Firestopping Standard Details Guide 14mb
Firestopping Standard Details Guide 14mb
Firestopping Standard Details Guide 14mb
Interested?
Fire Stopping For further information on
▪ Structural protection
▪ Penetration seals
▪ Joints
▪ Cavity barriers
▪ Building services protection
(V9/AUG21) 2
Contents
Page FIREPRO® product Application area Orientation of use Drawing no.
9 50mm Ablative Batt Multiple service penetrations Vertical SD-112-RDW
10 2 x 50mm Ablative Batt Multiple service penetrations Vertical SD-122-RDW
11 50mm Ablative Batt (Face Fix) Multiple service penetrations Vertical SD-113-RDW
12 2 x 50mm Ablative Batt Multiple service penetrations (service spacing) Vertical SD-250-RDW
13 2 x 50mm Ablative Batt Multiple service penetrations (single sided install) Vertical SD-145-RDW
14 2 x 50mm Ablative Batt Timber penetrations Vertical SD-310-RW
15 60mm Ablative Batt Multiple service penetrations Vertical SD-106-RDW
16 2 x 60mm Ablative Batt Multiple service penetrations Vertical SD-107-RDW
17 60mm Ablative Batt (Face Fix) Multiple service penetrations Vertical SD-111-RDW
18 Soft Seal Multiple service penetrations Vertical SD-149-RDW
19 Soft Seal Multiple service penetrations Vertical SD-150-RDW
20 Soft Seal Service penetrations - plastic pipes Vertical SD-161-RDW
21 2 x 50mm Ablative Batt Multiple service penetrations Horizontal SD-123-RDW
22 60mm Ablative Batt Multiple service penetrations Horizontal SD-124-RDW
23 FireStop Compound Multiple service penetrations Horizontal SD-132-RDW
24 FireStop Compound Service penetrations - metal pipes Horizontal RWSD-COM-0503
25 FireStop Compound Service penetrations - metal pipes Horizontal RWSD-COM-0510
26 H&V Pipe Section Service penetrations - metal pipes Vertical SD-260-RW
27 H&V Pipe Section Service penetrations - metal pipes Vertical SD-140-RDW
28 H&V Pipe Section Service penetrations - metal pipes Vertical SD-141-RDW
29 Pipe Collar CE Service penetration - plastic pipes Vertical RWSD-COL-0001
30 Pipe Collar CE Service penetration - plastic pipes through batt Vertical RWSD-COL-0002
31 Pipe Collar CE Service penetration - plastic pipes Vertical RWSD-COL-0003
32 Pipe Collar CE Service penetration - plastic pipes Horizontal RWSD-COL-0501
33 Pipe Collar CE Service penetration - plastic pipes Horizontal RWSD-COL-0502
34 Acoustic Intumescent Sealant Service penetrations - metal pipes & cables Vertical SD-128-RDW
35 Acoustic Intumescent Sealant Service penetrations - cables Vertical SD-127-RW
36 Acoustic Intumescent Sealant Service Penetrations - Metal sleeves & cables Vertical RWSD-AIS-0101
37 Acoustic Intumescent Sealant Service penetrations - metal pipes Vertical SD-311-RDW
38 Pipe Wrap CE Service penetrations - plastic pipes Vertical RWSD-PW-0001
39 Pipe Wrap CE Service penetrations - plastic pipes Horizontal RWSD-PW-0501
40 Wrap on a roll (Double) Service penetrations - plastic pipes Horizontal SD-181-RDW
41 Wrap on a roll Service penetrations - plastic pipes flexible wall Vertical SD-185-RDW
42 Wrap on a roll Service penetrations - plastic pipes face fix batt Vertical SD-188-RDW
43 Wrap on a roll Service penetrations - insulated pipes face fix batt Vertical SD-190-RDW
44 Wrap on a roll Service penetrations - insulated pipes batt seal Vertical SD-191-RDW
45 Wrap on a roll Service penetrations - plastic pipes Vertical SD-192-RDW
(V9/AUG21) 3
Contents
Page FIREPRO® product Application area Orientation of use Drawing no.
46 High Expansion Intumescent Sealant Service penetrations - plastic pipes flexible wall Vertical SD-170-RDW
47 High Expansion Intumescent Sealant Service penetrations - plastic pipes flexible wall Vertical SD-171-RDW
48 High Expansion Intumescent Sealant Service penetrations - plastic conduits & cables (single skin flexible walls) Vertical RWSD-HE-0110
49 High Expansion Intumescent Sealant Service penetrations - plastic conduits partial penetrations & plastic pipe Vertical RWSD-HE-0111
50 High Expansion Intumescent Sealant Service penetrations - plastic pipes Horizontal SD-172-RDW
51 High Expansion Intumescent Sealant Service penetrations - cables Horizontal SD-174-RDW
52 High Expansion Intumescent Sealant Service penetrations - plastic pipes through batt Vertical SD-175-RDW
53 High Expansion Intumescent Sealant Service penetrations - plastic pipes through batt Vertical SD-176-RDW
54 High Expansion Intumescent Sealant Service penetrations - plastic pipes through batt Horizontal SD-177-RDW
55 High Expansion Intumescent Sealant Service penetrations - plastic pipes (cpvc) Vertical SD-179-RDW
56 High Expansion Intumescent Sealant Service penetrations - plastic pipes (cpvc) Vertical RWSD-HE-0051
57 Oval Insulated Fire Sleeve Service penetrations - plastic ductwork Vertical SD-220-RDW
58 Insulated Fire Sleeve Service penetrations - plastic pipes through batt Vertical RWSD-IFS-0001
59 Insulated Fire Sleeve Service penetration (single sided install) Vertical RWSD-IFS-0002
60 Insulated Fire Sleeve Service penetration - angled plastic pipes through softseal Vertical RWSD-IFS-0003
61 Insulated Fire Sleeve Service penetrations - plastic pipes Vertical RWSD-IFS-0101
62 Insulated Fire Sleeve Service penetrations - plastic pipes through batt Horizontal RWSD-IFS-0501
63 Insulated Fire Sleeve Service penetrations - plastic pipes Horizontal RWSD-IFS-0601
64 Oval Insulated Fire Sleeve Service penetrations - plastic pipes through softseal Vertical RWSD-IFS-1003
65 EZ path in Ablative Batt Service penetrations - cable management system Vertical SD-200-RDW
66 EZ path with cover plate in Ablative Batt Service penetrations - cable management system Vertical SD-201-RDW
67 EZ path in FireStop Compound Service penetrations - cable management system Horizontal SD-202-RDW
68 50mm Ablative Batt Head of wall Vertical SD-126-RDW
69 60mm Ablative Batt Head of wall Vertical SD-125-RDW
70 Linear & Trapezoidal Fire Stops Head of wall Vertical SD-134-RDW
71 Acoustic Intumescent Sealant Linear joint seal Vertical & Horizontal RWSD-AIS-0001
72 Soft Seal Linear joint seal Vertical & Horizontal SD-160-RDW
73 SP Slab Linear joint seal Vertical & Horizontal SD-230-RDW
74 SP Slab Linear joint seal (penetrations) Horizontal SD-235-RW
75 SP Plus Linear joint seal (service penetrations) Horizontal SD-236-RW
(V9/AUG21) 4
ROCKWOOL®
Fire Stopping Guide
1. ROCKWOOL will not support mixing fire protection of differing manufacturers systems/products of any type in line
with ASFP recommendations, unless proven by fire testing.
2. ROCKWOOL products should be installed in accordance with the relevant product data sheet and within the field
of application identified on the standard details. For applications that fall outside of the parameters identified in
the standard details or data sheets please contact ROCKWOOL for further guidance.
3. Engineering judgements are an appraisal of the likely performance of the installed ROCKWOOL products in
that application when subjected to a fire resistance test. It is offered in lieu of direct formal testing and is based
upon ROCKWOOL’s experiences of product performance during fire resistance testing. For this reason, before
installation, engineering judgements used on-site should be reviewed and accepted by Building Control and/or
the scheme Fire Officer or the overseeing body for the project.
4. All penetrations within the dry lining system shall be framed and lined. As a reflection of the fire test standard, all
partitions are based upon 2 No. 12.5 mm thick plasterboards to each side of the stud. For solutions to partitions
of a different make up including; fewer boards, thinner boards or different finish materials, please contact
ROCKWOOL for further guidance. A pattress fit option with ROCKWOOL Batts is available, but please check for its
suitability.
5. Design of the penetration and its fire stopping should consider and correspond to the integrity and insulation
requirements of the host wall or floor, unless leniency on the insulation rating is provided by the fire officer or
overseeing body via a derogation.
6. Services of different types can pass through the same penetration, with the exception of ventilation (ducts and
dampers) which should pass exclusively through its own penetration, as per the EN test guidance.
7. Support for services passing through walls should be within 500mm on each side. Services passing through floors
should be supported at each level, as per industry and ASFP guidance.
8. With reference to penetration spacings, please refer to the ROCKWOOL Spacing Guidelines Document.
9. Under the CPR it is a requirement that fire dampers are CE marked and as such that they are installed (and fire
stopped) in line with the relevant damper manufacturer’s installation guides. Damper manufacturers can now
provide a tested fire stopping solution for sealing around their damper systems. Therefore, ROCKWOOL’s default
position is to guide the Client and/or Installer to contact the relevant damper manufacturer for its tested and
certified fire stopping solution.
(V9/AUG21) 5
ROCKWOOL® Penetration spacing guidelines
The information below is a direct reflection of our supporting test data, however we can review spacings and performance on a case by case basis, subject to fire ratings, differing
substrates and available testing, please contact ROCKWOOL for further support - Call: 01656 868490 or email: [email protected]
Cable trays & ladders through double 50/60mm batt wall seals - Minimum separation
Fire rating (minutes)
Service Aperture size Aperture edge separation Service separation E (integrity) I (insulation)
Ladders ≤350mm wide 1200mm x 600mm 0mm 120 90
Trays ≤500mm wide 1200mm x 600mm 0mm 120 60
Cables ≤80mm 1200mm x 600mm 0mm 50mm between trays / 120 *Variable
Bunches 100mm Dia. 1200mm x 600mm 0mm 0mm between ladders 120 90
Metal Conduits ≤16mm 1200mm x 600mm 0mm 120 60
Plastic Conduits ≤16mm 1200mm x 600mm 0mm 120 120
*Please contact ROCKWOOL Technical with cable size and type
Non-combustible pipes with Rocklap H&V lagging through double 50/60mm batt wall seals - Minimum separation
Insulated fire sleeve through double layer ablative batt wall seals
(V9/AUG21) 6
Wrap on a roll in double layer ablative batt wall seals
Cable trays & ladders through single 50/60mm batt wall seals - Minimum separation
Fire rating (minutes)
Service Aperture size Aperture edge separation Service separation E (integrity) I (insulation)
Ladders ≤350mm wide 1200mm x 600mm 0mm 110mm 120 90
Trays ≤500mm wide 1200mm x 600mm 0mm 75mm 120 60
Cables ≤80mm 1200mm x 600mm 0mm 110mm 120 *Variable
Bunches 100mm Dia. 1200mm x 600mm 0mm 75mm 120 90
Metal Conduits ≤16mm 1200mm x 600mm 0mm 110mm 120 60
Plastic Conduits ≤16mm 1200mm x 600mm 0mm 75mm 120 120
*Please contact ROCKWOOL Technical with cable size and type
(V9/AUG21) 7
High expansion sealant in double 50mm ablative batt wall seals
Spacings
Wall Pipe diameter Pipe type Annular Seal depth Backer E (integrity) I (insulation) Aperture Services
100mm Drywall 40-63mm PVC & HDPE 20mm 25mm (each face) PE Rod 120 120 30mm 30mm
(V9/AUG21) 8
ROCKWOOL Standard Detail:
INSTALLATION NOTES Supporting Evidence : CF5868 / WF335645
Drywall substrate
1. Make sure that the area within the aperture is clean of The supporting construction must be capable of achieving the
40mm ROCKWOOL FireTube, or,
any debris and remove any dust from the edges. Rocklap H&V Pipe Section installed
required fire rating of the proposed Firestop.
500mm either side of the seal
Flexible wall construction must be installed in accordance with the
2. Cut Rockwool ablative coated batt to the size and shape
manufacturer's guidelines with the aperture being fully framed and
required to fit the aperture ensuring the batt will make a lined out. The Wall construction should be of a minimum thickness of
tight fit with all edges of the aperture. Insulated non-combustible pipe 100mm.
3. Setout the service penetrations and cut the coated batt All service items should be adequately supported either side of the
Firestop to ensure that no load is transferred onto the coated batt.
at the mid point of each service to enable the batt to be
15mm bead ROCKWOOL
fitted into the aperture. For specific installation details not cover by this detail (such as
Acoustic Intumescent Sealant
Damper installation) then please consult the relevant Standard detail
4. Apply Rockwool acoustic intumescent sealant to all Non-combustible pipe or the Rockwool Fire stopping Technical manual.
edges of the batt, ensuring that an even cover is achieved
All ROCKWOOL to ROCKWOOL joints of locally interrupted pipe
over the entire thickness of the batt. This should include the
lagging of Fire Tube to be filled with FirePro Glue prior to application.
outer edges of the batt and the edges of the cut made 50mm ROCKWOOL
All joints to be held firmly together with temporary bands at 200mm
through the batt to allow fitting into the aperture. There is no Ablative Coated Batt
centres until adhesive within joints has fully cured.
requirement to apply sealant to the edges of the holes cut ≤ Ø100mm bunched cables
to accommodate each service penetration. Locally continuous pipe lagging of ROCKWOOL Fire Tube or
ROCKLAP H&V pipe section does not require glue and/or temporary
≤ Ø80mm single sheathed cables restraint bands or clips.
6. Insert the batt into the aperture. ≤ Ø16 PVC or non-combustible conduits
Refer to SD-140/141-RW for ROCKLAP H&V Pipe Section
7. Apply a bead of Rockwool acoustic intumescent sealant, ≤ 480mm (w) x 25mm (d) cable tray, or application.
approximately 15 mm wide, around the perimeter of the ≤ 340mm (w) x 80mm (d) cable ladder
batt ensuring that all gaps between the batt and Refer to SD-221-RW for Insulated Fire Sleeve applications.
surrounding edges are fully filled. ROCKWOOL Insulated Fire Sleeve
Refer to relevant product data sheets for further insulation guidelines.
8. Apply a bead of Rockwool acoustic intumescent sealant, These products should only be utilised for applications as outlined in
approximately 15 mm wide, where the service penetrations Plastic pipe (HDPE, PVC, PP & ABS) the relevant ROCKWOOL product data sheet and in accordance with
pass through the batt. Ensure that the sealant fully the relevant ROCKWOOL Fire Resistance Testing. Additionally the
product must be installed in accordance with the current
encloses each cable within the tray or ladder and that all
40 min. ROCKWOOL guidelines. For further information please visit
gaps are fully filled. www.rockwool.co.uk or contact our Technical Solutions Team on
01656 868490.
9. Repeat step 7 and 8 on the other side of the batt
Solid wall substrate
Integrity Performance: Insulation Performance:
(V9/AUG21) 9
ROCKWOOL Standard Detail:
INSTALLATION NOTES Supporting Evidence: CF5868 / WF335645
100mm min. drywall substrate
1. Make sure that the area within the aperture is clean of The supporting construction must be capable of achieving the
40mm ROCKWOOL FireTube, or,
any debris and remove any dust from the edges. Rocklap H&V Pipe Sectioninstalled
required fire rating of the proposed Firestop.
500mm either side of the seal
Flexible wall construction must be installed in accordance with the
2. Cut Rockwool ablative coated batt to the size and shape
manufacturer's guidelines with the aperture being fully framed and
required to fit the aperture ensuring the batt will make a lined out. The Wall construction should be of a minimum thickness of
tight fit with all edges of the aperture. Insulated non-combustible pipe 100mm.
3. Setout the service penetrations and cut the coated batt All service items should be adequately supported either side of the
Firestop to ensure that no load is transferred onto the coated batt.
at the mid point of each service to enable the batt to be
15mm bead ROCKWOOL
fitted into the aperture. Acoustic Intumescent Sealant For specific installation details not cover by this detail (such as
Damper installation) then please consult the relevant Standard detail
4. Apply Rockwool acoustic intumescent sealant to all Non-combustible pipe or the Rockwool Fire stopping Technical manual.
edges of the batt, ensuring that an even cover is achieved
All ROCKWOOL to ROCKWOOL joints of locally interrupted pipe
over the entire thickness of the batt. This should include the
2no. 50mm ROCKWOOL
lagging of Fire Tube to be filled with FirePro Glue prior to application.
outer edges of the batt and the edges of the cut made All joints to be held firmly together with temporary bands at 200mm
Ablative Coated Batt
through the batt to allow fitting into the aperture. There is no centres until adhesive within joints has fully cured.
requirement to apply sealant to the edges of the holes cut ≤ Ø61mm single or bunched
to accommodate each service penetration. sheathed cables Locally continuous pipe lagging of ROCKWOOL Fire Tube or
ROCKLAP H&V pipe section does not require glue and/or temporary
restraint bands or clips.
6. Insert the batt into the aperture.
Refer to SD-140/141-RDW for ROCKLAP H&V Pipe Section
7. Apply a bead of Rockwool acoustic intumescent sealant, ≤ 450mm (w) x 25mm (d) cable tray, or application.
approximately 15mm wide, around the perimeter of the batt ≤ 340mm (w) x 80mm (d) cable ladder
ensuring that all gaps between the batt and surrounding Refer to SD-221-RDW for Insulated Fire Sleeve applications.
edges are fully filled. ROCKWOOL Insulated Fire Sleeve
Refer to relevant product data sheets for further insulation guidelines.
8. Apply a bead of Rockwool acoustic intumescent sealant, These products should only be utilised for applications as outlined in
approximately 15mm wide, where the service penetrations Plastic pipe (HDPE, PVC, PP & ABS) the relevant ROCKWOOL product data sheet and in accordance with
pass through the batt. Ensure that the sealant fully the relevant ROCKWOOL Fire Resistance Testing. Additionally the
product must be installed in accordance with the current
encloses each cable within the tray or ladder and that all 25 min. ROCKWOOL guidelines. For further information please visit
gaps are fully filled. www.rockwool.co.uk or contact our Technical Solutions Team on
01656 868490.
9. Repeat step 7 and 8 on the other side of the batt
Solid wall substrate
Integrity Performance: Insulation Performance:
(V9/AUG21) 10
ROCKWOOL Standard Detail:
Supporting Evidence: CF5868 / WF 335645
Uninsulated non-combustible pipe For applications where a 4 sided fix is not possible or if the 100mm
overlap onto partition is not possible contact ROCKWOOL.
75mm drywall screws All service items should be adequately supported either side of the
75mm drywall screws with 25mm with 25mm washer at
washers at 300mm max. centres. Firestop to ensure that no load is transferred onto the coated batt.
300mm centres
1200 max.
Cable trays and ladders < 500mm wrapped with RWA45 insulation
≤ 500mm (w) x 25mm (d) cable tray achieve EI120 rating - refer to table for cable size parameters.
For specific installation details not cover by this detail please consult
15mm bead of
the relevant Standard detail or the Rockwool Fire stopping Technical
ROCKWOOL Acoustic
manual.
Intumescent Sealant
PVC or HDPE pipe with 25mm
annular spacing sealed with These products should only be utilised for applications as outlined in
100 min. overlap ROCKWOOL High Expansion the relevant ROCKWOOL product data sheet and in accordance with
Sealant to 40mm depth
the relevant ROCKWOOL Fire Resistance Testing. Additionally the
FIXING DETAIL THROUGH FLEXIBLE WALL product must be installed in accordance with the current
≤ Ø 15mm PVC conduit sealed with
ROCKWOOL Acoustic Intumescent ROCKWOOL guidelines. For further information please visit
Sealant www.rockwool.co.uk or contact our Technical Solutions Team on
1200 max. 01656 868490.
Acoustic Performance:
Up to 53 dB
Integrity Performance: Insulation Performance:
(V9/AUG21) 11
ROCKWOOL Standard Detail:
Supporting Evidence : WF 385718
Non combustible pipes with Rocklpa H&V lagging through double 50/60mm batt - Minimum separation Cable trays & ladders through double 50/60mm batt - Minimum Separation
H&V Aperture Edge Service Fire Rating Integrity
Aperture Edge Service Fire Rating (minutes)
Pipe Type Pipe Dia. (mm) Aperture Size Service Separation Service Aperture Size Performance: Insulation Performance:
Insulation Separation Configuration E I Separation Separation E (Integrity) I (Insulation)
Copper 40 - 108 Ladders ≤350mm wide Up to 120 Minutes Up to 120 Minutes 90
25 90 90
Steel 40 - 168 Trays ≤500mm wide 60
0mm Cluster & Linear 50mm between
Copper 40 - 108 1200 x 1200 0mm Cables ≤80mm 1200mm x *Variable
40 120 120 0mm trays / 0mm 120
Steel 40 - 168 Bunches 100mm Dia. 600mm 90
between ladders
Steel 40 - 220 100mm Metal Conduits ≤16mm 60
25 Single 120 120
Copper & steel 40 - 108 1200 x 600 50mm 10mm Plastic Conduits ≤16mm 120
*Please contact ROCKWOOL Technical with cable size and type
Pencoed, Bridgend,
South Wales CF35 6NY
Cable trays & ladders through double 50/60mm batt - Minimum Separation t: 01656 868490
ing
Service Aperture Size
Aperture Edge Service Fire Rating (minutes) [email protected]
I Separation Separation E (Integrity) I (Insulation)
Ladders ≤350mm wide 90
90 Drawing Title:
Trays ≤500mm wide 60
50mm between Double batt seal with lagged metal pipes
Cables ≤80mm 1200mm x *Variable
120 0mm trays / 0mm 120 Minimum Seperation Detail
Bunches 100mm Dia. 600mm 90
between ladders
Metal Conduits ≤16mm 60
120
Plastic Conduits ≤16mm 120
Scale: Date:
*Please contact ROCKWOOL Technical with cable size and type NTS May 18
(V9/AUG21) 12
ROCKWOOL Standard Detail:
INSTALLATION NOTES Supporting Evidence : WF385718/WF385719/WF 407899
1. Make sure that the area within the aperture is clean of Not Accessible Accessible
This detail is to be read in conjunction with the
any debris and remove any dust from the edges.
2no. layers 50mm ROCKWOOL ROCKWOOL Ablative Coated Batt data sheet specific
2. Cut ROCKWOOL Ablative Coated Batt to the size and Ablative Coated Batt installation instructions.
the shape required to fit the aperture, ensuring the batt
will make a tight fit with all edges of the opening. Metal based services lagged with H&V pipe section can be
ROCKWOOL Acoustic Intumescent installed with 0mm separation between services and 0mm
3. Cut rectangular holes from the coated batt to Sealant aperture edge separation. 0mm separation for metal based
accommodate the cable tray or ladder containing services lagged with H&V pipe section only - please
cable, or, circular holes from the coated batt for pipes. contact ROCKWOOL technical for combustible pipe
Copper or steel service pipe up to separation.
4. Cut the coated batt across its width at the mid-point of Ø 108mm supported within 500mm of
each hole to enable batt to be fitted into the aperture. each side of seal For single sided fire seal installations with combustible
25mm ROCKWOOL H&V pipe penetrations please contact ROCKWOOL Technical
5. Apply Rockwool Acoustic Intumescent Sealant to all
Pipe Section installed as a continuous Solutions.
edges of the batt, ensuring that an even cover is Single sheathed cables ≤ Ø 80mm
achieved over the entire thickness of the batt. This
1000mm length through seal
PVC or non-combustible conduits ≤ Ø These products should only be utilised for applications as
should include the outer edges of the batt and the 16mm
edges of the cut made across the batt to allow fitting outlined in the relevant ROCKWOOL product data sheet
into the aperture. There is no requirement to apply and in accordance with the relevant ROCKWOOL Fire
sealant to the edges of the holes cut to accommodate Cable tray up to 500mm x 60mm Resistance Testing. Additionally the product must be
each cable tray or ladder. Cable ladder up to 350mm x 100mm ROCKWOOL Acoustic Intumescent installed in accordance with the current ROCKWOOL
Sealant applied to all abutments to guidelines. For further information please visit
6. Insert the first layer of batt into the aperture. substrate, joints in batt and perimeter www.rockwool.co.uk or contact our Technical Solutions
of aperture Team on 01656 868490.
7. Apply a bead of ROCKWOOL Acoustic Intumescent
Sealant, approximately 15mm wide, around the
perimeter of the batt ensuring that all gaps Fire rated flexible wall / plasterboard
between the batt and surrounding edges are fully partition
sealed.
100mm min.
8. Apply a bead of Rockwool Acoustic Intumescent
Sealant, approximately 15mm wide, where the
penetrations pass through the batt. Ensure that the
sealant fully encloses each service penetration and
that all gaps are fully filled.
9. Apply Rockwool Acoustic Intumescent Sealant to all Integrity Performance: Insulation Performance:
edges of the second layer of batt, ensuring that an
even cover is achieved over the entire thickness of the 30 Minutes 60 Minutes 90 Minutes 120 Minutes Up to 90 Minutes Up to 90 Minutes
Service type
batt. This should include the outer edges of the batt Integrity Insulation Integrity Insulation Integrity Insulation Integrity Insulation
and the edges of the cut made across the batt to allow Maximum aperture size m² (90 Min Insulation Performance) 0.72m² 0.72m² 0.72m² 0.72m²
fitting into the aperture. Solid and perforated cable trays ≤500 x 60mm ü ü ü ü ü ü
Cable Ladder ≤350 x 100mm ü ü ü ü ü ü
0-15mm sheathed cables ü ü ü ü ü ü ü
10. Insert the second layer of batt into the aperture and
16-21mm sheathed cables ü ü ü ü ü ü ü
repeat step 7 and 8. 22-50mm sheathed cables ü ü ü ü ü ü ü
51-80mm sheathed cables ü ü ü ü ü Pencoed, Bridgend,
Bunched cables ≤100 mm
Non combustable conduits ≤16mm
ü
ü
ü ü
ü
ü ü
ü
ü ü
ü
South Wales CF35 6NY
PVC conduits ≤16mm ü ü ü ü ü ü t: 01656 868490
Copper pipes 15mm lagged with 20mm H&V
Steel pipes ≤ 60mmlagged with 20mm H&V
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
[email protected]
Copper pipes 42mm - 108mm lagged with 25mm H&V ü ü ü ü ü
Steel pipes 42mm - 168mm lagged with 25mm H&V ü ü ü ü ü ü
Copper pipes 42mm - 108mm lagged with 40mm H&V Drawing Title:
ü ü ü ü ü ü ü
Steel pipes 42mm - 168mm lagged with 40mm H&V ü ü ü ü ü ü ü ü Single sided installation of Ablative Coated Batt
Steel pipes ≤ 219mm unlagged ü ü ü ü
Copper pipes ≤ 159mm unlagged ü ü ü ü with service penetrations
Cable trays and ladders 0mm distance from aperture opening
Metal pipes lagged with H&V pipe section can be fitted with 0mm seperation between services and 0mm to substrate
For combustible pipes, please contact ROCKWOOL Technical Department Scale: Date:
NTS JUN 19
(V9/AUG21) 13
ROCKWOOL Standard Detail:
INSTALLATION NOTES Supporting Evidence : WF 380565 (BS EN 1366-3)
1. Cut the Ablative Coated Batt so that it tightly This detail is to be read in conjunction with the relevant
accommodates the timber penetration. ROCKWOOL product data sheet.
2. Apply ROCKWOOL Acoustic Intumescent For head of wall applications with timber penetrations
Sealant liberally around all edges, of the Ablative please contact ROCKWOOL technical.
Coated Batt, before offering the batt up to the
timber section. These products should only be utilised for applications as
outlined in the relevant ROCKWOOL product data sheet
3. If the batt needs to be jointed with another batt, Concrete/masonry wall
and in accordance with the relevant ROCKWOOL Fire
follow a stretcher bond arrangement to stagger Resistance Testing. Additionally the product must be
the joints and apply Acoustic Intumescent installed in accordance with the current ROCKWOOL
Sealant to all meeting edges, including guidelines. For further information please visit
Timber lintel
batt-to-batt and batt-to-substrate edges, following www.rockwool.co.uk or contact our Technical Solutions
the Ablative Coated Batt standard install details. 35mm x 100mm timber joist Team on 01656 868490.
65mm x 245mm timber joist
4. Repeat the process on the opposite side of the 35mm x 245mm timber joist
void to create a double layer of Ablative Coated
Batt, ensuring that the joints are staggered.
65mm x 100mm timber joist
2no. layers 50mm Ablative
Coated Batt
100
Timber lintel
Pencoed, Bridgend,
Timber joist
ROCKWOOL Acoustic Intumescent Sealant
South Wales CF35 6NY
t: 01656 868490
[email protected]
Drawing Title:
Scale: Date:
NTS 18.01.18
(V9/AUG21) 14
ROCKWOOL Standard Detail:
INSTALLATION NOTES
Supporting Evidence : CF5868 / WF335645
1. Make sure that the area within the aperture is clean of any Drywall substrate The supporting construction must be capable of achieving the
debris and remove any dust from the edges. required fire rating of the proposed Firestop.
40mm ROCKWOOL FireTube, or,
2. Cut Rockwool ablative coated batt to the size and shape Rocklap H&V Pipe Section installed Flexible wall construction must be installed in accordance with the
500mm either side of the seal manufacturer's guidelines with the aperture being fully framed and
required to fit the aperture ensuring the batt will make a tight fit
lined out. The Wall construction should be of a minimum thickness of
with all edges of the aperture. 100mm.
Insulated non-combustible pipe
3. Setout the service penetrations and cut the coated batt at the All service items should be adequately supported either side of the
mid point of each service to enable the batt to be fitted into the Firestop to ensure that no load is transferred onto the coated batt.
aperture.
For specific installation details not cover by this detail (such as
15mm bead ROCKWOOL Damper installation) then please consult the relevant Standard detail
4. Apply Rockwool acoustic intumescent sealant to all edges of Acoustic Intumescent Sealant or the Rockwool Fire stopping Technical manual.
the batt, ensuring that an even cover is achieved over the
Non-combustible pipe All ROCKWOOL to ROCKWOOL joints of locally interrupted pipe
entire thickness of the batt. This should include the outer edges
of the batt and the edges of the cut made through the batt to lagging of Fire Tube to be filled with FirePro Glue prior to application.
All joints to be held firmly together with temporary bands at 200mm
allow fitting into the aperture. There is no requirement to apply 60mm ROCKWOOL centres until adhesive within joints has fully cured.
sealant to the edges of the holes cut to accommodate each Ablative Coated Batt
service penetration. For seals over 1200mm x 1200mm batt to batt joints are to be fully
≤ Ø61mm single or bunched coated with FirePro Glue in place of sealant.
sheathed cables
6. Insert the batt into the aperture.
Locally continuous pipe lagging of ROCKWOOL Fire Tube or
ROCKLAP H&V pipe section does not require glue and/or temporary
7. Apply a bead of Rockwool acoustic intumescent sealant, restraint bands or clips.
approximately 15mm wide, around the perimeter of the batt ≤ 480mm (w) x 25mm (d) cable tray, or
ensuring that all gaps between the batt and surrounding edges ≤ 340mm (w) x 80mm (d) cable ladder Refer to SD-140/141-RDW for ROCKLAP H&V Pipe Section
are fully filled. application.
ROCKWOOL Insulated Fire Sleeve Refer to SD-221-RDW for Insulated Fire Sleeve applications.
8. Apply a bead of Rockwool acoustic intumescent sealant,
approximately 15mm wide, where the service penetrations pass These products should only be utilised for applications as outlined in
through the batt. Ensure that the sealant fully encloses each Plastic pipe (HDPE, PVC, PP & ABS) the relevant ROCKWOOL product data sheet and in accordance with
cable within the tray or ladder and that all gaps are fully filled. the relevant ROCKWOOL Fire Resistance Testing. Additionally the
product must be installed in accordance with the current
ROCKWOOL guidelines. For further information please visit
9. Repeat step 7 and 8 on the other side of the batt 40 min.
www.rockwool.co.uk or contact our Technical Solutions Team on
01656 868490.
(V9/AUG21) 15
ROCKWOOL Standard Detail:
INSTALLATION NOTES
120mm min. drywall substrate Supporting Evidence : CF5868 / CHILT A08152-E
1. Make sure that the area within the aperture is clean of The supporting construction must be capable of achieving the
any debris and remove any dust from the edges. 40mm ROCKWOOL FireTube, or,
required fire rating of the proposed Firestop.
Rocklap H&V Pipe Sectioninstalled
500mm either side of the seal
2. Cut Rockwool ablative coated batt to the size and shape Flexible wall construction must be installed in accordance with the
required to fit the aperture ensuring the batt will make a manufacturer's guidelines with the aperture being fully framed and
lined out. The Wall construction should be of a minimum thickness of
tight fit with all edges of the aperture. Insulated non-combustible pipe 120mm.
3. Setout the service penetrations and cut the coated batt All service items should be adequately supported either side of the
at the mid point of each service to enable the batt to be Firestop to ensure that no load is transferred onto the coated batt.
fitted into the aperture. 15mm bead ROCKWOOL
Acoustic Intumescent Sealant For specific installation details not cover by this detail (such as
Damper installation) then please consult the relevant Standard detail
4. Apply Rockwool acoustic intumescent sealant to all Non-combustible pipe or the Rockwool Fire stopping Technical manual.
edges of the batt, ensuring that an even cover is achieved
over the entire thickness of the batt. This should include the All ROCKWOOL to ROCKWOOL joints of locally interrupted pipe
outer edges of the batt and the edges of the cut made 2no. 60mm ROCKWOOL lagging of Fire Tube to be filled with FirePro Glue prior to application.
Ablative Coated Batt All joints to be held firmly together with temporary bands at 200mm
through the batt to allow fitting into the aperture. There is no
centres until adhesive within joints has fully cured.
requirement to apply sealant to the edges of the holes cut ≤ Ø61mm single or bunched
to accommodate each service penetration. sheathed cables For seals over 1200mm x 1200mm batt to batt joints are to be fully
coated with FirePro Glue in place of sealant.
6. Insert the batt into the aperture.
Locally continuous pipe lagging of ROCKWOOL Fire Tube or
ROCKLAP H&V pipe section does not require glue and/or temporary
7. Apply a bead of Rockwool acoustic intumescent sealant, ≤ 450mm (w) x 25mm (d) cable tray, or restraint bands or clips.
approximately 15mm wide, around the perimeter of the batt ≤ 340mm (w) x 80mm (d) cable ladder
ensuring that all gaps between the batt and surrounding Refer to SD-140/141-RDW for ROCKLAP H&V Pipe Section
edges are fully filled. ROCKWOOL Insulated Fire Sleeve application.
(V9/AUG21) 16
ROCKWOOL Standard Detail:
Supporting Evidence : CF5868 / CHILT A08152-E
Combustible pipe protected with The 60 mm Rockwool Ablative Coated Batt must be installed with
ROCKWOOL Intumescent Pipe ROCKWOOL intumescent sealant bedded between the batt and the
Sleeve drywall. A fillet of sealant must be installed at the junction between
Intumescent Pipe Sleeve to project the batt and the drywall to ensure no gaps are visible between the
25mm min. from the seal drywall and the batt. The exposed mineral wool edges should be
Insulated non-combustible pipe 60mm ROCKWOOL buttered with a layer of sealant or ablative coating. All batt to batt
Ablative Coated Batt joints are to receive acoustic intumescent sealant.
Uninsulated non-combustible pipe For applications where a 4 sided fix is not possible or in the 100mm
overlap onto partition is not possible contact ROCKWOOL.
85mm drywall screws All service items should be adequately supported either side of the
85mm drywall screws with 25mm with 25mm washer at Firestop to ensure that no load is transferred onto the coated batt.
washers at 300mm max. centres. 300mm centres
1200 max. For specific installation details not cover by this detail please consult
the relevant Standard detail or the Rockwool Fire stopping Technical
≤ 500mm (w) x 25mm (d) cable tray manual.
15mm bead of
These products should only be utilised for applications as outlined in
ROCKWOOL Acoustic
the relevant ROCKWOOL product data sheet and in accordance with
Intumescent Sealant
the relevant ROCKWOOL Fire Resistance Testing. Additionally the
product must be installed in accordance with the current
PVC or HDPE pipe with 25mm ROCKWOOL guidelines. For further information please visit
annular spacing sealed with www.rockwool.co.uk or contact our Technical Solutions Team on
ROCKWOOL High Expansion FIXING DETAIL THROUGH FLEXIBLE WALL 01656 868490.
100 min. overlap
Sealant to 40mm depth
Up to 53 dB
Integrity Performance: Insulation Performance:
30 Minutes 60 Minutes 90 Minutes 120 Minutes
Service type
Integrity Insulation Integrity Insulation Integrity Insulation Integrity Insulation Up to 120 Minutes Up to 120 Minutes
Max aperture size 1000mm x 1000mm (Min 100mm wall) ü ü ü ü ü ü ü ü
bunched cables ≤100 mm ü ü ü ü ü₴ ü₴ ü₴ ü₴
0-15mm sheathed cables ü ü ü ü ü₴ ü₴ ü₴ ü₴
16-21mm sheathed cables ü ü ü ü ü₴ ü₴ ü₴ ü₴
22-50mm sheathed cables ü ü ü ü ü₴ ü₴ ü₴ ü₴
51-80mm sheathed cables ü ü ü ü ü₴ ü₴ ü₴ ü₴
PVC Conduits ≤ 15 mm (with Acoustic Intumescent Sealant) ü ü ü ü ü₴ ü₴ ü₴ ü₴ Pencoed, Bridgend,
PVC & HDPE pipes ≤ 110 mm (with High pressure sealant)* ü ü ü ü ü ü ü ü South Wales CF35 6NY
Steel pipes ≤168 mm lagged with Fire Tube or H&V pipe section ü ü ü ü ü ü ü ü
Steel pipes ≤168 mm ü ü ü ü
t: 01656 868490
Copper pipes ≤ 108 mm lagged with Fire Tube or H&V Pipe section ü ü ü ü ü ü ü ü [email protected]
Copper pipes ≤ 108 mm ü ü ü ü
PVC pipes ≤ 160 mm with Fire Sleeve ü ü ü ü ü ü ü ü Drawing Title:
HDPE pipes ≤ 110mm with Fire Sleeve ü ü ü ü ü ü ü ü
HDPE pipes ≤ 160mm with Fire Sleeve ü ü ü ü 60mm Ablative Coated Batt
PB ≤ 28mm with Fire Sleeve ü ü ü ü ü ü ü ü Face Fix application Range
ABS pipes ≤ 164 mm with Fire Sleeve ü ü
* Requires Min 25mm annular space around the pipe with minimum sealant depth of 40mm in each batt
₴ Cables insulated with ROCKWOOL RWA45 insulation 40mm thick 300mm either side of seal - insulation secured with at least 2 no. 0.8mm steel bands to each side of seal Scale: Date:
NTS NOV 18
(V9/AUG21) 17
ROCKWOOL Standard Detail:
100 min.
Supporting Evidence : WF 352441
(V9/AUG21) 18
ROCKWOOL Standard Detail:
Supporting Evidence : WF 352441
≤ Ø160mm steel or copper pipe ≤ Ø160mm steel or copper pipe RWA45 Insulation secured to penetrations with 2 No. 5mm
ROCKWOOL SoftSeal Intumescent ROCKWOOL SoftSeal Intumescent
Sealant applied to joints of SoftSeal Sealant applied to joints of SoftSeal
wide steel tie wraps wither side of seal.
(V9/AUG21) 19
INSTALLATION NOTES ROCKWOOL Standard Detail:
Double 50mm Ablative Batt to perimeter for apertures > 1000 x 1000mm
ROCKWOOL SoftSeal - 100mm thick
installed under compression
installed under compression www.rockwool.co.uk or contact our Technical Solutions
25 Team on 01656 868490
ROCKWOOL SoftSeal Acoustic Intumescent 20
25 between soft seal joints
1000 x 1000mm max. aperture size for stand alone seal
ROCKWOOL SOFTSEAL USED AS STAND ALONE SEAL ROCKWOOL SOFTSEAL USED WITH DOUBLE 50mm
(APERTURE NO GREATER THAN 1000 X 1000mm) ABLATIVE COATED BATT TO PERIMETER Scale: Date:
uPVC Pipe Penetrations (APERTURE GREATER THAN 1000 X 1000mm) NTS March 19
uPVC Pipe Penetrations
Sheet Size: Drawn By: Checked By:
A3 RW TECH L.HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-161-RDW C
(V9/AUG21) 20
ROCKWOOL Standard Detail:
INSTALLATION NOTES
Supporting Evidence : CF5868 / WF335645
1. Make sure that the area within the aperture is clean The supporting construction must be capable of achieving the
of any debris and remove any dust from the edges. required fire rating of the proposed Firestop.
2. Cut Rockwool ablative coated batt to the size and ROCKWOOL FirePro Glue to The Floor construction should be of a minimum thickness of 150mm.
batt-to-batt joints and For thinner substrates please contact ROCKWOOL Technical
shape required to fit the aperture ensuring the batt will batt-to-substrate Solutions.
make a tight fit with all edges of the aperture.
≤ Ø80mm single sheathed cables All service items should be adequately supported either side of the
3. Setout the service penetrations and cut the coated ≤ Ø16mm PVC or non-combustible conduit Firestop to ensure that no load is transferred onto the coated batt.
batt at the mid point of each service to enable the batt Insulated non-combustible pipe
For specific installation details not cover by this detail (such as
to be fitted into the aperture.
Damper installation) then please consult the relevant Standard detail
or the Rockwool Fire stopping Technical manual.
4. Apply Rockwool FirePro Glue to all edges of the batt, ROCKWOOL Fire Tube
ensuring that an even cover is achieved over the entire 15mm bead ROCKWOOL 500mm min. either side of seal These products should only be utilised for applications as outlined in
Acoustic Intumescent Sealant the relevant ROCKWOOL product data sheet and in accordance with
thickness of the batt. This should include the outer
edges of the batt and the edges of the cut made across the relevant ROCKWOOL Fire Resistance Testing. Additionally the
product must be installed in accordance with the current
the batt to allow fitting into the aperture. There is no ROCKWOOL guidelines. For further information please visit
requirement to apply FirePro Glue to the edges of the www.rockwool.co.uk or contact our Technical Solutions Team on
holes cut to accommodate each cable tray or ladder. 01656 868490.
(V9/AUG21) 21
ROCKWOOL Standard Detail:
Supporting Evidence : Chilt A08152/E
INSTALLATION NOTES
The supporting construction must be capable of achieving the
1. Make sure that the area within the aperture is clean of required fire rating of the proposed Firestop.
any debris and remove any dust from the edges. The Floor construction should be of a minimum thickness of 150mm.
ROCKWOOL FirePro Glue to For thinner substrates please contact ROCKWOOL Technical
2. Cut Rockwool ablative coated batt to the size and batt-to-batt joints and Solutions.
shape required to fit the aperture ensuring the batt will batt-to-substrate
make a tight fit with all edges of the aperture. All service items should be adequately supported either side of the
≤ Ø60mm bunched cables Firestop to ensure that no load is transferred onto the coated batt.
3. Setout the service penetrations and cut the coated batt ≤ Ø23mm sheathed cables
Insulated non-combustible pipe For specific installation details not cover by this detail (such as
at the mid point of each service to enable the batt to be Damper installation) then please consult the relevant Standard detail
fitted into the aperture. or the Rockwool Fire stopping Technical manual.
6. Apply a bead of Rockwool acoustic intumescent ≤ 450mm (w) x 25mm (d) cable tray
sealant, approximately 15mm wide, around the perimeter
of the batt ensuring that all gaps between the batt and
surrounding edges are fully filled.
Scale: Date:
1:10 AUG 18
(V9/AUG21) 22
INSTALLATION NOTES ROCKWOOL Standard Detail:
A permanent shuttering made from 50mm ROCKWOOL slab Uninsulated Metallic Pipe Supporting Evidence : BMTFEIF14015
(minimum density 140kg/m3) is cut and friction fitted
between services and the edges of the floor slab. Firestop ≤160mm PVC, uPVC, PP, MDPE The supporting construction must be capable of achieving
Compound is then trowelled over the shutter to a depth of & HDPE Pipe the required fire rating of the proposed Firestop.
25mm thick. This is allowed to cure. Further Firestop
Cable tray 500mm x 50mm
Compound is then mixed to a pouring grade and tops the All service items should be adequately supported either
seal up to the required depth. side of the Firestop to ensure that no permanent load is
Floor openings transferred onto the coated batt.
Min 500mm
that once the required depth of Compound is installed it
finishes flush with the floor slab/screed unless otherwise Combustible pipes passing through the compound shall be
specified provided with either ROCKWOOL Firestop Collar or Wrap.
It is important to ensure that the collar or wrap shall remain
3) Mix and pour compound until the required thickness is
exposed at the soffit (therefore to direct fire exposure). If
achieved.
the shuttering batt is to remain in place then care shall be
Reinforcement taken to ensure the intumescent device remains exposed.
One option to achieve this would be to use a PE backing
Min. 150mm
Reinforcing of the compound requires either 12mm diameter
bars or 40mm (high) x 60mm steel angle fixed across the
rod between the pipe and the batt to ensure the shuttering
short span of the aperture. The bars should be installed at
allows the compound to be poured yet burns away quickly
200mm centres across the aperture and may be installed to expose the intumescent. A width of 15mm is suggested.
such that they are recessed into the surrounding structure by
minimum 50mm on both sides or supported on an steel 15 These products should only be utilised for applications as
angle securely fixed to the structure. Rockwool FirePro outlined in the relevant ROCKWOOL product data sheet
Rockwool Firestop Pipe Wrap and in accordance with the relevant ROCKWOOL Fire
Steel angle reinforcement shall be installed at 250mm Resistance Testing. Additionally the product must be
Compound
centres and shall be bolted back to supporting angle, which
NOTE: installed in accordance with the current ROCKWOOL
is fixed back to the structure. The support angle for rod or
for single Pipe Wrap CE guidelines. For further information please visit
angle reinforcement shall be 50mm x 50mm x 1.6mm and
applications contact ROCKWOOL www.rockwool.co.uk or contact our Technical Solutions
shall be securely fixed back to the structure with nominally
Technical Solutions Team on 01656 868490.
8mm steel anchor bolts at a maximum of 200mm centres. Rockwool 50mm
In all instances the reinforcement shall be positioned Shuttering Batt
approximately 30mm above the bottom surface of the
compound to ensure adequate fire protection from below.
Integrity Performance: Insulation Performance:
(V9/AUG21) 23
ROCKWOOL Standard Detail:
Ø159 Ø219 Supporting Evidence : WF 427399 (BS EN 1366-3)
80
The supporting construction must be capable of achieving
40 Pipes testing in cluster the required fire rating of the proposed fire stop.
formation with 0mm edge
separation & 0mm pipe Please refer to SD-132-RW for compound size limitations
Steel pipe up to 219mm Dia separation between lagging and other service penetration details.
Copper pipe up to 159mm Dia
All service items should be adequately supported either
500mm of 40mm thick side of the Firestop.
40mm thick ROCKWOOL H&V ROCKWOOL H&V pipe
500 pipe section to extend 500mm lagging to top of slab only
above floor slab The tested cluster formation provides coverage for a linear
Floor slab Min. 150mm arrangement.
thick 40
80 These products should only be utilised for applications as
outlined in the relevant ROCKWOOL product data sheet
Ø42 80 and in accordance with the relevant ROCKWOOL Fire
Resistance Testing. Additionally the product must be
ROCKWOOL Standard or installed in accordance with the current ROCKWOOL
HS Compound guidelines. For further information please visit
Min. 100mm thick www.rockwool.co.uk or contact our Technical Solutions
Team on 01656 868490.
Edge of seal
ROCKWOOL Standard or ROCKWOOL Ablative
HS Compound coated batt as shuttering
Min. 100mm thick
Drawing Title:
Scale: Date:
N/A APR 20
(V9/AUG21) 24
ROCKWOOL Standard Detail:
ROCKWOOL Standard 8
Compound with ROCKWOOL Supporting Evidence : WF 427399 (BS EN 1366-3)
50mm shuttering batt 8mm annular sealed with Min
20 20mm depth Acoustic The supporting construction must be capable of achieving
Intumescent Sealant the required fire rating of the proposed fire stop.
Non combustible sleeve
RWA45 backing as Please refer to SD-132-RW for compound size limitations
SECTION THROUGH LAGGED depth control SECTION THROUGH UN-LAGGED
PIPE WITH SLEEVE PIPE WITH SLEEVE and other service penetration details.
150 150
100mm RWA45
ROCKWOOL Standard backing
Compound with ROCKWOOL Pencoed, Bridgend,
50mm shuttering batt
South Wales CF35 6NY
Performance Table:
t: 01656 868490
[email protected]
Penetration Type/Size Service Substrate Supporting Performance
Formation Insulation Thickness (mm) Seal
(mm) Separation Separation construction Integrity Insulation Drawing Title:
40mm H&V pipe section -
0mm 0mm 150mm thick AAC ROCKWOOL Standard Compound
Steel < 219 Single 1000mm length through the 100mm thick ROCKWOOL 120 120
(Between (Between concrete slab (650 Sleeved Pipe Penetrations
seal (L/S) Standard Compound
sleeves) sleeves) kg/m³)
Steel < 219 Single N/A 120 15
Scale: Date:
N/A APR 20
(V9/AUG21) 25
ROCKWOOL Standard Detail:
Supporting Evidence : WF 410975
Flexible wall Flexible wall
Fire resistant to at least the fire rating Fire resistant to at least the fire rating The supporting construction must be capable of achieving
requirement of the service penetration requirement of the service penetration
the required fire rating of the proposed firestop.
ROCKWOOL RWA45
backer with Acoustic Acoustic Intumescent Flexible wall construction must be installed in accordance
Intumescent Sealant Sealant with the manufacturers guidelines. The wall thickness shall
The annular gap should be sealed with
The RWA45 backer should be full depth ≤ 10 Acoustic Intumescent Sealant through be a minimum of 100mm,
of the wall, allowing for 12.5mm deep
≤ 50 Acoustic Intumescent Sealant to both the full depth of the wall
sides of the wall
All services should be adequately supported both sides of
the firestop to ensure the no load is transferred to the wall.
ROCKLAP H&V PIPE SECTION THROUGH DRYWALL WITH ROCKLAP H&V PIPE SECTION THROUGH DRYWALL WITH
ANNULAR SPACE UP TO 50mm ANNULAR SPACE LESS THAN 11mm
Acoustic Intumescent
Sealant
≤ 50 5mm bead to interface of H&V pipe
section and drywall
≤ 50 ≤ 50
(V9/AUG21) 26
(V9/AUG21) 27
(V9/AUG21) 28
ROCKWOOL Standard Detail:
Supporting Evidence : CF 5738
ROCKWOOL FIREPRO® Pipe Refer to relevant product datasheet for further installation
guidelines.
Collar CE
• Ø32 - 160mm pipes
• PE, PVC, and PP pipes These products should only be utilised for applications as
• Fixed with Ø8mm x 65mm long Fischer FM 6x65S steel anchors outlined in the relevant ROCKWOOL product data sheet
through each fixing tab.
• Pipe Collar CE must match the outside diameter of the pipe (e.g. and in accordance with the relevant ROCKWOOL Fire
Ø110mm Pipe Collar CE can only be used with Ø110mm pipes) Resistance Testing. Additionally the product must be
• Annular gaps ≤10mm between substrate and pipe to be sealed with
min. 10mm depth of ROCKWOOL FIREPRO® Acoustic Intumescent
installed in accordance with the current ROCKWOOL
Sealant guidelines.
• Annular gaps >10mm between substrate and pipe to be sealed with
ROCKWOOL Firestop Compound
For further information please visit www.rockwool.co.uk or
contact our Technical Solutions Team on 01656 868490.
(V9/AUG21) 29
ROCKWOOL Standard Detail:
Supporting Evidence : CF 5578
(V9/AUG21) 30
ROCKWOOL Standard Detail:
Supporting Evidence : CF 5578
(V9/AUG21) 31
ROCKWOOL Standard Detail:
Supporting Evidence : CF 5738
Rigid floor
Test Service separation
Service type (min. 150mm thick)
Standard
Integrity Insulation Aperture Services
PVC pipes Ø 32 - 50mm (1.8mm wall thickness)
Ø 55 - 63mm (2.3 - 3mm wall thickness) Integrity Performance: Insulation Performance:
Ø 75 - 82mm (3.1 - 4.8mm wall thickness)
Ø 90 - 110mm (4.2 - 7.4mm wall thickness) 240 240 EN N/A 200mm 240 mins 240 mins
Ø 125mm (6mm wall thickness)
Ø 140mm (6.1 - 7.5mm wall thickness)
Ø 160mm (6.2 - 9.5mm wall thickness)
PP pipes Ø 32 - 50mm (2.9mm wall thickness)
Ø 55 - 63mm (2.9- 4.4mm wall thickness)
Ø 75 - 82mm (2.8- 6.7mm wall thickness) Pencoed, Bridgend,
Ø 90 - 110mm (2.7 - 10mm wall thickness) 240 240 EN N/A 200mm
South Wales CF35 6NY
Ø 125mm (3.1mm wall thickness)
Ø 140mm (3.5 - 8mm wall thickness) t: 01656 868490
Ø 160mm (4 - 14.6mm wall thickness) [email protected]
PE pipes Ø 32 - 50mm (2.9mm wall thickness)
Ø 55 - 63mm (2.9- 4.4mm wall thickness) Drawing Title:
Ø 75 - 82mm (2.8- 6.7mm wall thickness)
240 240 EN N/A 200mm PIPE COLLAR CE
Ø 90 - 110mm (2.7 - 10mm wall thickness)
Ø 125mm (3.1mm wall thickness) Solid Floor
Ø 140mm (3.9 - 5.8mm wall thickness)
Ø 160mm (4.9 - 9.5mm wall thickness)
Scale: Date:
NTS SEP 20
(V9/AUG21) 32
ROCKWOOL Standard Detail:
Supporting Evidence : WF 428682
≤25 >25
• Fixed with min. 52mm long pig tail screws through each fixing tab. • Edges of the batt to be buttered with Acoustic Intumescent Sealant
• Pipe Collar CE must match the outside diameter of the pipe (e.g. • All batt-to-batt and batt-to-substrate joints to be sealed with Acoustic
Ø110mm Pipe Collar CE can only be used with Ø110mm pipes) Intumescent Sealant
Rigid floor
Test Service separation
Service type (min. 150mm thick)
Standard Integrity Performance: Insulation Performance:
Integrity Insulation Aperture Services
PVC pipes Ø 32 - 50mm (1.8mm wall thickness)
120 mins 120 mins
Ø 55 - 63mm (2.3 - 3mm wall thickness)
Ø 75 - 82mm (3.1 - 4.8mm wall thickness)
Ø 90 - 110mm (4.2 - 7.4mm wall thickness) 120 120 EN N/A 200mm
Ø 125mm (6mm wall thickness)
Ø 140mm (6.1 - 7.5mm wall thickness)
Ø 160mm (6.2 - 9.5mm wall thickness)
HDPE pipes Ø 32 - 50mm (2.9mm wall thickness) Pencoed, Bridgend,
Ø 55 - 63mm (2.9- 4.4mm wall thickness) South Wales CF35 6NY
Ø 75 - 82mm (2.8- 6.7mm wall thickness)
Ø 90 - 110mm (2.7 - 10mm wall thickness) 120 120 EN N/A 200mm
t: 01656 868490
Ø 125mm (3.1mm wall thickness) [email protected]
Ø 140mm (3.9 - 5.8mm wall thickness)
Ø 160mm (4.9 - 9.5mm wall thickness) Drawing Title:
PP pipes Ø 32 - 50mm (2.9mm wall thickness)
PIPE COLLAR CE
Ø 55 - 63mm (2.9- 4.4mm wall thickness)
Ø 75 - 82mm (2.8- 6.7mm wall thickness) Metal Deck Floor
Ø 90 - 110mm (2.7 - 10mm wall thickness) 120 120 EN N/A 200mm
Ø 125mm (3.1mm wall thickness)
Scale: Date:
Ø 140mm (3.5 - 8mm wall thickness) NTS SEP 20
Ø 160mm (4 - 14.6mm wall thickness)
Sheet Size: Drawn By: Checked By:
A3 S. HIRONS L. HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. RWSD-COL-0502 B
(V9/AUG21) 33
ROCKWOOL Standard Detail:
INSTALLATION NOTES
Supporting Evidence : ETA 15-0326
1. Make sure that the area within the aperture is
The supporting construction must be capable of achieving
clean of any debris and remove any dust from
the required fire rating of the proposed Firestop.
the edges.
Flexible wall construction must be installed in accordance
2. Ensure that the surface is free from any bond Blockwork wall Fire rated drywall with the manufacturer's guidelines. The Wall construction
breaking contaminants prior to application of
should be of a minimum thickness of 120mm.
sealant.
Ø 159mm max. Ø 159mm max. Where insulation is required from metallic pipes then the
3. Install the backing material around the service 25 min. 10 max. 25 min. 10 max.
non-combustible pipe non-combustible pipe service item will need to be lagged with Rockwool Fire
item to allow for the minimum allowable seal
Tube or RockLap H&V Pipe Section. Please contact
depth. The backing material can consist of either
ROCKWOOL technical for further details.
ROCKWOOL RWA45 / RW4 packed around the
service or a PE backing rod.
Backing material to control depth of sealant can be either a
ROCKWOOL Acoustic ROCKWOOL Acoustic PE backing rod or ROCKWOOL RW 4 insulation packed
4. Install the Rockwool Acoustic Intumescent Intumescent Sealant Intumescent Sealant into the annular space.
Sealant to the required depth ensuring a smooth
tight finish with both the service item and the
These products should only be utilised for applications as
substrate. PE backing rod, or, ROCKWOOL
RWA45 insulation outlined in the relevant ROCKWOOL product data sheet
and in accordance with the relevant ROCKWOOL Fire
5. Repeat step 3 and 4 on the other side of the
Resistance Testing. Additionally the product must be
wall. 120 min. installed in accordance with the current ROCKWOOL
guidelines.
Up to 120 Minutes
ROCKWOOL RW4 backing
Integrity Performance: (Cables) Insulation Performance: (Cables)
490 450mm (w) x 25mm (h) cable
tray with 21mm max. 120 Minutes 90 Minutes
450mm (w) x 25mm (h) cable cables (21-50mm Cables 90 Minutes) (21-50mm Cables 60 Minutes)
tray with 21mm max.
cables 100
Drawing Title:
Scale: Date:
NTS NOV 18
(V9/AUG21) 34
ROCKWOOL Standard Detail:
Supporting Evidence : WF 378958
Drawing Title:
Scale: Date:
NTS MAY 19
(V9/AUG21) 35
ROCKWOOL Standard Detail:
Supporting Evidence : WF 411460 (BS EN 1366-3:2009)
125 • Fire rated to at least the same fire rating as the firestop seal • Fire rated to at least the same fire rating as the firestop seal
12.5 12.5 Applications in flexible wall constructions can be used in
masonry wall constructions.
ELEVATION - 42mm Dia. COPPER SLEEVE ELEVATION - 76mm Dia. COPPER SLEEVE
THROUGH 75mm FLEXIBLE WALL THROUGH 75mm FLEXIBLE WALL
EI 60 EI 60/30
Pencoed, Bridgend,
South Wales CF35 6NY
t: 01656 868490
[email protected]
Drawing Title:
Scale: Date:
NTS NOV 20
(V9/AUG21) 36
ROCKWOOL Standard Detail:
Supporting Evidence : WF 398664 (BS EN 1366-3)
Masonry wall Masonry wall Spacing: There can be 0mm distance from sleeving to
aperture edge.
15mm depth of Acoustic Intumescent Sealant 15mm depth of Acoustic Intumescent Sealant
to both sides of seal to both sides of seal
15 14-47 annular
ROCKWOOL RWA45 backing ROCKWOOL RWA45 backing
100 100
Min 15mm depth of acoustic RWA45 backing between 120 Minutes Up to 15 Minutes
intumescent sealant to pipe sleeve and pipe to full
annular gap up to 47mm depth of seal
Scale: Date:
NTS APR 19
(V9/AUG21) 37
ROCKWOOL Standard Detail:
Supporting Evidence : CF 5891 / ETA 20-0682
Drawing Title:
PIPE WRAP CE
Direct Through Wall
Scale: Date:
NTS OCT 20
(V9/AUG21) 38
ROCKWOOL Standard Detail:
Supporting Evidence : CF 5891 / ETA 20-0682
Pencoed, Bridgend,
Rigid floor
Service separation
Intumescent Thickness South Wales CF35 6NY
Test
Service type (min. 150mm thick)
Standard
Pipe Diameter Intumescent Material t: 01656 868490
Integrity Insulation Aperture Services Ø32 - 50mm 40mm (w) x 2mm (t)
PVC pipes Ø 32 - 50mm (1.8mm wall thickness) 120 Ø51 - 82mm 40mm (w) x 4mm (t)
[email protected]
120
Ø 200mm (7.7mm wall thickness) 90 EN N/A 200mm Ø83 - 115mm 40mm (w) x 6mm (t)
Ø 200mm (9.6mm wall thickness) 60 60 Ø116 - 160mm 40mm (w) x 8mm (t) Drawing Title:
PP pipes Ø 32 - 50mm (2.9mm wall thickness) 120 120 Ø161 - 200mm 40mm (w) x 10mm (t)
Ø 200mm (4.9mm wall thickness) 15 15 EN N/A 200mm PIPE WRAP CE
Ø 200mm (18.2mm wall thickness) 120 90 Solid Floor
HDPE pipes Ø 32 - 50mm (2.9mm wall thickness)
Ø 200mm (4.9mm wall thickness) 120 120 EN N/A 200mm
Ø 200mm (11.4mm wall thickness) Scale: Date:
NTS OCT 20
(V9/AUG21) 39
ROCKWOOL Standard Detail:
Supporting Evidence : WF352080/4 - CF5579
Annular space around pipe to suit total Annular space around pipe to suit total
thickness of Pipewrap Roll. Refer to table 1 thickness of Pipewrap Roll. Refer to table 1
for number of layers for number of layers
5 5 5 5
Pipewrap Roll installed to both sides of floor Pipewrap Roll installed to both sides of floor
with 5mm recess to finished face. Recess with 5mm recess to finished face. Recess
filled with ROCKWOOL Acoustic filled with ROCKWOOL Acoustic
Pencoed, Bridgend,
Intumescent Sealant Intumescent Sealant South Wales CF35 6NY
t: 01656 868490
[email protected]
(V9/AUG21) 40
ROCKWOOL Standard Detail:
Supporting Evidence : CF5579
Scale: Date:
NTS MARCH 18
(V9/AUG21) 41
ROCKWOOL Standard Detail:
Supporting Evidence : CF5579
Min. 100mm Wrap sealed with Nominal 5mm The supporting construction must be capable of achieving
bead of ROCKWOOL Acoustic the required fire rating of the proposed Firestop.
Intumescent Sealant
ROCKWOOL Acoustic Intumescent sealant bedded between
All service items should be adequately supported either
batt & drywall, applied to all exposed edges of batt and to
side of the seal.
perimeter of batt to substrate
100 100 5
This detail is to be read in conjunction with the
ROCKWOOL FIREPRO Intumescent Pipewrap Roll data
Face fix 50mm Ablative Coated Batt to each side sheet specific installation instructions. For pipe O/A
of partition as SD-113-RDW diameters and pipe wall thickness that fall outside of the
those indicated in Table 1 please consult ROCKWOOL
Acoustic Intumescent Sealant
PIPE PIPE Technical.
40
Refer to Table 1 for number or Pipewrap Roll layers.
Pipe penetration
This detail is to be read in conjunction with SD-111-RDW
Pipewrap Roll - for number of layers refer to Table 1 & SD-113-RDW - Face Fix Details.
(V9/AUG21) 42
Min. 100mm ROCKWOOL Standard Detail:
ROCKWOOL Acoustic Intumescent Supporting Evidence : CF5579
sealant bedded between batt & drywall,
INSTALLATION NOTES
applied to all exposed edges of batt The supporting construction must be capable of achieving
and to perimeter of batt to substrate
1) Check that pipe surface and substrate are clean and clear of any debris. the required fire rating of the proposed Firestop.
Ensure the correct number of layers of wrap as detailed in Table 1 or refer to data sheet. Apply wrap onto insulated pipe Face fix 50mm Ablative Coated All service items should be adequately supported either
penetration. Batt to each side of partition side of the seal.
2) The Ablative Coated Batt must be installed with ROCKWOOL Acoustic Intumescent Sealant bedded between the batt
and the substrate. A fillet of mastic must also be installed to the perimeter of the batt against the substrate. The exposed
edge of batt is to be buttered with a even layer of Acoustic Intumescent Sealant. Acoustic Intumescent Sealant This detail is to be read in conjunction with the
3) The Ablative Coated Batt must be fixed with 85mm long drywall screws and 25mm retention washer at max 300mm ROCKWOOL FIREPRO Intumescent Pipewrap Roll data
centres. The batt must overlap the formed opening in the partition by Min. 100mm. (Max. opening 1200mm x 1200mm) sheet specific installation instructions. For pipe O/A
4) Point the wrap with ROCKWOOL Acoustic Intumescent Sealant Insulated pipe penetration diameters, pipe wall thickness and insulation thickness
5) Maintain a record of the installation. that fall outside of the those indicated in Table 1 please
Pipewrap Roll - for number of consult ROCKWOOL Technical.
layers refer to Table 1
Refer to Table 1 for number or Pipewrap Roll layers.
Acoustic Intumescent Sealant
This detail is to be read in conjunction with SD-111-RDW
& SD-113-RDW - Face Fix Details.
Face fix 50mm Ablative Coated
Batt ROCKWOOL RockLap H&V pipe section can be used to
replace combustible insulation on metal pipes as it passes
through the seal.
Min. 60 minute rated partition
These products should only be utilised for applications as
outlined in the relevant ROCKWOOL product data sheet
and in accordance with the relevant ROCKWOOL Fire
Resistance Testing. Additionally the product must be
TABLE 1: installed in accordance with the current ROCKWOOL
guidelines.
Pipe Size / Wall / Insulation Classification
Pipe Material Wrap Layers
Pipe Size (mm) Wall Thickness (mm) Insulation Type / Size (mm) Integrity Insulation For further information or alternative products please visit
2 No. 40mm (w) x www.rockwool.co.uk or contact our Technical Solutions
Steel or Copper 42 - 159 1.2 - 14.2 13 - 25 Elastomeric 120 60
2mm (t) Team on 01656 868490
2 No. 40mm (w) x
Steel or Copper 42 - 159 1.2 - 14.2 25 Elastomeric 120 90
2mm (t)
2 No. 40mm (w) x Integrity Performance: Insulation Performance:
Steel or Copper 42 1 - 14.2 13 - 25 Elastomeric 120 120
2mm (t)
2 No. 40mm (w) x Up to 120 Minutes Up to 120 Minutes
Steel or Copper 42 - 108 1.2 - 14.2 25 - 40 Phenolic 120 90
2mm (t)
2 No. 40mm (w) x
Steel or Copper 42 1 - 14.2 25 - 40 Phenolic 120 120
2mm (t)
2 No. 40mm (w) x
Steel or Copper 42 1.2 - 14.2 50 (30kg/m³) Glassfibre 120 90
2mm (t)
25 (30kg/m³) Foil faced 2 No. 40mm (w) x
Steel or Copper 42 - 159 1.2 - 14.2 120 90
Glassfibre 2mm (t) Pencoed, Bridgend,
25 (30kg/m³) Foil faced 2 No. 40mm (w) x South Wales CF35 6NY
Steel or Copper 42 1.2 - 14.2 120 120
Glassfibre 2mm (t)
t: 01656 868490
[email protected]
Drawing Title:
Scale: Date:
NTS May 18
(V9/AUG21) 43
Min. 100mm ROCKWOOL Standard Detail:
Supporting Evidence : CF5579
(V9/AUG21) 44
ROCKWOOL Standard Detail:
Supporting Evidence : WF 405625 (BS EN 1366-3)
150 min.
The supporting construction must be capable of achieving
the required fire rating of the proposed Firestop.
PIPE PIPE
INSTALLATION NOTES
1) Check that pipe surface and substrate are clean and clear of any Pencoed, Bridgend,
debris. South Wales CF35 6NY
t: 01656 868490
2) Install the 2 No. layers of ablative batts in accordance with installation
email: [email protected]
guidelines.
3) Ensure the correct number of layers of wrap as detailed in Table 1 or
Drawing Title:
refer to data sheet.
Pipewrap Roll - Combustible Pipes
4) Install the wrap into the Ablative Coated batt recessed by 5mm from
Double batt aperture seal
the face of the wall.
5) Fill the annular space with Rockwool® FirePro® Acoustic Intumescent
Sealant to seal off the 5mm gap to the edge of the substrate. Scale:
NTS
Date:
Feb 19
6) Maintain a record of the installation.
Sheet Size: Drawn By: Checked By:
A3 S. HIRONS L.HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-192-RDW B
(V9/AUG21) 45
ROCKWOOL Standard Detail:
Supporting Evidence : ETA 15-0325
Scale: Date:
NTS 07.12.17
(V9/AUG21) 46
ROCKWOOL Standard Detail:
Supporting Evidence : ETA 15-0325
Min. 100mm Min. 100mm The supporting construction must be capable of achieving
the required fire rating of the proposed Firestop. Dry wall
Stud partition
25 Stud partition partitions should have a minimum of 2 layers of
20 25 FirePro High Expansion Intumescent Sealant - plasterboard on each face of the wall.
40mm o/a Dia. PVC pipe (Wall thickness 1.9mm) 20 Applied to both side of penetration
All service items should be adequately supported either
40mm o/a Dia. ABS pipe (Wall thickness 1.9mm) side of the seal.
25 FirePro High Expansion Intumescent Sealant -
20 Applied to both side of penetration The size and depth of sealant applied to the penetration
annular space must be within those identified in this detail
and product data sheet.
125mm o/a Dia. PVC pipe (Wall thickness 9.2mm)
40mm ABS PIPE - EI 120 These products should only be utilised for applications as
outlined in the relevant ROCKWOOL product data sheet
FirePro High Expansion Intumescent Sealant and in accordance with the relevant ROCKWOOL Fire
- Applied to both side of penetration
Resistance Testing. Additionally the product must be
installed in accordance with the current ROCKWOOL
40mm PVC PIPE - EI 120 guidelines.
125mm PVC PIPE - EI 60
For further information or alternative products please visit
Min. 100mm Min. 100mm www.rockwool.co.uk or contact our Technical Solutions
Team on 01656 868490
Stud partition Stud partition
25 FirePro High Expansion Intumescent Sealant - FirePro High Expansion Intumescent Sealant -
25
20 Applied to both side of penetration 20 Applied to both side of penetration
Min. 100mm
Stud partition
25
FirePro High Expansion Intumescent Sealant -
20 Applied to both side of penetration Pencoed, Bridgend,
South Wales CF35 6NY
40 - 159mm o/a Dia.Copper/Steel pipe t: 01656 868490
with 32mm Armaflex AF [email protected]
Drawing Title:
(V9/AUG21) 47
63mm Dia. PVC CONDUIT THROUGH 75mm 63mm Dia. PVC CONDUIT THROUGH 75mm ROCKWOOL Standard Detail:
FLEXIBLE WALL FLEXIBLE WALL Supporting Evidence : WF 411460 / WF 411469
EI 60 EI 60 (BS EN 1366-3:2009)
Flexible wall The supporting construction must be capable of achieving
• min. 75mm thick Flexible wall the required fire rating of the proposed firestop.
• min. 1no. board layers • min. 75mm thick
• Fire rated to at least the same fire rating as the firestop seal • min. 1no. board layers
• Fire rated to at least the same fire rating as the firestop seal
Flexible wall constructions must be installed in accordance
ROCKWOOL FIREPRO® High
12.5 Expansion Intumescent Sealant ROCKWOOL FIREPRO® High with the manufacturer's guidelines. The wall construction
20 • 20mm annular Expansion Intumescent Sealant
should be a minimum thickness of 75mm.
• min. 12.5mm depth • 20mm annular
• min. 12.5mm depth All service items should be adequately supported both
sides of the firestop to ensure that no load is transferred
onto the firestop seal.
Cable - Bundle Cable - Single Where possible a 20mm annular gap should be maintained
Note: • max. 8no. telecommunication cables
Note: • telecommunication cable
around the full circumference of the conduit.
Where conduit is tight to
opening point small gaps with PVC sleeve
Where conduit is tight to
opening point small gaps with
PVC sleeve
High Expansion Intumescent • max. Ø 63mm High Expansion Intumescent • max. Ø 63mm Applications in flexible wall constructions can be used in
Sealant Sealant • min. 125mm length
• min. 125mm length
• ROCKWOOL RWA45 packed around cables within sleeve masonry wall constructions.
• ROCKWOOL RWA45 packed around cables within sleeve
• min. 13mm deep ROCKWOOL FIREPRO® Acoustic Intumescent
75 • min. 13mm deep ROCKWOOL FIREPRO® Acoustic Intumescent
Sealant to seal within sleeve
Sealant to seal within sleeve Refer to relevant product datasheet for further installation
guidelines.
ROCKWOOL FIREPRO High ® ROCKWOOL FIREPRO® High
Expansion Intumescent Sealant Expansion Intumescent Sealant These products should only be utilised for applications as
20 • 20mm annular 20 • 20mm annular
• min. 12.5mm depth outlined in the relevant ROCKWOOL product data sheet
Ø83 • min. 12.5mm depth
Ø83 and in accordance with the relevant ROCKWOOL Fire
PVC sleeve PVC sleeve Resistance Testing. Additionally the product must be
• max. Ø 63mm
• max. Ø 63mm installed in accordance with the current ROCKWOOL
Note:
• min. 125mm length
Note: Ø63 • min. 125mm length
• ROCKWOOL RWA45 packed around cables within sleeve Ø63 • ROCKWOOL RWA45 packed around cables within sleeve guidelines.
Where conduit is tight to Where conduit is tight to • min. 13mm deep ROCKWOOL FIREPRO® Acoustic Intumescent
• min. 13mm deep ROCKWOOL FIREPRO® Acoustic Intumescent opening point small gaps with
opening point small gaps with Sealant to seal within sleeve
Sealant to seal within sleeve
High Expansion Intumescent High Expansion Intumescent For further information please visit www.rockwool.co.uk or
Sealant
Flexible wall
Sealant Flexible wall contact our Technical Solutions Team on 01656 868490.
• min. 75mm thick
ELEVATION - 63mm Dia. PVC CONDUIT
• min. 75mm thick
• min. 1no. board layers
ELEVATION - 63mm Dia. PVC CONDUIT • min. 1no. board layers
THROUGH 75mm FLEXIBLE WALL • Fire rated to at least the same fire rating as the firestop seal THROUGH 75mm FLEXIBLE WALL • Fire rated to at least the same fire rating as the firestop seal
EI 60 EI 60
Integrity Performance: Insulation Performance:
LINEAR ARRANGEMENT OF 63mm Dia. PVC LINEAR ARRANGEMENT OF 63mm Dia. PVC Scale: Date:
NTS NOV 20
CONDUITS THROUGH 75mm FLEXIBLE WALL CONDUITS THROUGH 75mm FLEXIBLE WALL
EI 60 EI 60 Sheet Size: Drawn By: Checked By:
A3 RW TECH L.HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. RWSD-HE-0110 B
(V9/AUG21) 48
63mm Dia. PVC SLEEVE PARTIAL PENETRATION 3 No. 34mm Dia. PVC SLEEVES PARTIAL PENETRATIONS ROCKWOOL Standard Detail:
75mm FLEXIBLE WALL 75mm FLEXIBLE WALL Supporting Evidence : WF 411469 (BS EN 1366-3:2009)
EI 90 EI 90/60
The supporting construction must be capable of achieving
the required fire rating of the proposed firestop.
Flexible wall Flexible wall
• min. 75mm thick • min. 75mm thick
• min. 1no. board layers • min. 1no. board layers Flexible wall constructions must be installed in accordance
• Fire rated to at least the same fire rating as the firestop seal • Fire rated to at least the same fire rating as the firestop seal with the manufacturer's guidelines. The wall construction
should be a minimum thickness of 75mm.
90 minutes Up to 90 minutes
Drawing Title:
Galvanized Spiral Duct cPVC Pipe Penetration ROCKWOOL FIREPRO® High Expansion Int. Sealant
• Max. 100mm diameter • 63mm diameter
75mm Flexible Wall - 1no. Board - Pipe & Partial Pens.
100mm Dia. GALV. SPIRAL DUCT THROUGH 63mm Dia. CPVC PIPE THROUGH Scale: Date:
75mm FLEXIBLE WALL 75mm FLEXIBLE WALL NTS NOV 20
E 90 (Integrity Only) EI 90 Sheet Size: Drawn By: Checked By:
A3 RW. TECH L.HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. RWSD-HE-0111 B
(V9/AUG21) 49
PP PIPES ROCKWOOL Standard Detail:
Supporting Evidence : ETA 15-0325
Min. 200 Separation
FirePro High Expansion between seals The supporting construction must be capable of achieving
Intumescent sealant to the required fire rating of the proposed Firestop.
25mm depth & 20mm
annular 20 20
25 25 All service items should be adequately supported either
side of the seal.
100 100 The size and depth of sealant applied to the penetration
annular space must be within those identified in this detail
and product data sheet.
FirePro High Expansion ROCKWOOL backing material The sealant is to be applied above and below the floor
Intumescent sealant to 100mm deep 45 kg/m3 slab.
25mm depth & 20mm
annular 110mm PP PIPE 50mm PP PIPE Contact ROCKWOOL technical for information on service
10.7mm WALL 2.1mm WALL
separations.
EI 120 EI 240
These products should only be utilised for applications as
PVC PIPES outlined in the relevant ROCKWOOL product data sheet
and in accordance with the relevant ROCKWOOL Fire
Resistance Testing. Additionally the product must be
Min. 200 Separation Min. 200 Separation installed in accordance with the current ROCKWOOL
FirePro High Expansion between seals between seals guidelines.
Intumescent sealant to
25mm depth & 20mm
annular 20 20 20 For further information or alternative products please visit
25 25 25 www.rockwool.co.uk or contact our Technical Solutions
Team on 01656 868490
PE PIPES
(V9/AUG21) 50
ROCKWOOL Standard Detail:
Supporting Evidence : ETA 15-0325
Min. 200 Separation For further information or alternative products please visit
FirePro High Expansion Intumescent between seals ROCKWOOL backing material 100mm deep
sealant to 25mm depth
www.rockwool.co.uk or contact our Technical Solutions
45 kg/m3
Team on 01656 868490
20
25 25 25 25 25
Drawing Title:
Scale: Date:
NTS May 18
(V9/AUG21) 51
ROCKWOOL Standard Detail:
Supporting Evidence : CF 5576
face of batt
Acoustic intumescent 30 Minutes 30 Minutes
sealant to cut edge of batt
300 Ablative Coating 300 Ablative Coating
50
20
47mm Dia. cables. Cables to receive
Ablative Coating 300mm from face of batt
Pencoed, Bridgend,
FirePro High Expansion South Wales CF35 6NY
Intumescent sealant to 20mm t: 01656 868490
annular gap & full depth of batt [email protected]
Drawing Title:
Scale: Date:
NTS 07.12.17
(V9/AUG21) 52
ROCKWOOL Standard Detail:
Supporting Evidence : CF 5576
Drawing Title:
Flexible wall - min 100mm thick
FirePro High Expansion Intumescent Sealant
Penetrations through double layer 50mm coated batt
Scale: Date:
NTS 07.12.17
(V9/AUG21) 53
ROCKWOOL Standard Detail:
Supporting Evidence : CF 5576
Pencoed, Bridgend,
South Wales CF35 6NY
t: 01656 868490
[email protected]
Drawing Title:
Scale: Date:
NTS 07.12.17
(V9/AUG21) 54
ROCKWOOL Standard Detail:
Supporting Evidence : Lubrizol P1753860 / ETA 15/0325
50mm o/a Dia. cPVC pipe (Wall thickness 2.4mm - 3.7mm) For single board drywall constructions contact
125mm o/a Dia. cPVC pipe (Wall thickness 4.8mm - 7.4mm) ROCKWOOL Technical.
100mm WALL THICKNESS FirePro High Expansion Intumescent Sealant - Drawing Title:
40mm cPVC PIPE - EI 120 Applied to both side of penetration
125mm cPVC PIPE - EI 60 High Expansion Intumescent Sealant
Batt Aperture Seal / Flexible or Masonry Wall
120mm WALL THICKNESS
40mm cPVC PIPE - EI 120
125mm cPVC PIPE - EI 120 Scale: Date:
NTS 23.04.18
(V9/AUG21) 55
1) SLEEVED CPVC PIPE - LARGE ANNULAR GAP 2) SLEEVED CPVC PIPE - SMALL ANNULAR GAP ROCKWOOL Standard Detail:
1) SECTION 2) SECTION Supporting Evidence : WF 411297
Flexible wall Flexible wall Refer to Lubrizol / SPEARS CPVC Piping Systems
• min. 100mm thickness • min. 100mm thickness Compatible Product Finder for further information/evidence
• min. 2no. layers of plasterboard • min. 2no. layers of plasterboard
of compatibility.
ROCKWOOL High Expansion Sealant The supporting construction must be capable of achieving
• 20mm annular gap with min 25mm depth both sides of seal ROCKWOOL High Expansion Sealant the required fire rating of the proposed firestop.
cPVC Pipe & Sleeve cPVC Pipe & Sleeve • 20mm annular gap with min 25mm depth both sides of seal
• Ø89mm 150mm long cPVC sleeve • Ø89mm 150mm long cPVC sleeve
• Ø27mm cPVC pipe
24 • Ø60mm cPVC pipe 8 Aperture Size: Max. 600mm wide x 400mm high.
20
ROCKWOOL High Expansion
cPVC Pipe & Sleeve 100 Sealant
• Ø89mm 150mm long cPVC sleeve
• 20mm Annular gap with 100mm depth "fully filled"
• Ø73mm cPVC pipe
(V9/AUG21) 56
ROCKWOOL Standard Detail:
Supporting Evidence : PAR 13814/03 & PAR 17244/01
Flexible or masonry wall Flexible or masonry wall These products should only be utilised for applications as
outlined in the relevant ROCKWOOL product data sheet
Note: For single batt seals the insulated
fire sleeve needs to project a minimum of and in accordance with the relevant ROCKWOOL Fire
40mm past the face of the coated batt on Resistance Testing. Additionally the product must be
each side of the seal Double 50mm Ablative Coated Batt installed in accordance with the current ROCKWOOL
25 25 guidelines.
Acoustic Intumescent Sealant Acoustic Intumescent Sealant
For further information or alternative products please visit
www.rockwool.co.uk or contact our Technical Solutions
PVC/PVCu duct PVC/PVCu duct
Team on 01656 868490
Oval Duct Insulated Fire Sleeve. cut Oval Duct Insulated Fire Sleeve
on site to suit width of wall and 25mm Cut on site to suit width of wall and
projection to each side of seal. 25mm project to each side of seal
Acoustic Intumescent
Sealant to perimeter of
seal
Oval Insulated Fire Sleeve Performance Tables: Integrity Performance: Insulation Performance:
Oval duct insulated fire sleeve through wall and floor Up to 240 Minutes Up to 120 Minutes
Wall Supporting Integrity Performance Insulation Performance
Vent Duct
Service Type Thickness Material Construction (Minutes) (Minutes)
Size (mm)
(mm) Wall Floor Wall & Floor Wall & Floor
110 x 54
Duct work 1.5 - 2.0 PVC M/PB Concrete 120 90 120
204 x 60
Pencoed, Bridgend,
Oval duct insulated fire sleeve through wall and floor South Wales CF35 6NY
Wall Supporting Integrity Performance Insulation Performance t: 01656 868490
Vent Duct
Service Type
Size (mm)
Thickness Material Construction (Minutes) (Minutes) [email protected]
(mm) Wall Floor Wall & Floor Wall & Floor
210 x 63 &
Duct work 1.6 - 3.0 PVC M/PB Concrete 120 90 120 Drawing Title:
308 x 66
FirePro Oval Insulated Fire Sleeve:
Trunking 100 x 100 3 PVC M/PB Concrete 120 90 120
Cable Conduit 55 Dia 3 PVC M/PB Concrete 120 90 120 Penetration Seal through batt & partition
M = Masonry Wall
PB = Plasterboard Wall Scale: Date:
NTS May 18
(V9/AUG21) 57
ROCKWOOL Standard Detail:
ROCKWOOL INSULATED FIRE SLEEVE IN ROCKWOOL INSULATED FIRE SLEEVE IN Supporting Evidence : WF 411464 / WF 411460 / WF
411468 (BS EN 1366-3:2009)
SINGLE BATT SEAL DOUBLE BATT SEAL
The supporting construction must be capable of achieving
Fire rated flexible wall / Fire rated flexible wall / the required fire rating of the proposed Firestop.
plasterboard partition plasterboard partition
All service items should be adequately supported either
side of seal - min 400mm from face of batt seal.
Min 75 Min100
Pencoed, Bridgend,
South Wales CF35 6NY
Insulated fie sleeve through double 50mm batt t: 01656 868490
Spacing Classification [email protected]
Pipe Wall
Pipe Material Pipe Size (mm) Substrate Seal Closure Device Aperture Edge Service Separation
Thickness (mm) Integrity Insulation
Separation (mm) (mm) Drawing Title:
(V9/AUG21) 58
ROCKWOOL Standard Detail:
Supporting Evidence : WF 411467 (BS EN 1366-3:2009)
100
Insulated fire sleeve through double 50mm batt - Single sided installation
Spacing Classification
Pipe Wall
Pipe Material Pipe Size (mm) Substrate Seal Closure Device Aperture Edge Service Separation
Thickness (mm) Integrity Insulation
Separation (mm) (mm)
Pencoed, Bridgend,
PVC 40 - 110 1.8 - 6.6 Double 50mm South Wales CF35 6NY
100mm thick PB / ablative coated t: 01656 868490
IFS - 150mm 0 0 120 120
Masonry wall batt 600mm (h) x [email protected]
HDPE 40 - 110 2.4 - 6.6 900mm (w)
Drawing Title:
Scale: Date:
NTS NOV 20
(V9/AUG21) 59
ROCKWOOL Standard Detail:
Supporting Evidence : WF 411471 (BS EN 1366-3:2009)
Combustible pipe through Solutions for flexible wall constructions can be used in
ROCKWOOL SoftSeal ROCKWOOL SoftSeal at 45 masonry constructions of the same minimum wall
Intumescent Sealant degree angle thickness (100mm Min.)
ROCKWOOL SoftSeal
applied to all abutments,
100 joints in batt and 300mm length of insulated fire 45° These products should only be utilised for applications as
perimeter of aperture sleeve 300 outlined in the relevant ROCKWOOL product data sheet
and in accordance with the relevant ROCKWOOL Fire
Resistance Testing. Additionally the product must be
Combustible Pipe installed in accordance with the current ROCKWOOL
100 guidelines.
100
Scale: Date:
NTS NOV 20
(V9/AUG21) 60
ROCKWOOL Standard Detail:
Supporting Evidence : WF 411457 / WF 411460 / WF
ROCKWOOL INSULATED FIRE SLEEVE ROCKWOOL INSULATED FIRE SLEEVE 411464 / WF 411467 (BS EN 1366-3:2009)
THROUGH 100MM THICK WALL THROUGH 75MM THICK WALL
The supporting construction must be capable of achieving
the required fire rating of the proposed Firestop.
Fire rated flexible wall / ROCKWOOL Acoustic Fire rated flexible wall / ROCKWOOL Acoustic
plasterboard partition plasterboard partition Insulated Fire Sleeve to be minimum 150mm long through
Intumescent Sealant Intumescent Sealant wall.
to fill gaps up to 10mm to fill gaps up to 15mm
25 37.5
between insulated fire between insulated fire Solutions for flexible wall constructions can be used in
sleeve and substrate. sleeve and substrate. masonry constructions of the same minimum wall
Combustible and Minimum 12.5mm Combustible and Minimum 12.5mm thickness (75mm or 100mm)
non-combustible pipes to be depth non-combustible pipes to be depth
adequately supported on each adequately supported on each Core holes through walls to have a minimum separation of
150mm. For reduced separation please contact
side of the wall side of the wall
ROCKWOOL Technical.
50
ROCKWOOL Insulated Fire ROCKWOOL Insulated Fire
These products should only be utilised for applications as
Sleeve to project by min. Sleeve to project by min. outlined in the relevant ROCKWOOL product data sheet
25mm from each face of the 37.5mm from each face of the and in accordance with the relevant ROCKWOOL Fire
wall. Min 150mm total length. wall. Min 150mm total length. Resistance Testing. Additionally the product must be
installed in accordance with the current ROCKWOOL
100 75 guidelines.
(V9/AUG21) 61
ROCKWOOL Standard Detail:
Supporting Evidence : WF 423089 / WF 423090
(BS EN 1366-3:2009)
Scale: Date:
NTS NOV 20
(V9/AUG21) 62
ROCKWOOL Standard Detail:
Supporting Evidence : WF 416060
Combustible or non combustible Core holes through floors to have a minimum separation
pipes to be adequately of 150mm. For reduced separation please contact
supported on both side of the ROCKWOOL Technical.
floor slab
Min 150mm These products should only be utilised for applications as
>15 <15 outlined in the relevant ROCKWOOL product data sheet
concrete floor slab Annular gaps up to 15mm. and in accordance with the relevant ROCKWOOL Fire
Use 50mm depth RWA45 Resistance Testing. Additionally the product must be
backing with 20mm depth installed in accordance with the current ROCKWOOL
Gaps >15mm fill
150 ROCKWOOL Acoustic guidelines.
with ROCKWOOL
Intumescent Sealant
Standard or HS
For further information or alternative products please visit
Compound www.rockwool.co.uk or contact our Technical Solutions
Team on 01656 868490
150mm length of
insulated fire
sleeve
Drawing Title:
Scale: Date:
NTS NOV 20
(V9/AUG21) 63
ROCKWOOL Standard Detail:
Supporting Evidence : WF 411470
(BS EN 1366-3:2009)
Fire rated flexible wall / Insulated Fire Sleeve to be minimum 150mm long through
plasterboard partition 0 (Sleeve to substrate) SoftSeal batt.
All gaps between sleeve 0 (Between sleeves)
Maximum of 2 No. Oval Sleeves side by side with zero
and substrate to be filled separation between sleeves.
with ROCKWOOL SoftSeal
Intumescent Sealant These products should only be utilised for applications as
outlined in the relevant ROCKWOOL product data sheet
25 and in accordance with the relevant ROCKWOOL Fire
ROCKWOOL Oval Insulated Fire Resistance Testing. Additionally the product must be
Max 2 No. side by side
Sleeve 60mm x 204mm 25 installed in accordance with the current ROCKWOOL
150mm long guidelines.
1200
60 Minutes 60 Minutes
Scale: Date:
NTS NOV 20
(V9/AUG21) 64
ROCKWOOL Standard Detail:
Supporting Evidence : WF 377056
Pencoed, Bridgend,
South Wales CF35 6NY
EZ Path Series 44+ fixing plate fixed in t: 01656 868490
accordance with manufacturers [email protected]
details/specification
Drawing Title:
Scale: Date:
NTS March 2017
(V9/AUG21) 65
Opening G
ROCKWOOL Standard Detail:
Supporting Evidence : WF 377056
Pencoed, Bridgend,
South Wales CF35 6NY
t: 01656 868490
EZ Path Series 44+ fixing plate with
[email protected]
composite sheet fixed to studs in
accordance with manufacturers
details/specification Drawing Title:
50
Scale: Date:
NTS March 2017
(V9/AUG21) 66
ROCKWOOL Standard Detail:
Supporting Evidence : WF 377055
STI steel hanger brackets fixed to floor Integrity Performance: Insulation Performance:
slab in accordance with manufacturers
details/specification 120 Minutes 120 Minutes
Floor slab
TECHNICAL SOLUTIONS
ROCKWOOL 140 Kg/m3 shuttering insulation Pencoed, Bridgend,
South Wales CF35 6NY
t: 01656 862 621
[email protected]
Drawing Title:
Scale: Date:
NTS MAR 17
(V9/AUG21) 67
ROCKWOOL Standard Detail:
INSTALLATION NOTES Supporting Evidence : WF 335645
1. Make sure that the area within the aperture is Maximum Opening Size: 400mm High x 6m long
clean of any debris and remove any dust from the
edges. The supporting construction must be capable of achieving
6m max. the required fire rating of the proposed Firestop.
2. Install the Rockwool Ablative Coated Batts
either vertically or using a stretcher bond pattern Flexible wall constructions must be installed in accordance
up to a maximum aperture size of 400mm x 6m. with the manufacturer's guidelines with the aperture being
Concrete soffit fully framed and lined out. The wall construction should be
3. Apply Rockwool Acoustic Intumescent Sealant of a minimum thickness of 100mm.
ROCKWOOL Acoustic
to the outer edges of the batt to seal the joints
Intumescent Sealant to all
between batts and supporting substrates. batt-to-batt and batt-to-substrate For service penetrations refer to single layer 50mm
joints. ablative coated batt penetration seal detail SD-112-RDW.
4. Continue installation until the aperture is
400mm max.
completely filled. These products should only be utilised for applications as
50mm ROCKWOOL Ablative
Coated Batt outlined in the relevant ROCKWOOL product data sheet
5. Apply a bead of Rockwool acoustic intumescent and in accordance with the relevant ROCKWOOL Fire
sealant, approximately 15 mm wide, around the Resistance Testing. Additionally the product must be
perimeter of the batt ensuring that all gaps installed in accordance with the current ROCKWOOL
between the batt and surrounding edges are fully Drywall or blockwork guidelines. For further information please visit
filled. supporting wall www.rockwool.co.uk or contact our Technical Solutions
Team on 01656 868490
6. Repeat step 5 on the other side of the batt
Up to 60 Minutes Up to 60 Minutes
Pencoed, Bridgend,
50mm Ablative Coated Batt 50mm Ablative Coated Batt
South Wales CF35 6NY
t: 01656 868490
[email protected]
15mm bead ROCKWOOL 15mm bead ROCKWOOL
Acoustic Intumescent Sealant Acoustic Intumescent Sealant Drawing Title:
Scale: Date:
NTS DEC 18
(V9/AUG21) 68
ROCKWOOL Standard Detail:
INSTALLATION NOTES Supporting Evidence : WF 311319
20m max.
1. Make sure that the area within the aperture is Maximum Opening Size: 1200mm High x 20M long
clean of any debris and remove any dust from the
edges. The supporting construction must be capable of achieving
Steel beam or concrete soffit
the required fire rating of the proposed Firestop.
2. Install the Rockwool Ablative Coated Batts
either vertically or using a stretcher bond pattern Flexible wall constructions must be installed in accordance
up to a maximum aperture size of 1200mm x 20m. with the manufacturer's guidelines with the aperture being
fully framed and lined out. The wall construction should be
3. Apply Rockwool Acoustic Intumescent Sealant of a minimum thickness of 100mm.
to the outer edges of the batt to seal the joints ROCKWOOL Acoustic Intumescent
between batts and supporting substrates. Sealant to all batt-to-batt and
For service penetrations refer to single layer 60mm
batt-to-substrate joints.
ablative coated batt penetration seal detail SD-106-RDW.
1200mm max.
4. Continue installation until the aperture is
completely filled. Where the Ablative Coated Batt forms a seal up to a
structural beam, which has been protected with
5. Apply a bead of Rockwool acoustic intumescent intumescent paint then an Insulation rating cannot be given
sealant, approximately 15 mm wide, around the 60mm ROCKWOOL Ablative (due to heat transfer through the steel). For applications
perimeter of the batt ensuring that all gaps Coated Batt requiring an insulation rating from the beam then please
between the batt and surrounding edges are fully contact Rockwool Technical for Rockwool Beamclad
filled. solutions.
6. Repeat step 5 on the other side of the batt Drywall or blockwork These products should only be utilised for applications as
supporting wall outlined in the relevant ROCKWOOL product data sheet
7. Repair any damage to the coating which may and in accordance with the relevant ROCKWOOL Fire
have occurred during installation by brush Resistance Testing. Additionally the product must be
applying Rockwool ablative coating. installed in accordance with the current ROCKWOOL
guidelines. For further information please visit
www.rockwool.co.uk or contact our Technical Solutions
Team on 01656 868490
Up to 60 Minutes Up to 60 Minutes
Pencoed, Bridgend,
60mm Ablative Coated Batt 60mm Ablative Coated Batt
South Wales CF35 6NY
t: 01656 868490
[email protected]
15mm bead ROCKWOOL 15mm bead ROCKWOOL
Acoustic Intumescent Sealant Acoustic Intumescent Sealant Drawing Title:
Scale: Date:
NTS AUG 18
(V9/AUG21) 69
GENERAL REQUIREMENTS ROCKWOOL Standard Detail:
Supporting Evidence : CC 295758
Supporting wall structures must have a
minimum density of 400 kg/m3 400 max.
For Air Seal paint linear fire stop with ROCKWOOL
Ablative Coating.
The supporting substrates must have a Fire
Resistance performance equal to or greater
This product should only be utilised for applications as
than that required by the Firestop.
outlined in the relevant ROCKWOOL product data sheet
ROCKWOOL Linear Firestop 2A ROCKWOOL Trapezoidal and in accordance with the relevant ROCKWOOL Fire
The Joint height from the top of the wall to the Self tapping screws or hammer Firestop 2B
Resistance Testing. Additionally the product must be
underside of the floor slab shall not be fixings
installed in accordance with the current ROCKWOOL
greater than the thickness of the wall. The ROCKWOOL Linear Firestop 2A
guidelines. For further information please visit
Firestop shall be the same depth of the wall.
www.rockwool.co.uk or contact our Technical Solutions
ROCKWOOL Trapezoidal Team on 01656 868490
Firestop 2B
INSTALLATION NOTES
SINGLE DECK PROFILE RUNNING IN LINE, DECK PROFILE RUNNING IN LINE WITH
1. Ensure the opening is clean and free of BUT ASYMMETRICAL, WITH THE WALL THE WALL
any debris. LINE
(V9/AUG21) 70
ROCKWOOL Standard Detail:
ROCKWOOL FIREPRO® Acoustic
Rigid wall Intumescent Sealant Supporting Evidence : ETA15-0327 / CF5577
• min. 100mm thick
• max. width and depth as per table
• Fire rated to at least the same fire rating as the firestop seal
Steel substrate
Flexible wall
Rigid floor
• min. 120mm thick
• min. 2no. board layers • Fire rated to at least the same fire rating as the firestop seal Pencoed, Bridgend,
• Fire rated to at least the same fire rating as the firestop seal
South Wales CF35 6NY
ROCKWOOL FIREPRO® Acoustic t: 01656 868490
ROCKWOOL FIREPRO® Acoustic Intumescent Sealant
Intumescent Sealant • max. width and depth as per table
[email protected]
• max. width and depth as per table
Flexible wall
Backing rod • min. 120mm thick Drawing Title:
• min. 2no. board layers
Rigid wall • Fire rated to at least the same fire rating as the firestop seal
FIREPRO® Acoustic Intumescent Sealant
• min. 100mm thick
• Fire rated to at least the same fire rating as the firestop seal
Application Range
VERTICAL SEAL HORIZONTAL SEAL
ACOUSTIC INTUMESCENT SEALANT BETWEEN ACOUSTIC INTUMESCENT SEALANT
CONCRETE AND PLASTERBOARD SUBSTRATES BETWEEN PLASTERBOARD HEAD OF WALL
AND CONCRETE SOFFIT Scale: Date:
NTS JUN 21
(V9/AUG21) 71
ROCKWOOL Standard Detail:
INSTALLATION NOTES Supporting Evidence : WF 341623 B
1). Measure the width of the Linear Joint to be sealed. The supporting construction must be capable of achieving
2). Cut the FIREPRO® SoftSeal Linear Joint Seal up to 25% larger than the joint width, so when installed the seal is under compression. the required fire rating of the proposed Firestop.
3). Ensure substrate is clean and free of dust and debris. As part of the testing to BS EN 1366-4, FIREPRO
SoftSeal was assessed for its movement capabilities,
4). Install the FIREPRO® SoftSeal Linear Joint Seal with the coating on the top surface. (Double sided coatings are available)
prior to conducting the fire test. The product was tested
5). Apply FIREPRO® SoftSeal Flexible Coating to top face of all butt joints between pieces of SoftSeal Linear Joint Seal. to accommodate movement (expansion and contraction)
of +/-25%.
6). Apply FIREPRO® SoftSeal Flexible Coating to top face of all joints between the seal and the substrate, overlapping by 20mm.
Linear joint widths of up to 350mm can be accommodated
7). Apply FIREPRO® SoftSeal Flexible Coating across the face of all butt joints between sections of Soft Seal Linear Joint Seal.
with the inclusion of steel Z brackets. For more advice
please contact ROCKWOOL technical.
Floor slab
Pencoed, Bridgend,
SoftSeal Flexible Coating Application Notes: South Wales CF35 6NY
t: 01656 868490
1) Apply FirePro SoftSeal flexible coating to the top face of all joints between the seal and the substrate.
[email protected]
2) Apply FirePro soft seal Flexible Coating to the top face of all butt joints between pieces of SoftSeal Linear Joint Seal.
Drawing Title:
Scale: Date:
NTS 07.12.17
(V9/AUG21) 72
ROCKWOOL Standard Detail:
NOTE: FOR EXTENDED CAVITY WIDTHS OF 600mm - 1000mm
PLEASE CONTACT ROCKWOOL TECHNICAL FOR DETAILS
Supporting Evidence : BRE 89697_Rev 6 & WF 393583
Refer to table for Max. seal width The supporting construction must be capable of achieving
the required fire rating of the proposed Firestop.
Internal wall
SP 60/120 FireStop
For cavity widths over 250mm seal joints Refer to table for Max. seal width Integrity Performance: Insulation Performance:
to top of FireStop with foil tape. Slab cut
on site to suit cavity width + up to 5mm to Up to 120 Minutes Up to 120 Minutes
allow for compression
(V9/AUG21) 73
ROCKWOOL Standard Detail:
INSTALLATION NOTES Supporting Evidence : WF 393583
1. Cut the ROCKWOOL SP Firestop Slab to suit Seal joint with aluminium This detail is to be read in conjunction with the
the cavity size, ensuring a tight fit. foil tape if void is 250mm ROCKWOOL SP Firestop data sheet specific installation
or greater instructions.
2. Measure the location of the masonry support
bracket in relation to the SP Firestop Slab and If the masonry support anchor penetrates the SP FIrestop
SP Fixing Brackets at
carefully slit the SP Firestop, with a serrated 500mm centres (250mm by more than 50% contact ROCKWOOL Technical
blade, to tightly accommodate the masonry from each edge) Services.
support bracket.
These products should only be utilised for applications as
SP Firestop to be installed outlined in the relevant ROCKWOOL product data sheet
3. The masonry support bracket should only with masonry support anchor
impale the SP Firestop Slab by 50% of the 50% through firestop and in accordance with the relevant ROCKWOOL Fire
firestop thickness. Resistance Testing. Additionally the product must be
installed in accordance with the current ROCKWOOL
4. Bend the SP Fixing Brackets into a suitable guidelines. For further information please visit
profile, either Z-shape or L-shape. www.rockwool.co.uk or contact our Technical Solutions
Team on 01656 868490.
5. Impale the SP Fixing Brackets into the SP
Firestop at mid-depth, ensuring that the bracket
penetrated though 75% of the span of the
firestop. Space the SP Fixing Brackets at 500mm
centres (a maximum of 250mm in from each
edge).
8. Repeat the previous steps with the next length ROCKWOOL SP Firestop cut SP60 Integrity Performance: SP60 Insulation Performance:
of SP Firestop Slab ensuring both lengths of oversized for void to allow
for compression fit
firestop are tightly abutted. 60 Minutes 60 Minutes
9. If the cavity width is greater than, or equal to, ROCKWOOL SP Fixing Bracket SP120 Integrity Performance: SP120 Insulation Performance:
impaled through min. 75%
250mm then the joints between adjacent lengths of SP Firestop
of SP Firestop Slab should be sealed on the top 120 Minutes 120 Minutes
surface with aluminium foil tape. ROCKWOOL SP Fixing Bracket
secured with non-combustible fixings
suitable for the substrate
Scale: Date:
NTS OCT 18
(V9/AUG21) 74
SP Plus Firestop ROCKWOOL Standard Detail:
Cut SP Plus Firestop 10mm oversized to allow
≤ Ø 110mm PVC or HDPE plastic pipe for compression. Service penetrations through Supporting Evidence : WF 405114
2.8mm - 10.6mm wall thickness the SP Plus Firestop should be cut as small a
possible.
The supporting construction must be capable of achieving
SP FireStop Fixing Bracket
Fixed to floor slab at 500mm centres - 250mm
the required fire rating of the proposed Firestop.
ROCKWOOL Insulated Fire Sleeve
25mm thick and cut to 175mm length (50mm from each joint. Bracket cut on site to pentrate
protrusion each side of the seal) fire stop material by Min . 75% For further details on Curtain Walling & Cladding
Fitted around the pipe and jointed with foil tape The brackets can be faced fixed to the internal
50 wall if required. applications please refer to the SP FireStop product data
sheet.
Floor slab
See Table See Table
External brickwork / cladding
/ curtain walling
Internal wall
≤ 110
Pencoed, Bridgend,
300 max.
South Wales CF35 6NY
t: 01656 868490
Performance (mins) Test
Service separation [email protected]
Service type minimum (mm) Notes
Standard
Integrity Insulation Aperture Services
Drawing Title:
≤ Ø 40mm (1.9mm - 3mm wall) 90
PVC pipe Ø 41mm - 110mm (4.2mm - 6.6mm 120
60
Insulated Fire Sleeve wrapped SP Plus Firestop
wall) around the pipes with 50mm Service Penetration - Horizontal
≤ Ø 40mm (2.4mm - 3.7mm wall) 90 projection to both sides of
HDPE pipe Ø 41mm - 110mm (2.7mm - 10mm 120 EN 0 100 the seal.
60
wall) Scale: Date:
NTS MAY 19
Steel or copper H&V Pipe Section installed
≤ Ø 108 mm 120 30
pipe 1m centrally through the seal. Sheet Size: Drawn By: Checked By:
A3 S. HIRONS RW TECH
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-236-RW C
(V9/AUG21) 75
August 2021
ROCKWOOL Limited
Pencoed
Bridgend
CF35 6NY
Tel: 01656 862 621
[email protected]
rockwool.com/uk