EPSCPE100 Quick Start
EPSCPE100 Quick Start
g
Contents
1. User Features ................................................................................................................. 3
1.1. Membrane Run/Stop push button ........................................................................ 4
1.2. LED Indicators (LEDs)........................................................................................... 5
1.3 Ethernet Ports .................................................................................................... 6
2. Hardware Installation................................................................................................... 8
2.1. Initial Checks ...................................................................................................... 8
2.2. Installation Location ........................................................................................... 8
2.3. Grounding.........................................................................................................11
3. Module Start-up ........................................................................................................... 12
3.1. You Will Need: ...................................................................................................12
3.2. Basic Installation Steps:......................................................................................12
4. Programming the EPSCPE100 ................................................................................... 13
4.1. Backwards Compatibility....................................................................................13
4.2. PROFINET Controller Configuration .....................................................................13
RUN/IO STOP/IO
Enabled Disabled
Note: LAN2 will not be operational unless it is configured from the programmer with a
valid IP address.
A typical application will take advantage of the two independent LANs. The dedicated
LAN 1 port will be used for communications with plant-level or supervisory layers. The
Figure 2: Typical Multi-Tier LAN Application (supports only Star/Bus network topology)
Thermal Requirements:
When mounting the CPE100, allow a minimum clearance of 50mm on the left & right
side of the unit and a minimum clearance of 100mm on the top & bottom sides.
Instructions to mount the CPE100 on a DIN Rail:
The CPE100 snaps easily onto the DIN rail. No additional tools are required.
(1) Incline the unit so that the upper hooks of the DIN rail adaptor engage with the
upper edge of the DIN rail.
8 RSTi-EP EPSCPE100 Standalone CPU Quick Start Guide GFK-3012
(2) Press on the lower part of the unit until you hear a click. The click indicates that the
lower hooks of the DIN rail adaptor have engaged with the lower edge of the DIN rail.
If you need any technical help, please contact Technical Support. For phone numbers
and email addresses, refer to the back cover of this Guide.
(1) Attach the panel mount plate to the rear side of CPE100 using the four M3 screws
supplied with the adapter.
(2) Fasten the tabs of panel mount adapter in the appropriate location of panel with
the four screws. The screw size used for each panel mount tab should not exceed M5.
Note: The above features may be supported in the subsequent FW release. Refer to
the data sheet.
User manuals, product updates and other information sources are available on the
Support website, https://ge-ip.force.com/communities/CC_Home, under Controllers
and IO, RX3i Controllers.
g
Global regional phone numbers are available on our web site
www.geautomation.com
Copyright © 2017 General Electric Company. All Rights Reserved.
* Trademark of General Electric Company and/or its subsidiaries.
All other trademarks are property of their respective holders