JHA Fo Scaffolding Works

1. This JHA worksheet covers scaffolding works within the RAPID-P7 polypropylene plant involving potential hazards such as inexperienced workers, release of toxic or flammable gases, fire hazards, and high noise exposure. 2. Control measures include requiring valid certifications and training for workers, conducting a toolbox talk to brief workers on JHA, and using the proper PPE. 3. Emergency contacts include the First Aider, TCMHQC Medic, RAPID PMC duty officer, and the plant emergency phone.

Uploaded by

Sreetharan S
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
189 views11 pages

JHA Fo Scaffolding Works

1. This JHA worksheet covers scaffolding works within the RAPID-P7 polypropylene plant involving potential hazards such as inexperienced workers, release of toxic or flammable gases, fire hazards, and high noise exposure. 2. Control measures include requiring valid certifications and training for workers, conducting a toolbox talk to brief workers on JHA, and using the proper PPE. 3. Emergency contacts include the First Aider, TCMHQC Medic, RAPID PMC duty officer, and the plant emergency phone.

Uploaded by

Sreetharan S
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

RAPID-P0007-LES-HSE-012

Serial No.
JHA WORKSHEET
0
Revision No.
SCOPE OF WORK / JOB TITLE:
SCAFFOLDING WORKS (ALL AREA)

AREA / LOCATION: TAG / EQUIPMENT NO.: SERVICE / MEDIUM:


RAPID – P7-POLYPROPYLENE SCAFFOLDING WORKS FOR P7 PLANT (ALL AREA) TCMHQC : LITANY ENERGY

OVERALL RISK RATING Medium √ High


Low Very High
(TICK √)

Name Department/Company Name Department/Company

Mr. Saefullah PRPC


Mr. Syed Muhammad PRPC
Syed Shahrom
Ms. Siti Norliyana Pref-Chem
Mr. Radin Luqman Pref-Chem
JHA MEMBERS Mr. G. Pirabo TCMHQC
S. Sreetharan LITANY ENERGY

Name Department/Company Date Signature

JHA Leader / Reviewer

Approving Authority (UPT)

Approving Authority (OPE)


RAPID-P0007-LES-HSE-012
Serial No.
JHA WORKSHEET
0
Revision No.
SCOPE OF WORK / JOB TITLE:
SCAFFOLDING WORKS (ALL AREA)

Step No. Step Description Potential Hazards /


Control / Recovery Measures Responsible Person
Consequence (P/E/A/R)
1. Working at Operation Area 1. In-experienced workers Work personnel: -
Entry of employee to (P) 1. To have valid CIDB, Medical
Operation Area check-up, RAPID access card
2. The working personnel to
2. Release of gas (toxic,
attend the TCMHQC safety
flammable) (P/E) induction course and working
at height training and
3. Fire hazard (P/E/A/R) operation induction.
3. Briefed them on the Job Hazard
4. High noise exposure (P) Analysis (JHA) during toolbox
talk, monitoring while
performing the task,
1. Work Leader
4. Appropriate personal
2. Supervisor
protective equipment which
3. Worker
include safety helmet, safety
4. HSE personnel
shoes, clear safety glass, fire-
retardant coverall, ear
protection & PPE must follow
all indications refer from SDS or
PTW
5. Work in buddy system.

Shelter & facilities: -


6. To have safe shelter and
provided with sufficient
drinking water.
RAPID-P0007-LES-HSE-012
Serial No.
JHA WORKSHEET
0
Revision No.
SCOPE OF WORK / JOB TITLE:
SCAFFOLDING WORKS (ALL AREA)

Other requirements to be
followed: -
7. Obtain Operation Permit to
Work (PTW) & necessary
certificate such as (Vehicle
Entry Permit)
8. PTW Applicant & Work leader
shall be trained in operation
PTW prior application
9. Work activity shall be
suspended once the alarm
(PAGA system) is activated &
assemble at mustering point
10. Prohibit using of ignition
source equipment’s in plant
area like mobile phone, Lighter,
Electronic devices.
11. All tools & equipment to be
inspected by central
maintenance team.
12. Inspection of vehicle to be
During an emergency: done at CMT workshop and
First Aider / TCMHQC Medic can be contacted at (Ambulance) VEC to be obtained from Plant
+60195775195 Owner prior to entering
RAPID PMC duty officer +607-8174999 can be contacted during process area
emergency / Plant Emergency phone
RAPID-P0007-LES-HSE-012
Serial No.
JHA WORKSHEET
0
Revision No.
SCOPE OF WORK / JOB TITLE:
SCAFFOLDING WORKS (ALL AREA)

2. Scaffolding  Supervisor check the  Body injury  Need to apply Operation PTW.
activity at  Need to attend Operation
scaffolding area prior to  Property damage
Operation area training.
start work.
 RA must attend Operation
 Level 3 inspector checks PTW training.
before start work.  Used full body harness with
valid quarterly inspection and
 Scaffolder start work
100% hooked.
for erection, dismantle  Secure material with tie it.
and modification.  Supervisor should recheck
before release workers after
finish work.  Scaffolding inspector
 Use suitable hand glove.  Scaffolding supervisor
 PPE standardize and complied
(safety helmet, safety shoes,  Scaffolder
clear safety glass, hand gloves,
FRC coverall).
 All tools need to attach
lanyard.
 Supervisor need to do pre job
briefing before start work.
 Supervisor need acknowledge
about live equipment.
 Buddy system is needed.
 Need proper storage
materials.
RAPID-P0007-LES-HSE-012
Serial No.
JHA WORKSHEET
0
Revision No.
SCOPE OF WORK / JOB TITLE:
SCAFFOLDING WORKS (ALL AREA)

 Area to be installed with hard


barricade and signage.
3. Material  Locate material to work  Body injury  Crane to be inspected by CMT
Preparation location. Workshop and apply VEC from
 Muscle injury
 Lifting material by Plant Owner prior to entering
crane to the activity  Back pain process area.
area.  Slip, trip and fall  Lifting certificate need to be
 Manual handling,  Crane Topple obtained prior to start lifting
material to the activity works.
area  Lifting supervisor, rigger &
signalman to standby prior to
start of lifting works.
 Scaffolding Supervisor
 Use of tag line while lifting
works in progress.  Lifting Supervisor
 Lifting area to be barricaded  Scaffolders
with appropriate signage
 Use gin wheel pulley to
shift/transfer material at
height.
 Tie material properly before
lifting.
 Clear materials from
obstructing access.
 Use scaffolding clamp lifting
bags to transfer materials.
 Ensure to wear inspected full
RAPID-P0007-LES-HSE-012
Serial No.
JHA WORKSHEET
0
Revision No.
SCOPE OF WORK / JOB TITLE:
SCAFFOLDING WORKS (ALL AREA)

body hardness with double


lanyard and tie off 100% at
anchor point / lifeline.
 Proper storage for scaffold
material.
 Use high impact glove or grip
gloves.
 Prepare & use end caps /

rubber to protect vessel


internal parts from getting
damaged
4. Transfer  Scaffold segregated by  Body injury  Lorry crane to be inspected by
Scaffolding tubes, planks, clamps  Muscle injury CMT Workshop and apply VEC
Materials for erection.  Property damage from Plant Owner prior to
 Supervisor check the  Restricted emergency exit entering process area.
item condition prior to route  Lifting certificate need to be
shift.  Machinery Topple obtained prior to start lifting  Scaffolding Supervisor
 Lorry crane truck to works.
 Lifting Supervisor
shift material to work  Lifting supervisor, rigger &
area. signalman to standby prior to  Scaffolders
 Manual handling start of lifting works.
materials.  Use of tag line while lifting
 Method of works in progress.
communication  Lifting area to be barricaded
between 2 persons with appropriate signage
 Ensure scaffolding materials are
RAPID-P0007-LES-HSE-012
Serial No.
JHA WORKSHEET
0
Revision No.
SCOPE OF WORK / JOB TITLE:
SCAFFOLDING WORKS (ALL AREA)

properly barricaded.
 Trained Signalman for guiding
route.
 Ensure shifting route have good
access for transfer material.
 Ensure forklift in good
condition.
 Use grip gloves/high impact
gloves.
 Ensure material cannot fall
from height. All materials to be
properly secured.
5. Working at height  Fall from height  Body injury  Body harness with double
 Falling object  Muscle injury lanyards must be worn at all
times while working at height
 Property damage (above 2 meters)
 Ensure 100% tie-off at all times
at anchor points. (both lanyards
and chin strap)  Scaffolding supervisor
 Semi rubber cotton gloves must  Scaffolders
always be worn and in good
condition.
 Only personnel with Working at
Height training are allowed to
perform the task.
 Secure materials on elevated
RAPID-P0007-LES-HSE-012
Serial No.
JHA WORKSHEET
0
Revision No.
SCOPE OF WORK / JOB TITLE:
SCAFFOLDING WORKS (ALL AREA)

platforms with scaffold rack to


avoid falling objects.
 In-house WAH training by
TCMHQC
6. Erection of  Alignment of tubes with  Body injury  Supervisor must monitor
scaffolding erection works at all times
level gauge.  Head injury
 Barricade scaffolding erection
 Tightening of clamps  Hand injury area and put signage
and continue erection  Leg injury “Scaffolding Works In
 Ensure erection works  Muscle injury Progress”.
 Only workers with scaffold
are based on Method of  Property damage
competency are allowed to
Statement (MOS) enter the work area and erect
 Walking on 2 planks the scaffold structure.
(minimum) during  Ensure all tools brought up are  Scaffolding supervisor
erection works secured to persons with  Scaffolders
 Fall from height lanyard.
 Pinch point  Ensure all workers use semi
rubber cotton gloves at all
 Slip and trip
times.
 Falling objects  Be alert for pinch points while
 Sharp edges handling materials and wear
semi rubber cotton gloves at
all times.
 Ensure 100% tie-off to anchor
points above head while
RAPID-P0007-LES-HSE-012
Serial No.
JHA WORKSHEET
0
Revision No.
SCOPE OF WORK / JOB TITLE:
SCAFFOLDING WORKS (ALL AREA)

moving around.
 Ensure no gaps between
scaffold planks
 Toe boards to be made
available.
 Scaffolding validity is 7 days.
Need to re-validate upon
expiry.
 In-house WAH training by
TCMHQC
7. Modification of  Supervisor check the  Body injury  Ensure no unauthorized
scaffolding personnel are within the
area prior to  Head injury
modification area
modification.  Hand injury  Only competent workers are
 Dismantle scaffold tube  Leg injury allowed to perform the
 Erection of scaffold  Muscle injury modification works
 Barricade around scaffold
tube  Property damage  Scaffolding supervisor
modification with signage
 Tightening of clamp “Scaffolding Works In Progress”.  Scaffolders
 Level 3 inspector to  Ensure all tools brought up are
check the saffold before secured to persons with
start modification. lanyard.
 Be alert for pinch points while
handling materials and wear
semi rubber cotton gloves at all
time.
RAPID-P0007-LES-HSE-012
Serial No.
JHA WORKSHEET
0
Revision No.
SCOPE OF WORK / JOB TITLE:
SCAFFOLDING WORKS (ALL AREA)

 Ensure 100% tie-off to anchor


points above head while moving
around.
 Ensure no gaps between
scaffold planks
 To board to be made available
 In-house WAH training by
TCMHQC
8. Dismantle of  Supervisor to check the  Body injury  Barricade scaffolding erection
scaffold area and put signage
area prior to  Head injury
“Scaffolding Works In
dismantling.  Hand injury Progress”.
 Brief scaffolders on  Leg injury  Only workers with scaffold
steps on dismantling.  Muscle injury competency are allowed to
enter the work area and erect
 Scaffolders start to  Property damage the scaffold structure.
dismantle.  Ensure all tools brought up are  Scaffolding supervisor
 Premature collapse of secured to persons with  Scaffolders
lanyard.
scaffold structure.
 Be alert for pinch points while
handling materials and wear
semi rubber cotton gloves at
all times.
 Ensure 100% tie-off to anchor
points above head while
moving around.
RAPID-P0007-LES-HSE-012
Serial No.
JHA WORKSHEET
0
Revision No.
SCOPE OF WORK / JOB TITLE:
SCAFFOLDING WORKS (ALL AREA)

 Ensure no gaps between


scaffold planks
 Stand by person at ground level
to warn passer-by to keep their
distance.
 In-house WAH training by
TCMHQC
9. Fatigue  Tired  Property damage
Management  Scaffolding inspector
 Low concentration  Body injury
 Job rotation if necessary.
 Scaffolding supervisor
 Working with buddy system.
 Scaffolder

10. General  Scaffolder material will  Property damage


housekeeping be arranged at the  Personnel injury  Use appropriate gloves to
storage area.
protect hand from splinters and
 Clear the obstacle item
sharp edges
from main road.
 Move carefully in the work area
 Clean the unnecessary  Site supervisor
and beware of tripping hazards
item at storage area.  Operator
 Ensure scaffold tube keep with
 Ensure all access way
proper storage rack.
kept clear.
 Maintain daily good
 Slip, trip, and fall
housekeeping.
 Obstruction material on
the main route.