RA - 14 - For Waterproofing Membrane Application
RA - 14 - For Waterproofing Membrane Application
Project Abu Dhabi Future School Program - Phase 8, Package 1, Al Falah KG
NOTE:- This Risk Assessment is prepared in line with the METHOD STATEMENT for Waterproofing Membrane Application Rev. 00; and it covers
all activities described in this Method Statement.
1
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 014
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
2 Material Delivery Falling of Workers, 3 4 12 H Ensure that all the pickup driver AEGC 1 3 3 L OSHAD-SF–COP
on Site materials Drivers, company/suppliers are informed 1.0 – Hazardous
Collision of Property about the project safety requirements Materials - V 3.0
delivery damage, prior to the delivery of the materials.
flagman, public OSHAD-SF–COP
truck/pick up Ensure that all drivers and vehicle 2.0 – Personal
with men and comply with the safety requirements. Protective
materials. Ensure that the delivery truck is Equipment - V 3.0
Slips, Trips & inspected at the project gate by the
OSHAD-SF – COP
Page 1 of 2
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 014
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
Page 1 of 3
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 014
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
Page 1 of 4
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 014
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
heavy materials
Ensure that workers wear adequate
ppe while handling/unloading
materials.
Ensure that there is a certified First
Aider and adequate first aid facility
available on site.
3 Use of Hand Striking hand or Workers, 3 3 9 H Proper body position and safety glass AEGC 1 2 2 L OSHAD-SF –COP
Tools arms when using Personnel with side shields. 08.0 – General
hammer walking nearby Tool to be suitable for the purpose Workplace
Struck by flying intended and maintained in good Amenities – V 3.0
object metals working order. Tools to be inspected OSHAD-SF –COP
chips etc. regularly in accordance with 14.0 – Manual
Eye injuries manufacturer’s instructions. Handling and
Laceration when Hand gloves should be used when Ergonomics – V 3.0
using sharp tools using hand tools.
Defective tools All operatives to be given instructions OSHAD-SF– COP
in the safe use of hand tools as part 47.0 – Machine
Guarding Version
of their skill training. Tools which may
deteriorate are to be checked on a OSHAD-SF – CoP
regular basis and maintained or 36.0 – Plant and
replaced as necessary. Equipment – V 3.0
First Aider and First Aid items to be 3.0
made available on site.
OSHAD-SF –
Ensure that cables are routed safely
COP 35.0 –
and don’t pose a tripping hazard for
Portable Power
Page 1 of 5
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 014
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
OSHAD-SF –
Element 6 -
Emergency
Management
OSHAD-SF –
the workers/engineers etc COP 4.0 – First Aid
and Medical
Emergency
Treatment - V 3.0
4 Handling of Contact with Workers, Staff, 3 3 9 H MSDS for Waterproofing Membrane AEGC 1 3 L OSHAD-SF –
chemicals chemicals Visitors Application, to be made available and CoP 1.0 –
Waterproofing 3 Hazardous
the workers to be trained regarding
membrane the safe usage ( PPE, emergency Materials - Version
sheets ) preparedness ) 3.0.
Ensure that PPE( Respirators, Hand OSHAD-SF – CoP
Gloves, Safety glasses etc) is worn 2.0 – Personal
as mentioned in the MSDS while Protective
handling the chemicals. Equipment - Version
Ensure that Chemicals are stored in a 3.0
safe storage area as recommended in
OSHAD-SF – COP
the MSDS (Material Safety Data
Page 1 of 6
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 014
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
OSHAD-SF –
Element 2 - Risk
Sheet). Management
Ensure that the area is barricaded
while carrying out waterproofing OSHAD SF-
works. Element- 5 –
Training and
Ensure that certified first Aider and
awareness and
First Aid items and Eye Wash stations
competency
are available on site. Emergency
arrangements to be made available. OSHAD-SF –
Element 6 -
Emergency
Management
Unauthorized Workers, 2 4 8 H Ensure the area is barricaded and AEGC 1 2 L OSHAD-SF - CoP
access Public, Staff Suitable Signage is displayed to 22.0 – Barricading
Page 1 of 7
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 014
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
of Hazards –
Version 3.0
prevent unauthorized access is 2
OSHAD-SF –
prohibited. CoP 17.0 – Safety
Signage and
Signals – V 3.0
5 Torch Fire Workers 4 5 20 E Competent Person only to carry out AEGC 1 3 L OSHAD-SF–COP
Application Explosion the works 1.0 – Hazardous
( Using LPG Staff Near by H 3 Materials - V 3.0
Falling on Ensured that adequate Level of
Cylinders ) cylinders Property Supervision is available
OSHAD-SF–COP
Entanglement damage Only ADNOC Approved gas cylinders 2.0 – Personal
Slips Trips Falls & Regulators, hoses are used Protective
Lpg Hose Cylinders must be secured and stored Equipment - V 3.0
discharge failure to protect against collision or falling
Gas Leakage and not tampered with OSHAD-SF – COP
Manual Handling Cylinder valves to be free of dirt or 4.0 – First Aid and
grease and fully protected from Medical Emergency
Treatment - V 3.0
accidental or deliberate damage
Cylinders to be protected from direct OSHAD-SF –COP
sunlight 08.0 – General
Hot work permit to be issued for the Workplace
torch application. Amenities – V 3.0
Fire Extinguishers to be displayed in
OSHAD-SF –COP
the area
14.0 – Manual
No smoking in vicinity
Handling and
Connectors and valves and flexible
Page 1 of 8
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 014
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
OSHAD SF-
Element- 5 –
Page 1 of 9
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 014
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
Training &
awareness and
competency
OSHAD-SF–
Element 6 -
Emergency
Management
6 Disposal of Environment Environment 3 3 9 H All chemicals must be received, AEGC 1 3 3 L OSHAD-SF – CoP
waterproofing Concerns. stored and handled according to 54.0 – Waste
membrane in Noncompliance to prescribed procedures in the MSDS. Management –
normal trash Estidama , All workers will be trained how to Version – 3.0
Centre of waste segregate hazardous waste and its OSHAD-SF– CoP
management proper disposal as per the Main 1.0 – Hazardous
guidelines Contractors and Abu Dhabi Materials - V 3.0
Municipality guidelines.
TBT to be conducted and instructions OSHAD SF-
to be given to workers regarding the Element- 5 –
safe disposal of waste as mentioned Training and
awareness and
in the MSDS.
competency
Page 1 of 10
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 014
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
OSHAD-SF –
Element 6 -
Emergency
Management
7 Emergency Fire All personnel 3 4 12 H All personnel to be safety inducted. AEGC 1 3 3 OSHAD-SF –
situations Collision Train and inform all employees Codes of Practice
Electrocution regarding fire Emergency Evacuation CoP 17.0 – Safety
Failure to Plan. Signage and
Evacuation Initiate and maintain good Signals – Version
housekeeping 3.0
Ensure that all materials used in porta OSHAD-SF –
cabin construction are fire rated. Codes of Practice
Ensure that enough firefighting CoP 43.0 –
equipment are made available on Temporary
site. ( Fire Ex., Fire Hose Reel) Structures - Version
Ensure that fire alarm and Fire siren 3.0
are available on site and are fully
OSHAD-SF –
functional.
Codes of Practice
No smoking in non-designated areas. CoP 08.0 – General
Ensurre that smoke detectors are Workplace
installed inside all offices. Amenities – Version
Ensure that workers are trained- how 3.0
to fight fire, what to do in case of an
emergency OSHAD SF-
Element- 5 –
Page 1 of 11
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 014
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
I have read, understood and accept the conditions of this method statement & Risk Assessment.
Name of Job Supervisor/Foremen/Site Engineer: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Signature: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
All operatives involved with this job must sign below
I have read, understood and accept the conditions of this method statement and Risk Assessment.
Page 1 of 12
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 014
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
Sr. Emirates ID
Name Emp. No. Designation Date Signature Remarks
No. No
1
2
3
4
5
6
7
8
9
10
11
12
13
Page 1 of 13