191AIE504T - Software Engineering MCQ Banks With Answers: ANSWER: All Mentioned Above
191AIE504T - Software Engineering MCQ Banks With Answers: ANSWER: All Mentioned Above
a. System software
b. Application software
c. Scientific software
a. True
b. False
ANSWER: True
a. Project planning
b. Scope management
c. Project estimation
a. Functional Requirement.
b. Nonfunctional Requirement.
c. Goals of implementation.
a. Spiral model
b. Big Bang model
c. V-model
d. Waterfall model
ANSWER: Waterfall
model
a. Software Design
b. Feasibility Study
c. Requirement Gathering
d. System Analysis
10. Which design identifies the software as a system with many components interacting
with each other?
a. Architectural design
b. High-level design
c. Detailed design
d. Both B & C
d. Set of programs
a. Quality management
b. Risk management
c. Performance management
d. Efficiency management
13. If every requirement stated in the Software Requirement Specification (SRS) has
only one interpretation, SRS is said to be correct .
a. Unambiguous
b. Consistent
c. Verifiable
a. Requirements elicitation
b. Requirements analysis
c. Requirements design
d. Requirements documentation
a. Reliability
b. Efficiency
c. Portability
ANSWER: Efficiency
17. Modifying the software to match changes in the ever changing environment is called
.
a. Adaptive maintenance
b. Corrective maintenance
c. Perfective maintenance
d. Preventive maintenance
18. If every requirement can be checked by a cost-effective process, then the SRS is
.
a. Verifiable
b. Traceable
c. Modifiable
d. Complete
ANSWER: Verifiable
a. is_a relationship
b. part_of relationship
c. composed_of relationship
d. none of above
a. RE = P/L
b. RE = P + L
c. RE = P*L
d. RE = 2* P *L
ANSWER: RE = P*L
21) Number of clauses used in ISO 9001 to specify quality system requirements are .
a. 15
b. 20
c. 25
d. 28
ANSWER: 20
a. Static view
b. Functional view
c. Dynamic view
b. Software design
c. Testing
a. Unit Testing
b. Beta Testing
c. Stress Testing
d. Mutation Testing
ANSWER: Mutation
Testing
25) If the objects focus on the problem domain, then we are concerned with .
27) Which of the following is not a part of the Test Implementation and Execution Phase?
Tests
a. Are most useful in uncovering defects in the process flows during real world use of the
system.
b. Are most useful in uncovering defects in the process flows during the testing use of the
system.
c. Are most useful in covering the defects in the process flows during real world use of the
system.
ANSWER: Are most useful in uncovering defects in the process flows during real world use of
the system.
c. Memory leaks.
30) Which plan describes how the skills and experience of the project team members will
be developed ?
a. HR Plan
b. Manager Plan
c. Team Plan
Plan
a. Acceptance testing
b. Integration testing
c. System Testing
d. Unit testing
32) The model in which the requirements are implemented by its category is .
b. Waterfall Model
c. Prototyping
35) The tools that support different stages of software development life cycle are called
.
a. CASE Tools
b. CAME tools
c. CAQE tools
d. CARE tools
ANSWER: CASE
Tools
36) Which defect amplification model is used to illustrate the generation and detection of
errors during the preliminary steps of a software engineering process?
a. Design
b. Detailed design
c. Coding
37) Which method is used for evaluating the expression that passes the function as an
argument?
a. Strict evaluation
b. Recursion
c. Calculus
d. Pure functions
a. Risk avoidance
b. Risk monitoring
c. Risk timing
d. Contingency planning
39) Staff turnover, poor communication with the customer are risks that are
extrapolated from past experience are called .
a. Business risks
b. Predictable risks
c. Project risks
d. Technical risks
40) Organization can have in-house inspection, direct involvement of users and release
of beta version are few of them and it also includes usability, compatibility, user
acceptance etc. is called .
a. Task analysis
d. Testing
ANSWER: Testing
a. Feasibility study
b. Requirement Gathering
43) Software safety is a quality assurance activity that focuses on hazards that may
cause an entire system to fall.
a. True
b. False
ANSWER: True
45) Effective software project management focuses on the four P’s. What are those
four P’s?
a. Quality
b. Efficiency
c. Accuracy
d. Both A and B
e. Both B and C
48) Which testing is the re-execution of some subset of tests that have already
been conducted to ensure the changes that are not propagated?
a. Unit testing
b. Regression testing
c. Integration testing
d. Thread-based testing
3) Divide the project into various smaller parts for ease of management.
a. True
b. False
ANSWER: True
b. Acceptance testing
c. Integrated testing