COMPUTATIONS
COMPUTATIONS
Title: Traverse
Date of field work: January 6, 2023
Name of student: Ahmad, Rayhana A.
Aquino, Edsel Anne R.
Cabrera, Aubrey
Mohammad, Fatima Ayra
Salim, Fatima Rowda
Silal, Markhan
Villarosa, Kit C.
Yusop, Dhelkizarl
OLD DATA:
STA STA AZIMUTH DISTANCE REMARKS
OCC OBS
T1 295D 28’ 50” 26.629m Dhelkizarl Yusop
T2
T3
T4
T5
T7
Republic of the Philippines
Western Mindanao State University
College of Engineering
DEPARTMENT OF GEODETIC ENGINEERING
T7 98D 02’ 33” Rayhana Ahmad
T1
PLOTTING:
PROCEDURE:
CONCLUSION:
In conclusion, our group failed in doing the traverse survey. Everyone has the
chance to participate and perform during the activity but the error is big and because of
that our traverse survey did not close.
Republic of the Philippines
Western Mindanao State University
College of Engineering
DEPARTMENT OF GEODETIC ENGINEERING
DOCUMENTATION:
Republic of the Philippines
Western Mindanao State University
College of Engineering
DEPARTMENT OF GEODETIC ENGINEERING
Title: Traverse
Date of field work: January 30, 2023
Name of student: Ahmad, Rayhana A.
Aquino, Edsel Anne R.
Cabrera, Aubrey
Mohammad, Fatima Ayra
Salim, Fatima Rowda
Silal, Markhan
Villarosa, Kit C.
Yusop, Dhelkizarl
NEW DATA:
STA STA AZIMUTH DISTANCE REMARKS
OCC OBS
T1 217D 50’ 51” 76.960m Kit Villarosa
T2
T3
T4
T5
T1
Republic of the Philippines
Western Mindanao State University
College of Engineering
DEPARTMENT OF GEODETIC ENGINEERING
PLOTTING:
THE ERROR:
SOLVING:
T1-T2 127D 00’ 00” S 53D 00’ 00” E 55.67m -33.503 44.460
T2-T3 63D 25’ 47” N 63D 25’ 47” E 14.998m 6.709 13.414
T3-T4 126D 04’ 33” S 53D 55’ 27” E 37.537m -22.104 30.339
T4-T5 34D 44’ 52’’ N 34D 44’ 52” E 66.613m 54.734 37.967
T5-T6 304D 42’ 50’’ N 55D 17’ 10” W 96.202m 54.785 -79.079
T6-T1 217D 50’ 51” S 37D 50’ 51” W 76.960m -60.771 -47.220
=√ (−0.15 )2 + (−0.119 )2
1
Precision =
1831.47
PROCEDURE:
CONCLUSION:
In conclusion, our group were able to have a successful traverse survey wherein we
obtained a 0.19 error. Everyone has the chance to participate and perform during the
activity.
Republic of the Philippines
Western Mindanao State University
College of Engineering
DEPARTMENT OF GEODETIC ENGINEERING
SIDE SHOTS:
PLOTTING:
T4
Republic of the Philippines
Western Mindanao State University
College of Engineering
DEPARTMENT OF GEODETIC ENGINEERING
COMPASS RULE:
LINE AZIMUTH BEARING DISTANCE LATITUDE DEPARTURE
T1-T2 127D 00’ 00” S 53D 00’ 00” E 55.67m -33.503 44.460
T2-T3 63D 25’ 47” N 63D 25’ 47” E 14.998m 6.709 13.414
T3-T4 126D 04’ 33” S 53D 55’ 27” E 37.537m -22.104 30.339
T4-T5 34D 44’ 52’’ N 34D 44’ 52” E 66.613m 54.734 37.967
T5-T6 304D 42’ 50’’ N 55D 17’ 10” W 96.202m 54.826 -79.079
T6-T1 217D 50’ 51” S 37D 50’ 51” W 76.960m -60.771 -47.220
T1-T2 127D 00’ 00” S 53D 00’ 00” E 55.67m -33.47 44.48
T3-T4 126D 04’ 33” S 53D 55’ 27” E 37.537m -22.08 30.36
T4-T5 34D 44’ 52’’ N 34D 44’ 52” E 66.613m 54.76 37.98
T5-T6 304D 42’ 50’’ N 55D 17’ 10” W 96.202m 54.82 -79.04
T6-T1 217D 50’ 51” S 37D 50’ 51” W 76.960m -60.73 -47.19
DOCUMENTATION:
Republic of the Philippines
Western Mindanao State University
College of Engineering
DEPARTMENT OF GEODETIC ENGINEERING
Republic of the Philippines
Western Mindanao State University
College of Engineering
DEPARTMENT OF GEODETIC ENGINEERING