Optimised JJ Peak Power system.

32 A
MCB
Solar Energy 3 phase AC bus
bar
L1

L2 Diesel Generator

L3

MPPT Charge Controller


+ - L1 N
3 Phase ATS

Inverter 100 A and 10 A MCBs


distribution Box

L1 L2 L3 N

L N
32 A
MCB 64 A
RCCB L1 L2 L3 N

L1

Main Bypass
Equipment Shelter Loads.
L3 N
Equipment Loads connected by 4, 16 A MCB. Each
1 Phase ATS L
for ADS-B, DVOR, DME and others (switch, etc).
N
Sockets, lights and AC
\

N
Distribution Box