TATA PROJECTS LIMITED

“Mithona Towers-1”, House No. 1-7-80 to 87, Opp. Wesley Co-Ed. Jr. College Prenderghast Road, Secunderabad–500 003.
Ph+91-040-6623 8801, Fax +91-40-6617 2535

CERTIFICATE OF CONFORMANCE
Ref No: TPL-048-M-C0C-396 Date: 10.04.2023
Contract Name & Project : FGD SYSTEM PKG. FOR TALCHER STPS (2 X500 MW + 4 X 500 MW)
Contract No./ P.O. No. : CS-4300-109(5)-9-FC-NOA-6914 DT. 30.03.2020
Sub Contractor's Name : M/s Pinax Steel Industries Pvt Ltd
QTY.
Description of Item / Specification Size NTPC Drg.No./ GFR Balance
Sl No. Make Offered BBU. Ref Identification Mark
Equipment / Type / Rating Drg.No. QTY.

1 FLUE GAS DUCT lS:2062 PINAX As Per attached 24.646 MT - NON-BBU As per Annexure of PSIPL/TPL-023
annexure of PSIPL/TPL-
023

It is hereby confirmed that the above mentioned component/item/equipment was/were manufactured and tested in accordance with drawings/ data sheets / NTPC Spec as
referred above and found acceptable
And, in case of demand, the relevant Quality related certificates will be made available to NTPC.

Signature :
Name S: SIVA RAMA KRISHNA
Designation: Sr. Manager - QSS-Quality
Note:
1 Wherever any deviation has been accepted by the contractor relevant details should be enclosed with the Certificate of Conformance
2 For Mandatory and Recommended spares, the contractor shall ensure 100% Interchangeability with original equipment and furnish a certificate to this effect along with
Certificate of Conformance.

FORMAT NO.FORMAT NO:QS-01-QAI-P-05A/F2 Dated 04.04.18 ENGG.DIV / QA&1