location: 0
Responsible Person: 0
Approval
Submitted By Approved By
0 0
(Site Agent) (Project Quality Control)
Date Submitted
Date Approved
Client 0
Contract Name 0
Contract Number 0 Job Number 0
Erbacon Construction (Pty) Ltd
Quality Control Plan Document ref QCP S O G 0 0 1 REV NO 0
Last Revised Date 12/30/1899 Page Number 6 /11
Site Organogram
The following diagram illustrates the main disciplines and infrastructure of the Site. Interaction between
disciplines and participative management are established from the start of a project to the
successful completion.
Approval
Submitted By Approved By
0 0
(Site Agent) (Project Quality Control)
Date Submitted
Date Approved
Client 0
Contract Name 0
CONTRACT PROGRAMME
Client 0
Contract Name 0
Contract Number 0 Job Number 0
Erbacon Construction (Pty) Ltd
Quality Control Plan Document ref QCP I T P 0 0 1 REV NO 0
Last Revised Date 12/30/1899 Page Number 8 /11
Inspection And Test Plans
Inspection and test plan procedures are set up to control and monitor the quality of various activities on site.
Each inspection and test plan sheet contains details on the contract number, activities to be inspected,
inspection plan number, location of inspection site and date of inspection.
Approval
Submitted By Approved By
0 0
(Site Agent) (Project Quality Control)
Date Submitted
Date Approved
Client 0
Contract Name 0
Contract Number 0 Job Number 0
Erbacon Construction (Pty) Ltd
Quality Control Plan Document ref QCP S O C 0 0 1 REV NO 0
Last Revised Date 12/30/1899 Page Number 9 /11
Specifications Of Contract
SPECIFICATIONS OF CONTRACT
Approval
Submitted By Approved By
0 0
(Site Agent) (Project Quality Control)
Date Submitted
Date Approved
Client 0
Contract Name 0
Erbacon Construction (Pty) Ltd Contract Number 0 Job Number 0
Quality Control Plan Document ref QCP N C R 0 0 1 REV NO 0
Last Revised Date 12/30/1899 Page Number 10 /11
Non Conformance Reports
Client 0
Contract Name 0
Contract Number 0 Job Number 0
Erbacon Construction (Pty) Ltd Document ref QCP C D I 0 0 1 REV NO 0
Quality Control Plan
Last Revised Date 12/30/1899 Page Number 11 /11
Contract Documentation Index
CONTRACT DOCUMENTATION INDEX
* Contract document
* The Client Standard Specifications
* The Client interface documents
* SABS 1200
* Minutes of Meetings
* Site Instruction / Site Engineering Query / Confirmation Sheet / Site Measurement Records
* Drawings
* Non Conformance Reports
* Quality plan
* Copy of daily diary page
Approval
Submitted By Approved By
0 0
(Site Agent) (Project Quality Control)
Date Submitted
Date Approved
Erbacon Construction (Pty) Ltd
WORKING
PROCEDURE
Client 0
Contract Name 0
Erbacon Construction (Pty) Ltd Contract Number 0 Job Number 0
Quality Control Plan Document ref QCP I W P 0 0 1 REV NO 0
Last Revised Date 12/30/1899 Page Number 0 /12
Index Of Working Procedures
INDEX
Approval
Submitted By Approved By
0 0
Quality Control Manager (Project Quality Control)
Date Submitted Date Approved
Client 0
Contract Name 0
Erbacon Construction (Pty) Ltd Contract Number 0 Job Number 0
Quality Control Plan Document ref QCP S S O 0 0 1 REV NO
Work Procedures
Last Revised Date 12/30/1899 Page Number 1
Survey / Setting Out
1) SCOPE
This procedure describes the initial receipt of survey data/setting out information from the client and
establishing on site, adequate reference pegs from which the works can be set out for construction.
2) REFERENCES
SABS 1200 A - General
Client drawings and beacons
3) PROCEDURE
3.1) Contractor to receive initial survey data from the Client in writing or on a drawing issued for
Construction and permanent beacons to be pointed out.
3.2) From initial data received, Contractor to set out the works and establish necessary reference pegs to
ensure survey control during construction period. Preferable, the Client's survey department should
carry out a check on the Contractor's reference pegs.
3.3) Any necessary temporary bench marks also to be installed from site datum level given by Client.
3.4) Any reference pegs established to be concreted in, properly marked and adequately protected by the
Foreman on that section of the works.
3.5) Damage to any survey peg to be reported immediately so that the necessary steps can be taken to
re-establish same.
3.6) Any "on site" survey documentation to be available at all times
4) SURVEY EQUIPMENT
4.1) Any survey equipment, which has been serviced and returned to site, should be accompanied by the
applicable calibration certificate.
4.2) Even calibrated equipment be checked on site monthly, to guard against damage that might have
occurred on the job.
4.3) Faulty instruments found, to be reported immediately and removed from site for repair and calibration or
to be replaced.
4.4) Tape measure and squares to be inspected regularly for wear and tear as construction proceeds.
5) DOCUMENTATION
Approval
Submitted By Approved By
0 0
Quality Control Manager (Project Quality Control)
Date Submitted Date Approved
Client 0
Contract Name 0
Erbacon Construction (Pty) Ltd Contract Number 0 Job Number 0
Quality Control Plan Document ref QCP C B M 0 0 1 REV NO
Work Procedures
Last Revised Date 12/30/1899 Page Number 2
Concrete: Blinding & Mass
1) DESCRIPTION
2) PROCEDURES
2.1) Blinding to be placed to at least the thickness and at the levels indicated on Construction Drawings.
2.2) Over excavation would normally be made up with mass concrete the same strength as the blinding
unless otherwise instructed.
2.3) After placing, blinding to be struck to an even plane and left to cure before fixing of reinforcing steel
can commence.
2.4) Trial Mixes will be carried out as per the Approved Mix Designs
2.4) All Tests will be carried out as per SABS 1200 and TMH1
Approval
Submitted By Approved By
0 0
(Site Agent) (Project Quality Control)
Date Submitted Date Approved
Client 0
Contract Name 0
Erbacon Construction (Pty) Ltd Contract Number 0 Job Number 0
Quality Control Plan Document ref QCP C P C 0 0 1 REV NO
Work Procedures
Last Revised Date 12/30/1899 Page Number 3
Concrete: Placing & Compaction
1) SCOPE
This section covers placing and vibrating of concrete on site
2) REFERENCES
SABS 1200 G
Specific Project specifications
3) PROCEDURE
3.1) Concrete placing should be carried out speedily and in such a state that it can be compacted properly.
3.2) Concrete should always be placed exactly where required or at least as close as possible.
3.3) Placing and vibration of any concrete should be planned to ensure safety, productivity and a good
end product.
3.4) Care to be taken not to damage formwork or move reinforcing or cast-in items out of position.
3.5) Concrete should always be placed in layers and special care taken when casting thin walls etc.
where it could be advisable to use a light to see into the box.
3.5.1 Concrete will be place at the prescribed rate and not discharged to a height (2m) which causes segregation
3.5.2 In excess of 2m, the concrete must be placed using chutes to prevent segregation.
3.6) The internal vibrator poker will obviously work more effectively; the more workable is the concrete.
3.7) When casting layer upon layer, the vibrator poker should pass through the present layer about 150
mm into the previous layer to ensure proper bonding of layers.
3.8) Avoid leaving the poker running when not in the concrete. This will overheat and cause damage
to the poker.
3.9) When withdrawing the poker, this should be done slowly so as not to leave any poker hole behind.
The poker then to be moved quickly to the next point of vibration close by.
3.10) Vibration with the poker should never take place against the face of the shutter.
3.11) Care to be taken that segregation does not occur especially when a shutter is deep and very heavily
reinforced. Segregation is when the cement mixed with sand, sticks to the rebar and one ends up
with virtually only stone in the bottom of the box.
3.12) When casting in layers, care to be taken that one layer follows the other quickly to avoid "cold joints"
3.13) Care to be taken when casting at elevated areas, especially when using a crane and skip.
3.14 Backup vibrators will be on standby when placing of concrete
3.15) Floating of concrete will be as per the project specification requirements.i.e. Wood, Steel, Power, Broom
3.16 Concrete cover to reinforcement will be as prescribed on the drawings or Project Specs utilising concrete cover blocks.
3.16.1 The reinforecement will be inspected and approved as per the Pre Concrete Inspection form
Approval
Submitted By Approved By
0 0
(Site Agent) (Project Quality Control)
Date Submitted Date Approved
Client 0
Contract Name 0
Erbacon Construction (Pty) Ltd Contract Number 0 Job Number 0
Quality Control Plan Document ref QCP C O C 0 0 1 REV NO
Work Procedures
Last Revised Date 12/30/1899 Page Number 4
Concrete: Curing
1) SCOPE
What is this? After concrete has reached initial set, it should be 'treated kindly' to ensure that the
concrete will indeed reach strengths required from design point of view, prevent surface/shrinkage
cracking and ensure a good working surface/impervious face, as required with such a finished product.
Concrete should never be allowed to 'dry out' to quickly, by 'curing' this drying out can be largely
controlled.
2) REFERENCES
SABS 1200G
Project specifications
Product data sheets
3) PROCEDURE
3.1) Concrete, in any instance will never perform to full potential if not properly cured.
3.2) Various curing methods:
3.2.1) Ponding of horizontal surfaces, mist spraying, damp sand or hessian sacking, plastic sheeting,
spraying or rolling on of wax or acrylic manufactured compound.
3.2.2) Vertically, by leaving formwork in position for as long as is practical, is a very good method of
curing the concrete.
3.3) Curing compound must not be applied to already dry concrete - this could cause
discolouring as it will be absorbed.
3.3.1 The curing period will be as specified by the supplier
3.4) If there is a sliding operation in progress, the curing compound would be applied as the
slide shutter moves up continuously.
3.5) Special care to be taken with curing of toppings or granolithic screeds (normally thinner) as these
can "dry out" very quickly.
3.6) As regards "safety", curing compounds are generally non-toxic but if they are proposed to be used
on a reservoir holding drinking water, a good check should be encouraged.
3.7) Take care as well: - if any fancy finishes, such as painting, epoxies, etc. are required to the concrete
later - the curing compound has to be compatible with these or manufacturer has to guarantee
that after x amount of time there will not be a problem.
3.8) All protection of placed concrete will be as stipulated in SABS 1200.i.e. Temperature, wind, humidity, sun
4) DOCUMENTATION
Approval
Submitted By Approved By
0 0
(Site Agent) (Project Quality Control)
Date Submitted Date Approved
Client 0
Contract Name 0
Erbacon Construction (Pty) Ltd Contract Number 0 Job Number 0
Quality Control Plan Document ref QCP C R S 0 0 1 REV NO
Work Procedures
Last Revised Date 12/30/1899 Page Number 5
Concrete: Reinforcing Steel
1) SCOPE
This procedure covers the receipt, storage, cutting, bending, fixing and inspection of reinforcing
steel.
2) REFERENCES
SABS 1200 G - Concrete (structural)
SABS 920 - Reinforcing for Structural concrete
Construction drawings and specifications
3) PROCEDURE
4) DOCUMENTATION
Approval
Submitted By Approved By
0 0
(Site Agent) (Project Quality Control)
Date Submitted Date Approved
Client 0
Contract Name 0
1) SCOPE
Here we cover the casting in of holding down bolts, plates, corner protector angles, sleeve, puddle
pipes, sankey/unistruts etc.
2) REFERENCES
SABS 1200 G
Project drawings & specifications
3) PROCEDURE
3.1) Cast in steel items must be clean, rust free and unpainted.
3.2) Items are to be securely fixed in place so as not to move when concreting. Welding to reinforcing
is not permitted.
3.3) H.D bolts must also be securely set in position and templates to be used to ensure bolts are at the
correct centres and elevation and to the correct angle as required..
3.4) Inspection by contractor and client to be carried out and signed off before placing of any concrete
to ensure all is within give tolerances.
3.5) After concreting, a survey to be done on the as-built product to ensure all in correct position. This
should also be done before any mechanical or structural steel contractors takes over the foundations
from the civils.
3.6 All retro cast-in items will be boxed out using polystyrene or timber box outs and cast in thereafter with approved
method statements
4) DOCUMENTATION
Approval
Submitted By Approved By
0 0
(Site Agent) (Project Quality Control)
Date Submitted Date Approved
Client 0
Contract Name 0
Erbacon Construction (Pty) Ltd Contract Number 0 Job Number 0
Quality Control Plan Document ref QCP C G C 0 0 1 REV NO
Work Procedures
Last Revised Date 12/30/1899 Page Number 7
Concrete: Grouting (cementitious)
1) SCOPE
This procedure describes generally, methods to be followed to carry out grouting under base plates
and holding down bolt sleeves where structural steel and machinery has been erected. Grout must
fill the space between the erected equipment (machines) or structural base plates and the
foundations. This grout must provide uniform bearing support, help maintain alignment, keep
packers in position and transfer loads to the foundations. Aesthetically the grout obviously all
"finishes off" the job.
2) REFERENCES
SABS 1200G: GA: GB
Manufacturers instructions
Product specification
Client specification
3) PROCEDURE
3.1) Preparation
3.1.1) The foundation surface must be free from all laitance and unsound material and thoroughly
cleaned and cured.
3.1.2) Ensure that all metal surfaces such as H.D bolts, base plates and packers are free from rust, oil or
other contaminating substances.
3.1.3) Keep foundation wet for 24 hours before grouting takes place.
3.1.4) Just before grouting is started all free standing water must be removed from any anchor
bolt sleeves and foundation surfaces over which the grout is to be placed.
3.2) Formwork
3.2.1) Where a manufacturer, in his product specification, specifies something on formwork requirements
contractor must take cognisance of this
3.2.2) Formwork in general shall be constructed so as to withstand the pressure of the grout and the
man handling required to work it into place under the base plate.
3.2.3) Any gaps should be caulked to prevent leakage and heat loss.
Approval
Submitted By Approved By
0 0
(Site Agent) (Project Quality Control)
Date Submitted Date Approved
Client 0
Contract Name 0
3.3.5) Grout which has gone "off" from mixing too long must be discarded.
3.3.6) Special care to be exercised when grouting in extreme temperatures ( hot or cold).
3.3.7) All anchor bolt sleeves to be completed prior to placing the major grout.
3.3.8) Dry pack grout should be mixed in small batches, then one or two hand fulls placed on the
foundation and rammed in solidly under the base plate. This operation is repeated until the space
is full.
3.4) Curing
3.4.1) All exposed areas of grout must be coated with a good quality curing compound, or kept wet
for at least three days or as specified.
3.4.2) Formwork shall not be removed nor machinery started up before the grout has sufficiently cured.
4) DOCUMENTATION
4.1) Grout release forms to be completed by the relevant parties and signed off by same. If the client
does not issue a grout release form the standard Erbacon grout release document to be used.
Approval
Submitted By Approved By
0 0
(Site Agent) (Project Quality Control)
Date Submitted Date Approved
Client 0
Contract Name 0
Erbacon Construction (Pty) Ltd Contract Number 0 Job Number 0
Quality Control Plan Document ref QCP B F O 0 0 1 REV NO
Work Procedures
Last Revised Date 12/30/1899 Page Number 9
Backfill Operations
1) SCOPE
Here we describe generally backfilling and tests related to same.
2) REFERENCES
SABS 1200 D
Project Specifications
Possible Site Instruction
3) PROCEDURE
3.1) Source of suitable backfill material to be identified and approved by the client.
3.2) In a lot of instances material from the foundation excavations is suitable for backfill, sufficient
excavated material should then be stockpiled for backfilling later.
3.3) Plant used must be of such a nature that will ensure that the specified compaction can be achieved.
3.4) When backfilling against structures e.g. high wall, backfill should be brought up in compacted layers
simultaneously on both sides of the structure.
3.4.1) Any loading alongside excavations must be checked prior to positioning i.e. Open excavations / top of batters
3.5) Tests are to be carried out on the proposed fill material to establish the Mod AASHTO of the material.
3.6) Each 150mm layer of fill to be compacted at OMC to the density as specified in SABS 1200.
3.7) Any area where compaction test results do not reach that specified shall be removed and re-
compacted to specification.
3.8) Backfill material to be free of stumps, trees, rubbish and other deleterious material.
3.9) The maximum stone size in the backfill layer will be 1/3rd the layer thickness.
3.10) In the event of dust - a water cart will be used to contain the dust.
4) DOCUMENTATION
4.1) Compaction Test Results - On site tesing will be carried at the prescribed specifications
Approval
Submitted By Approved By
0 0
(Site Agent) (Project Quality Control)
Date Submitted Date Approved
Client 0
Contract Name 0
Erbacon Construction (Pty) Ltd Contract Number 0 Job Number 0
Quality Control Plan Document ref QCP B P P 0 0 1 REV NO
Work Procedures
Last Revised Date 12/30/1899 Page Number 10
Batch Plant Procedures
b l e
ca
p li
Ap
o t
N
Approval
Submitted By Approved By
0 0
(Site Agent) (Project Quality Control)
Date Submitted Date Approved
Client 0
Contract Name 0
Erbacon Construction (Pty) Ltd Contract Number 0 Job Number 0
Quality Control Plan Document ref QCP B P P 0 0 1 REV NO
Work Procedures
Last Revised Date 12/30/1899 Page Number 11
Batch Plant (cont)
bl e
ca
p li
Ap
o t
N
Approval
Submitted By Approved By
0 0
(Site Agent) (Project Quality Control)
Date Submitted Date Approved
Client 0
Contract Name 0
Erbacon Construction (Pty) Ltd Contract Number 0 Job Number 0
Quality Control Plan Document ref QCP L A R 0 0 1 REV NO
Work Procedures
Last Revised Date 12/30/1899 Page Number 12
Labour Attendance Register
Approval
Submitted By Approved By
0 0
(Site Agent) (Project Quality Control)
Date Submitted Date Approved
0
0
0
0
/12
Approval
Approved By
0
0
0
0
/12
Approval
Approved By
0
0
0
0
/12
of concrete on site
Approval
Approved By
0
0
0
0
/12
Approval
Approved By
0
0
0
0
/12
crete
Approval
Approved By
0
0
0
/12
e and unpainted.
as not to move when concreting. Welding to reinforcing
ing polystyrene or timber box outs and cast in thereafter with approved
Approval
Approved By
0
0
0
0
/12
D bolts, base plates and packers are free from rust, oil or
Approval
Approved By
0
0
0
/12
Approval
Approved By
0
0
0
0
/12
Approval
Approved By
0
0
0
0
/12
Approval
Approved By
0
0
0
0
/12
Approval
Approved By
0
0
0
0
/12
Approval
Approved By
Erbacon Construction (Pty) Ltd
QCP
FORMS
Client 0
Contract Name 0
Erbacon Construction (Pty) Ltd Contract Number 0 Job Number 0
Quality Control Plan Document ref QCP I N D 0 0 1 REV NO 0
Last Revised Date 12/30/1899 Page Number 0 /17
Index Of Quality Control Forms
INDEX OF THE QUALITY CONTROL FORMS
INDEX
Approval
Submitted By Approved By
Johan Visser 0
Quality Control Manager (Project Quality Control)
Date Submitted Date Approved
QUALITY CONTROL PLAN (QCP) H - HOLD DRAWING No: CE - Consulting Engineer
JOB No : W - WITNESS RELEASE No : CR - Client Representative
CLIENT : V - VERIFY CM - Contract Manager
CLIENT CONTRACT No : S - SURVEILLANCE TITLE: SA - Site Agent
SITE : C - CERTIFICATE GF - General Foreman
D - DRAWINGS F - Foreman
REV QS - Quantity Surveyor
L - Laboratory
BP - Batch Plant
Quality Control Plan
DP - Data Pack
OPER. DESCRIPTION OF APPLICABLE CONTROL ACTIVITIES VERIFICATION
NO: ACTIVITY PROCEDURES DOCUMENT OR
OR CODES CE CR CM SA GF F QS L BP DP COMMENTS
1 Contract Award / Handover Internal H W Minutes of Meeting
4 Site Establishment
Set-up Site Organogram H Displayed
Contract Programme H H Site filing system
Site Registers S H Site filing system
Appointment of Contractors Orders H W Subcontract list/ file
Incoming Goods & Materials C Delivery docs/inpsection
5 Earthworks
Permission to Excavate SANS 1200 V W V Pre-excavation Release
Site clearance SANS 1200 V S V Measurement Records
Stripping of topsoil SANS 1200 V S V Measurement Records
Excavation SANS 1200 V S V Measurement Records
Classification of materials for use TMH 1 V S S V Laboratory Results
Importation of material SANS 1200 V S V Measurement Records
Borrow Pits V W V Measurement Records
Backfill SANS 1200 V S V Backfill Release
Compaction Testing Plate Compaction V S V W Test Results
44 of 66
QUALITY CONTROL PLAN (QCP) H - HOLD DRAWING No: CE - Consulting Engineer
JOB No : W - WITNESS RELEASE No : CR - Client Representative
CLIENT : V - VERIFY CM - Contract Manager
CLIENT CONTRACT No : S - SURVEILLANCE TITLE: SA - Site Agent
SITE : C - CERTIFICATE GF - General Foreman
D - DRAWINGS F - Foreman
REV QS - Quantity Surveyor
L - Laboratory
BP - Batch Plant
Quality Control Plan
DP - Data Pack
OPER. DESCRIPTION OF APPLICABLE CONTROL ACTIVITIES VERIFICATION
NO: ACTIVITY PROCEDURES DOCUMENT OR
6 Concrete Works
Mix Design SANS 1200 S S V Mix design on site
Bending Schedules SANS 282 S S Drawing Register
Reinforcing Steel SANS 1200 W S S W Pre Concrete Inspection
Formwork SANS 1200 W S S W Pre Concrete Inspection
Concrete Sampling & Making Cubes SANS 5861 S S W Concrete Cube Sheet
Testing of Concrete Cubes SANS 5863 S S W Concrete Cube Sheet
Concrete Placing SANS 1200 S S W Pre Concrete Inspection
Embedded Items W S S W Pre Concrete Inspection
Holding Down Bolts SANS 1200 W S S W Pre Concrete Inspection
Grouting SANS 1200 S S W Grout Release Cert
7 Building Works
Wet Trades
Mortar Mix Design SANS 1200
Brickworks Internal, External SANS 1200 W S H Pre Inspection
Treads & Risers SANS 1200 W S H Pre Inspection
Screeds SANS 1200 W S H Pre Inspection
Screeds Pebble Finish SANS 1200 W S H Pre Inspection
Plastering SANS 1200 W S H Pre Inspection
Plastering Art Finish SANS 1200 W S H Pre Inspection
Cemcrete SANS 1200 W S H Pre Inspection
Storm water Inlets, Manholes SANS 1200 W S H Pre Inspection
Stone Cladding SANS 1200 W S H Pre Inspection
Parapet SANS 1200 W S H Pre Inspection
Vanity Slabs SANS 1200 W S H Pre Inspection
Paving SANS 1200 W S H Pre Inspection
Kerbs SANS 1200 W S H Pre Inspection
45 of 66
QUALITY CONTROL PLAN (QCP) H - HOLD DRAWING No: CE - Consulting Engineer
JOB No : W - WITNESS RELEASE No : CR - Client Representative
CLIENT : V - VERIFY CM - Contract Manager
CLIENT CONTRACT No : S - SURVEILLANCE TITLE: SA - Site Agent
SITE : C - CERTIFICATE GF - General Foreman
D - DRAWINGS F - Foreman
REV QS - Quantity Surveyor
L - Laboratory
BP - Batch Plant
Quality Control Plan
DP - Data Pack
OPER. DESCRIPTION OF APPLICABLE CONTROL ACTIVITIES VERIFICATION
NO: ACTIVITY PROCEDURES DOCUMENT OR
Dry Trades
Plumbing, Sleeves I & 2nd Fix SANS 1200 W S H Pre Inspection
Electrical I & 2nd Fix SANS 1200 W S H Pre Inspection
ACTIVITY ACCEPTANCE
Services Final Fix SANS 1200 W S H Pre Inspection
Ceilings SANS 1200 W S H Pre Inspection
Painting First & Final Coats SANS 1200 W S H Pre Inspection
Roof Structures & Covering SANS 1200 W S H Pre Inspection
Air-Conditioning SANS 1200 W S H Pre Inspection
Data/Security Phone SANS 1200 W S H Pre Inspection
Doors & Windows SANS 1200 W S H Pre Inspection
Glazing SANS 1200 W S H Pre Inspection
Built in Cupboards SANS 1200 W S H Pre Inspection
Water-Mains Reticulation SANS 1200 W S H Pre Inspection
Kitchen SANS 1200 W S H Pre Inspection
Carpets SANS 1200 W S H Pre Inspection
Artwork Unit Fixtures SANS 1200 W S H Pre Inspection
Balustrade & Hand rails SANS 1200 W S H Pre Inspection
Spare Bath SANS 1200 W S H Pre Inspection
Vanity Units SANS 1200 W S H Pre Inspection
Screen Fence SANS 1200 W S H Pre Inspection
Waterproofing SANS 1200 W S H Pre Inspection
Doors & Ironmongery SANS 1200 W S H Pre Inspection
46 of 66
QUALITY CONTROL PLAN (QCP) H - HOLD DRAWING No: CE - Consulting Engineer
JOB No : W - WITNESS RELEASE No : CR - Client Representative
CLIENT : V - VERIFY CM - Contract Manager
CLIENT CONTRACT No : S - SURVEILLANCE TITLE: SA - Site Agent
SITE : C - CERTIFICATE GF - General Foreman
D - DRAWINGS F - Foreman
REV QS - Quantity Surveyor
L - Laboratory
BP - Batch Plant
Quality Control Plan
DP - Data Pack
OPER. DESCRIPTION OF APPLICABLE CONTROL ACTIVITIES VERIFICATION
NO: ACTIVITY PROCEDURES DOCUMENT OR
8 Mechanical / Electrical
Specialist QCP or Certificate from Supplier S S S By specialist suppliers
APPROVAL
1 0 3 LenMo Construction
DOCUMENT NO : QCP/AI/01 Rev 2 2 0 4 OTHER
47 of 66
DOCUMENT NO:
CONCRETE INSPECTION CIV/QCP/CIR001 (Rev0)
Completion
Date Of Inspection Release Number Structure / Section Of Work Completion Signature
Date
Verification
Registered By Verified By
0 0
QCManager (Project Quality Control)
Date Submitted Date Verified
DOCUMENT NO:
Page 3/17
PRE CONCRETE INSPECTION Page: 3/17
Date:
PROJECT: 0 JOB NO: 0
CLIENT: 0 CONTRACT NO: 0
REQUEST TO Date: SECTION :
CAST CONCRETE: Time: DRAWING NO :
RESPONSIBLE FOREMAN:
CHECKED BY :
Checked Contractor Inspection
Description Details
Erbacon Client Signature Date & Time
Blinding (1) Compaction Test
(2) Concrete Grade MPa/ mm
(3) Levels
(4) Thickness mm
Reinforcing (1) Type, diameter
(2) Spacing
(3) Cover
Formwork (1) Setting out, dimensions
(2) Levels & plumb
(3) Pockets, fillets
(4) Ties, props, fastenings
(5) Dumpy Level No.
(6) Theodolite No.
(7) Spirit Level checked
(8) Tape Measure checked
Concrete (all) (1) Mix design
(2) Concrete Grade MPa/ mm
(3) Slump mm
(4) Levels
(5) Test cubes MK
Embedded items (1) Type MK
(2) Position
(3) Fastenings and protection
H.D Bolts (1) Length
(2) Diameter
(3) Projections
(4) Pockets and protection
Waterbar (1) Type
(2) Welding
(3) Posision
Safety (1) Scaffolding
(2) Access
(3) Work Platform
(4) Handrailing
Sketch
Approval
Inspected By Approved By
0 0
QC Manager Project Quality Control
Date Inspected Date Approved
DOCUMENT NO:
CIV/QCP/PCI002 (Rev0)
POST CONCRETE INSPECTION Page: 4/17
Date:
PROJECT: Dorstfontein Overland Conveyor 40399
CLIENT: 0 CONTRACT NO: 40399
SECTION:
Checked Contractor Inspection
Item
Description Of Defective Item Completion Date Erbaco
Number Client Signature Date
n
Test Cube Results Cube Marks Age Of Test Date Of Test Test Results Tested By
(1) 7 Days
(2) 7 Days
(3) 7 Days
(4) 28 Days
(5) 28 Days
(6) 28 Days
Approval
Inspected By Approved By
0 Ravi Moodley
QC Manager (Project Quality Control)
Date Inspected Date Approved
DOCUMENT NO :
Date Cast
Date of Test
Mass Kg
Slump
CEM I 42,5 19mm Stone River Sand Plaster Sand Water Superplas
Grade & Mix Required (kg/m³)
Remarks:
QC Manager Date:
0
Page 5/17
DOCUMENT NO:
CIV/QCP/EIR001 (Rev0)
EARTHWORKS REGISTER Page: 6/17
Erbacon Construction (Pty) Ltd Date:
PROJECT: 0 JOB NO: 0
CLIENT: 0 CONTRACT NO: 0
SECTION :
Completion
Date Of Release Release Number Description Of Earthworks Completion Signature
Date
Verification
Registered By Verified By
0 0
QC Manager (Project Quality Control)
Date Submitted Date Verified
DOCUMENT NO:
CIV/QCP/PER001 (Rev0)
EXCAVATION RELEASE Page: 7/17
Erbacon Construction (Pty) Ltd Date:
PROJECT: 0 JOB NO: 0
CLIENT: 0 CONTRACT NO: 0
REQUEST TO Date: SECTION :
EXCAVATE : Time: DRAWING NO :
Checked Contractor Inspection
Description Details
Erbacon Client Signature Date
Excavation Type (1) Bulk Excavation
(2) Structural Excavation
(3) Pipeline Trenching
(4) Bases
(5) Other
Location Of Services (1) Water
(2) Electricity
(3) Sewerage
(4) Stormwater
(5) Communication
(6) Gas
(7) Other
Expected Material (1) Soft
(2) Intermediate
(3) Hard Rock
Excavation Depths (1) Average NGL
(2) Underside of Excavation
(3) Depth of Excavation
Shoring (1) Shoring Required?
(2) Type
(3) Designed By
(4) Inspected By
Setting Out (1) SOP Located
(2) Centre Line Pegs
(3) Level Controls
(4) Setting Out Done By
(5) Checked By
Water Table (1) Expected Depth
(2) De-watering Required?
Safety (1) Access Ladders
(2) Dangerous Gasses
(3) Batter Backs
Excavation Sketch
Approval
Inspected By Approved By
0 Harry Offenberg
QC Manager (Safety Officer)
Date Inspected Date Approved
DOCUMENT NO:
CIV/QCP/PBR001 (Rev0)
BACKFILL RELEASE Page: 8/17
Erbacon Construction (Pty) Ltd Date:
PROJECT: 0 JOB NO: 0
CLIENT: 0 CONTRACT NO: 0
REQUEST TO Date: SECTION :
BACKFILL: Time: DRAWING NO :
Checked Contractor Inspection
Description Details
Erbacon Client Signature Date
Pre Backfilling (1) Post Concrete Inspection
(2) Joint Sealing
(3) Shoring / Batter Backs
(4) Cleanliness
Backfill Material (1) Type Of Backfill
(2) Source
(3) Estimated Quantity
Compaction (1) % Required % MOD AASHTO
(2) Number Of Layers
(2) Layer Thickness
(3) Method / Plant
Test Results (1) Compaction Achieved % MOD AASHTO
(2) Material Mod
(3) Wet Density
(4) Dry Density
Information Required (1) Ground Levels
(2) Spot Levels
(3) Dimensions
Backfill Area Sketch
Approval
Inspected By Approved By
0 0
QC Manager (Project Quality Control)
Date Inspected Date Approved
DOCUMENT NO:
CIV/QCP/OWL001 (Rev0)
OUTSTANDING WORK LIST Page: 9/17
Erbacon Construction (Pty) Ltd Date:
PROJECT: 0 JOB NO: 0
CLIENT: 0 CONTRACT NO: 0
SECTION
Completion
Item Activity Contractor Signature
Date
Verification
Inspected By Verified By
0 0
QC Manager (Project Quality Control)
Date Inspected Date Approved
DOCUMENT NO:
FINAL HANDOVER CIV/QCP/HOC001 (Rev0)
CERTIFICATE DATE OF
OUTSTANDING WORKS
NUMBER CERTIFICATE
The above listed work has been inspected and found to be acceptable for final hand over
with outstanding work or snag lists
0
Handed Over
Name
Signature Date
QA Manager
0
Approved By
Name
Signature Date
(Project Quality Control)
Richard Dewey
Accepted By
Name
Signature Date
(Contractor Representative)
DOCUMENT NO:
BENEFICIAL HANDOVER CIV/QCP/BHC 002 (Rev)
The work described above has been completed in accordance with the drawings and specifications
and conforms to all the requirements specified in the contract.
0
Handed Over By
Name
Signature Date
QC Manager
The above section of work has been inspected and found to be acceptable for handover, subject to
the completion of the items listed below or on the attached Outstanding Work List.
Lenny Naidoo
Accepted By
Name
Signature Date
(Contractor Representative)
Contractor Client
Item Number Outstanding works Completion Date
Signature Signature
DRAWING REGISTER
DOCUMENT NO:
ISSUE NO:_______
CIV/QCP/DR001 (Rev0)
Page 12/17
CLIENT: 0 DATE: 9/4/2023
CONTRACT: 0 CONTRACT NO: 0
LOCATION: 0 LAST RECEIVING DATE: 12/30/1899
Revision / Number of copies (NC)
Drawing Number Description
0 NC 1 NC 2 NC 3 NC 4
Page 15/17
DOCUMENT NO:
CIV/QCP/DR001 (Rev0)
9/4/2023
0
12/30/1899
Revision / Number of copies (NC)
NC
Page 15/17
DOCUMENT NO:
CIV/QCP/GRR001 (Rev0)
GROUT RELEASE REGISTER Page: 13/17
Erbacon Construction (Pty) Ltd Date:
PROJECT: 0 JOB NO: 0
CLIENT: 0 CONTRACT NO: 0
SECTION
Verification
Registered By Verified By
0 0
QC Manager (Project Quality Control)
Date Inspected Date Approved
DOCUMENT NO:
CIV/QCP/GRC001 (Rev0)
GROUT RELEASE & RECORD Page: 14/17
Erbacon Construction (Pty) Ltd Date:
PROJECT: JOB NO: 40376/2
CLIENT: CONTRACT NO: 40376/2
REQUEST TO Date: SECTION :
PLACE GROUT: Time: DRAWING NO :
Checked Contractor Inspection
Description Details
Erbacon Client Signature Date
Approval
Inspected By Approved By
0 Ravi Moodley
QC Manager (Project Quality Control)
Date Inspected Date Approved
CIV/QCP/DTN/000(Rev000)
Page 15/17
TO:____________________________________
ATTENTION: ____________________________
Date: Date:
CIV/QCP/FHC000/(Rev000)
Beneficial H/over Oustanding Works DATA PACK Grout Realese Final Handover
REF STRUCTURE Area Submitted Sign. Date Complete Submitted Received Complete Submitted
Final Handover
Sign.
CIV/DCP/DPC000(Rev00)
Page 17/17
Erbacon Construction (Pty) Ltd
CONTENTS: