Section Section Cs - 1 Detail Schedule of Beam and Girders: 600mm 600mm

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

NGL NGL

(MINIMUM DEPTH OF EXCAVATION)

(MINIMUM DEPTH OF EXCAVATION)

600mm
10mm dia @ 600mm O.C 10mm dia @ 600mm O.C
HORIZONTAL BARS HORIZONTAL BARS

800 mm
800 mm

10mm dia @ 600mm O.C 10mm dia @ 600mm O.C


VERTICAL BARS VERTICAL BARS

200 mm

200mm

100mm
10mm dia @ 300mm O.C
TRANSVERSE BARS 600mm COMPACTED SOIL FORMATION 600mm COMPACTED SOIL FORMATION
100mm 400mm

10mm dia @ 300mm O.C 10mm dia @ 300mm O.C, E.W


LONGITUDINAL BARS C CS - 1 DETAIL D SCHEDULE OF BEAM AND GIRDERS
S2 4 SCALE NTS f'c = 21 MPa ( 3,000 psi )

SECTION SECTION S2 4
SCALE fy = 276 MPa ( 40,000 psi )

B TYPICAL CHB WALL FOOTING DETAIL


S2 4 SCALE NTS
TOP OF ROOF BEAM

"Y"
FLOOR HEIGHT (H2)

SPLICE
3 SETS TIES

N.G.L. N.G.L. N.G.L.

FLOOR LINE
FLOOR BEAM

"Y"
3 SETS TIES

FLOOR HEIGHT (H1)


GROUND FINISHED

"Y"
FLOOR LINE
COMPACTED COMPACTED COMPACTED
SECTION GRAVEL BED SECTION GRAVEL BED SECTION GRAVEL BED SLAB ON GRADE

"Y"
"Y"
3 SETS TIES
BAR "S"
BAR "L"

BAR "L"
BAR "L"

BAR "S" BAR "S"


PLAN PLAN PLAN NOTES:
CORNER FOOTING CENTER FOOTING
1.) SPLICING SHOULD BE LOCATED
@ MIDHEIGHT OF COLUMN

2.) "Y"- CLOSER SPACING OF COLUMN TIES PER SET AS SPECIFIED


IN THE COLUMN SCHEDULE

A TYPICAL DETAIL OF FOOTINGS


S2 4 SCALE NTS

ELEVATION OF TIED COLUMN


(SHOWING TIE OR HOOP
SPACING)

TWO-STOREY RESIDENTIAL BUILDING WITH ROOF DECK 6


S2
4