0% found this document useful (0 votes)
54 views1 page

Item 206 Cu.m.

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
54 views1 page

Item 206 Cu.m.

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 1
DETAILED UNIT PRICE ANALYSIS (DUPA) Item No Description 206 (1) Chemically Stabiized Road Mix Subbase/ Base Course Unitof Measurement cum (Output per hour 35.00 cum Designation No.of Hours | Hourly Rate Amount |A [Labor la. Construction Foreman 1 1.00 136.903" 136.93 lb. Unskiled Laborer 2 1.00 7788" 155.72 Sub -Totalfor A 202.65 Name and Capacity NoofUnits | No.ofHours | HourlyRate Amount . | Equipment 1. Motorized Road Grader w Scarifier 4 on cee ee (140 tp), 67108 | lb. Vibeatry Roller 10 mt), SO100DC 1 oss 1,848.00 1,199.90 |c. Water Truck/ Pump (16000 L) 1 020 2,450.00 490,00 or Spraying Sub -Totalfor 8 3102.36 ic. oval (A + 8) 3305.00, D. [Output per hour = 35.00 cum E. [Direct Unt Cost(C + D) 97.00, Name and Specification Unit Quantity | Unit Cost ‘Amount F.[Materats a. Aggregate Subbase/Base Course cum Ara 56.00" eaao (0 15% Shrinkage Factor) lb. Polymer (RT20 Dynamic Liquid Sol Stabiizer) i oz 3,975.00" 834.75 (w 5% Allowance) a ‘Sub-Total for i 1495.65 G. [Direct Unit Cost + F) 7582.65 H.[Overnead, Contingencies & Miscelaneous (OCM) Toe of 156.27 1. [Contractor's Proft (CP) Bur ofS 72661 4. [Value Added Tax (VAT) ECERED) 93.38) K. Total Unt Cost (G+H+led) 7960.80, * NCR Labor and Matoial Rais wer lizd Tor unit cost preseriation purposes. Thera of polymer versus aggregate materials of tJcum. i based on the required actual appiation rate which may vary rom producto product ‘The unit cost ofthe mati tobe adopted shall be based onthe lowost canvas price with the same speciation ‘The unit cost ofthe mater ued inthe DUPA was provided by the supplier [OPPS ProductPhis, Inc) for unit cost presentation purposes only. ‘The markup (OGM and CP) wile in thle Cat Sheet shall vary dapending en the Total Direct Cost ofthe project a par DO 197, ai of 2018,

You might also like