These projects, which aligns with EEDC transformation roadmap will enable the organization provide better quality service to its customers and guarantee revenue assurance.
PROPOSED PROPOSED
FUNDING FUNDING
S/N PROJECT DESCRIPTION YEAR NERC CODE SOURCE S/N PROJECT DESCRIPTION YEAR NERC CODE SOURCE
1 Rehabilitation of FUT 11KV feeder and rerouting of the rural (Uratta) 2021 EE21DNC11006 CBN 39 "Supply of cables and conductors 2021 EE21LRATC007 CBN
segment for better load management i) 2,040mtrs, 500mm2 x 1core LV cable
ii) 2,100mtrs, 300mm2 x 1core LV cable
2 Construction of 17KM line from Ugwuaji Transmission to ESUTH 2021 EE21DNC33007 CBN iii) 660mtrs, 150mm2 x 4 core LV cable
iv) 1,156mtrs, 70mm2 x 4 core LV cable
3 Proposed 1.8km line transfer of Transtel from Ajali 33kv to Coca Cola 2021 EE21DNC33012 CBN v) 200mtrs, 500mm2 x 4 core LV cable
vi) 27,000mtrs, 150mm2 AAC
4 Construction of 10KM line Propose Akpuoga from Ugwuaji Transmission to 2021 EE21DNC33013 CBN vii) 25,500mtrs, 100mm2 AAC
Emene & 1km Extension of Emene Industrial 33kv feeder to Airport viii) 5,000mtrs, 25mm2 x 4 core ABC
ix) 90mtrs, 300mm2 x 1core 33kv xlpe cable"
5 Procurement of 33kv Outdoor breakers and 33kv line control panel at Atani 2021 EE21ESCIS002 CBN
road 2 x 15MVA Substation 40 Supply of 300mtrs of 150mm2 x 4c for & 6,000mtrs of 100mm2 Aluminum 2021 EE21LRATC008 CBN
conductor for stock replenishment
6 Procurement of 33kV Outdoor breakers and 33kv line control panel at 2021 EE21ESCIS003 CBN
Egbu 2 x 15MVA Substation 41 "Supply of distribution materials for replacement 2021 EE21LRATC009 CBN
of vandalized items;
7 Procurement of 11kv Indoor 7 Board panels for replacement of obsolete 2021 EE21ESCIS008 CBN
i) 24mtrs, 500mm2 x 1core LV cable
ones at Egbu TCN 2 x 15MVA 33/11KV Injection Substation
ii) 128mtrs, 300mm2 x 1core LV cable
8 2021 EE21ESCIS009 CBN iii) 53mtrs, 150mm2 x 4 core LV cable
Replacement of obsolete 11kv Indoor panels 7nos VCB indoor at Nibo
iv) 180mtrs, 70mm2 x 4 core LV cable
Injection Substation and 1No. Control and protection panel
v) 11,000mtrs, 150mm2 AAC"
9 Replacement of obsolete 11kv Indoor panels at Ugwunwasike Injection 2021 EE21ESCIS010 CBN
Substation & install 7.5MVA transformer 42 "Supply of cables and conductors for FY2021 Projects; 2021 EE21LRATC010 CBN
i) 1,000mtrs, 150mm2 x 4core LV cable
10 Feeder Automation (Phase-1)Provision and installations of 50 Nos 33kv & 2021 EE21ESCIS013 CBN ii) 500mtrs, 500mm2 x 1core LV cable
11kV Auto reclosers for sectionalizationing the Network to improve reliability iii) 500mtrs, 300mm2 x 1core LV cable
iv) 1,000mtrs, 70mm2 x 4 core LV cable
11 Additional 15MVA 33/11KV at Ochudo inj ss with extension of 2km 11KV Line 2021 EE21ISCIS008 CBN v) 70,050mtrs, 150mm2 AAC
vi) 49,000mtrs, 100mm2 AAC”
12 Additional 15MVA 33/11KV Kingsway Injection Substation with extension 2021 EE21ISCIS012 CBN
of 2km 11KV Line 43 Supply of 1,500drums of Transfomer oil 2021 EE21LRATC011 CBN
13 Addition of 15MVA, 33/11Kv Power TF at New Owerri Inj Sub, 11kV switch 2021 EE21ISCIS013 CBN 44 60 kms of 95Sq mm of HT ABC cable with connectors in urban areas to 2021 EE21LRATC012 CBN
gear and Construction of 9.5km 33kv line to New Owerri Injection Substation create new 11kV feeders or section where the right of way problems exist.
(Dualization of Z05 to New Owerri Injection Substation) - CBN Leg.
45 Fault/ Outages Management System (OMS) Development and Mobile 2021 EE21LRATC013 CBN
14 Uprating of 7.5MVA 33/11KV Injection Substation at Loma Linda Enugu State 2021 EE21ISCIS016 CBN Devices (outage detection-analyze-attend-close-confirm)- Mobile Devices
to deload Unec 11kv feeder and create Maryland 2, 11kv feeder and deload
46 Disaster Recovery Setup 2021 EE21LRATC014 CBN
existing Maryland feeder with 2nos 33kv Switchgear, 7nos VCB Indoor and
1No. Control and protection panel 47 Mobile Device Management System (MDMS) 2021 EE21LRATC015 CBN
15 Under 3-year road map, strategised to refurbish the transformers by 2021 EE21LRATC001 CBN 48 Procurement of service cable of size - 16 sq. mm x 2c of Quantity 503.5 kms 2021 EE21LRATC016 CBN
procuring 2 Nos of 15MVA Power transformers & 1 No. 7.5MVA transformers & 25 sq. mm x 4c -of Quantity of 628 kms - for metering and replacing the
damaged cables for loss reduction.
16 Procurement of 142 Nos 11kV Feeder Meters 2021 EE21NMNSM005 CBN
49 Procurement of Accuchek LT Meter Testing Kit for meter testing 2021 EE21LRATC017 CBN
17 Procurement of 100 Nos 33kV Feeder Meters 2021 EE21NMNSM006 CBN
50 Procurement of Accuchek HT Meter Testing Kit for meter testing 2021 EE21LRATC018 CBN
18 Procurement of 50 Nos 33kV & 11kV Interface Meters (Pole mounted) 2021 EE21NMNSM008 CBN
51 Procurement of 140 no's distribution transformers (Relief transformers) - 2023 EE21LRATC039 CBN
19 Procurement of 4000Nos of DSS Meters 2021 EE21NMNSM009 CBN Procurement done as against the requirement of relief transformers in 2
batches of 32 & 108 and unpaid for the want of CAPEX approval from NERC.
20 Procurement of 18Nos Digital Ratiometer (megger) 2021 EE21OSSIP001 CBN Cost is included in the relief Transformer projects given in this project list as
21 Procurement of 4Nos Transformer Oil Tester 2021 EE21OSSIP002 CBN relief DSS.
23 Procurement of 50Nos Over Current Relay 2021 EE21OSSIP004 CBN 53 Rehabilitation of GRA 11KV Feeder 2021 EE21DNR11016 CBN
24 Proposed dedicated 11KV line for Shoprite and some MD customers 2021 EE21DNC11013 CBN 54 Rehabilitation of GRA 11KV Feeder Rehabilitation 2021 EE21DNR11017 CBN
in Umuahia 55 2021 EE21SSCIS019 CBN
Construction of Proposed 1 x 15MVA 33/11kV Industrial Layout
Injection Substation with extension of 2 km 11kV Line from proposed
25 Relocation of LT pole on world bank 11KV 2021 EE21DNC11014 CBN Akpuoga 33kV ex-Ugwuaji transmission
26 Construction of 2x1KM, 11KV Feeders for Added New Owerri 15MVA 2021 EE21DNC11015 CBN 56 Additional 15MVA 33/11KV Nike Lake Injection Substation with extension 2021 EE21SSCIS020 CBN
Injection Substation of 2km 11KV Line.
27 Construction of 5 km 33kv O/H line from Nibo TCN Station to Enugu Ukwu 2021 EE21DNC33022 CBN 57 Provision for reconstruction of Injection substation gantry for Utilization of 2021 EE21SSCIS021 CBN
Injection Substation - (Additional supply source) Umunya 33kv feeder as additional source to Ugwunwasike 1 X 15MVA
33/11KV Injection substation
28 Creation of Army Barracks 2, 33kv feeder BY 4.42km dual Circuit 2021 EE21DNC33023 CBN
reconstruction of a section of Army Barracks 33kv feeder for additional 58 Proposed IYIAGU 15MVA 33/11KV Injection substation required for ring 2021 EE21SSCIS022 CBN
supply source to Army Barracks 1 & 2 Injection Substations network involving Enugu Agidi and Udoka 11kv feeders
29 Creation of Awada 3, 33kv feeder for provision of addition primary supply 2021 EE21DNC33024 CBN 59 Upgradation of 2.5MVA to 7.5MVA Rufus OBI Unmanned Injection using 2021 EE21SSCIS023 CBN
source to Awada 2, Injection Substation 2Nos 11KV Auto-Recloser and 1 Nos 33KV Auto Reclosers
30 1KM Extension of Proposed Enugwu Ukwu 33kv feeder to proposed 2021 EE21DNC33025 CBN 60 Procurement of 194Nos distribution Transformers of various capacities 2021 EE21SSCIS024 CBN
Iyiagu 1 x 15MVA Injection Substation to replace failed DSS transformers in the network.
31 Rehabilitation and reinforcement of 0.415KV network in Abia 2021 EE21DNC40001 CBN 61 Construction of 33Nos 300KVA 11/0.415KV relief substations in Awka district 2021 EE21SSCIS025 CBN
32 Proposed IBB Phase 1, 1 x 300kva 11/0.415kv relief substation, 2021 EE21DNC40002 CBN 62 Construction of 5Nos 300KVA 11/0.415KV & 5Nos 300KVA 33/0.415KV 2021 EE21SSCIS026 CBN
Umuahia district relief substations in Ekwulobia district
33 N-1 Network Planning through network studies through GIS based System 2021 EE21OSSIP005 CBN 63 Construction of 10Nos 300KVA 11/0.415KV & 1No. 300KVA 33/0.415KV 2021 EE21SSCIS027 CBN
Planning Software Tools relief substations and completion of suspended 2Nos 500KVA 11/0.415KV
relief projects in Onitsha district
34 Revival of Contact Center with a Toll-Free Vanity Number and Call Analytics 2021 EE21OSSIP006 CBN
64 Construction of 5Nos 300KVA 11/0.415KV relief Substations in Nsukka district 2021 EE21SSCIS028 CBN
35 Android based POS Payment Devices 2021 EE21OSSIP007 CBN
65 Construction of 13Nos 300KVA 11/0.415KV relief substations in Ogui district 2021 EE21SSCIS029 CBN
36 ICT Network Hardware Revamping for 18 District Offices (router, switches) 2021 EE21OSSIP008 CBN 66 Construction of 4Nos 300KVA 11/0.415KV & 1No. 300KVA 33/0.415KV relief 2021 EE21SSCIS030 CBN
substations and completion of 1No. 300KVA 11/0.415KV suspended relief
37 Provision for reconstruction of Injection substation gantry for Utilization 2021 EE21ISCIS026 CBN project in New Owerri district
of proposed Fegge 33kv feeder as additional source to Atani 1 X 15MVA
33/11KV Injection Substation 67 Construction of 10Nos 300KVA 11/0.415KV relief Substations and completion 2021 EE21SSCIS031 CBN
of suspended 1No. 500KVA 11/0.415KV relief project at Amakohia New Layout
38 Reconstruction of Injection substation gantry for utilization of Proposed 2021 EE21ISCIS027 CBN in Owerri district
Fegge 33kv feeder as additional source to Fegge 1 X 15&7.5MVA 33/11KV
Injection Substation
PROPOSED PROPOSED
FUNDING FUNDING
S/N PROJECT DESCRIPTION YEAR NERC CODE SOURCE S/N PROJECT DESCRIPTION YEAR NERC CODE SOURCE
68 Construction of 10Nos 300KVA 11/0.415KV relief substations (Ezewuzie, 2021 EE21SSCIS032 CBN 107 Ring Network 11KV line interconnection with 11KV RMU of GRA and 2023 EE21DNC11033 PPI
Women Affairs road, Kabe College Road, Festus Avenue, St. Joseph de Worker AMACARA 11KV feeders Umuahia District
church, Sir Ify Onuma str., Dan Maduka, Omuko Street, Amikwo and
O.C Gambia Street), Awka district 108 Installation of 1x15MVA 33/11KV Obohia Injection Substation 2023 EE21DNC11034 PPI
69 Construction of 3Nos 300KVA 11/0.415KV relief substation (Ama Alpho2, 2021 EE21SSCIS033 CBN 109 Construction of a 11KV line for segregation with Auto-Recloser for 2023 EE21DNC11035 PPI
Nwakwazu 2 Uga & Mkwo Market Uga 2),Ekwulobia district Opobo 11KV Aba District
70 Construction of 11Nos 300KVA 11/0.415KV relief substations (Ekeh Eziora, 2021 EE21SSCIS034 CBN 110 Construction of 33kV, 2.5KM line on single line tower from Propose 9th Mile 2022 EE21DNC33026 PPI
Ntu Okija road Ugwucheleku, St. Matthew Anglican, Ugwuorie, Four Corner, transmission to Nigerian breweries
Onwa Oba, Uruagu Oba, 8th Miles, Isi Umunakwa, Nwafor and St. Monica),
Nnewi district 111 Construction of 33kV, 2.5KM line on single line tower from Propose 9th Mile 2022 EE21DNC33027 PPI
transmission to 7up Bottling company & 33/11kV 2.5MVA transformer
71 Construction of 4Nos 300KVA 11/0.415KV relief substation (Ikoro United, 2021 EE21SSCIS035 CBN
Udeaja Furniture, Obibuenyi and Gbalie Str.), Ogbaru district 112 Construction of 5KM line on single tower for Propose rehabilitation of 2022 EE21DNC33028 PPI
Ochudo 33kV from Abakaliki Transmission
72 Construction of 7Nos 300KVA 11/0.415KV relief substation (Uruegbe Umuoji, 2021 EE21SSCIS036 CBN
Monastry Road, Achalla Uno, Umusiome Nkpor, Nkwo Obosi, Amafor Nkpor 113 Upgradation of 7.5MVA 33/11KV to 15MVA at Nsukka main with extension 2022 EE21DNC33029 PPI
Uno and Isingwu Nkpor), Ogidi district of 2km 11KV Line and move 7.5MVA to UNN Injection Substation 2km line
section to make Wilson dedicated MD feeder
73 Construction of 10Nos 300KVA 11/0.415KV relief substations (Water works, 2021 EE21SSCIS037 CBN
Lawrence Onor, Eze Nwuba, Quarry 1, Aniekwena, Achi, Ogbaga Road & 114 Additional 7.5MVA 33/11KV at UNN Injection Substation (7.5MVA recovered 2022 EE21DNC33030 PPI
Udensi, Awolowo, Holy Ghost-Mouneke & Ebonyi Voice), Abakaliki district from Nsukka Main) with 7 board 11kv breakers
74 Construction of 9Nos 300KVA 11/0.415KV relief substations (Ifo Layout, 2021 EE21SSCIS038 CBN 115 Construction of 0.6km 33kv O/H line to Umudim Industrial hub to separate 2022 EE21DNC33031 PPI
Ukwu Mango, Ugbonebedum, J.C Ugwu, Obije Ifenze, Nnamchi, Asadu 2, connection to Umudim segment of Nnewi- Industrial 33kv feeder.
Old Alulu & Nkpologwu), Abakpa district
116 Construction of 0.8km 33kv O/H line to Amichi 7.5MVA Injection Substation 2022 EE21DNC33032 PPI
75 Construction of 6nos 300KVA 11/0.415KV relief substations (Water Works 2021 EE21SSCIS039 CBN
along Awkuzu, Merken, Eziokwe,Unubi Achara Layout, Evaristus Catholic 117 Construction of 1.1km 33kv O/H Line to create Awka-Etiti 33kv feeder and 2022 EE21DNC33033 PPI
Church, Liberation Mbaeze Str.), Awkunanaw district break connection to Nnewi 33kv feeder.
76 Construction of 5Nos 300KVA 11/0.415KV relief substations (Odenigbo, 2021 EE21SSCIS040 CBN 118 Construction of 2.25km 33kv O/H line to Akwudo 15MVA & 7.5MVA Injection 2022 EE21DNC33034 PPI
Bob Remus, New Anglican Road, Milipat & John Attama), Nsukka district Substation - (Additional supply source)
77 Construction of 6Nos 300KVA 11/0.415KV relief substations (Amato Uzoubi, 2021 EE21SSCIS041 CBN
119 Construction of 5km 33kv O/H line for an Additional supply source to 2022 EE21DNC33035 PPI
Claret, Ebikoro Umueje, Rectors', Town 2 Fed. Housing Estate and Urban Sec.
Sch. Off St. John Cath. Church), New Owerri district Ekwulobia district
120 Construction of 6km 33kv O/H line to Ukpor (NIPP) 1 x 7.5MVA 2022 EE21DNC33036 PPI
78 Construction of 10Nos 300KVA 11/0.415KV relief substations (Apuche, 2021 EE21SSCIS042 CBN
Injection Substation
EEDC Royce Road, Egbukole, Engr. Obi , Geotina, Ihem Davies, Imerienwe,
Ishiuzo, JDP and Old Winners), Owerri district 121 Creation of 11.34KM Nkpor 33kv feeder via dual circuit reconstruction of 2022 EE21DNC33037 PPI
79 Procurement of 1-Phase Meters of Quantity 895,133Nos 2021 EE21NMNSM010 NMMP & Niccus 33kv and extension of same to Umuoji 33kv feeder for additional
Others supply source.
80 Procurement of 3-Phase Meter of Quantity 309,560Nos 2021 EE21NMNSM011 NMMP &
Others 122 1.52KM Extension of Agulu 33kv feeder to Nri 1 x 7.5MVA 33/11kv 2022 EE21DNC33038 PPI
81 Proposed Nkwelle 1 X 15MVA 33/11K Injection substation required to 2022 EE21DNC11010 PPI Injection substation as additional supply source
deload Nkwelle 11kv feeder and provide facility for a ring network
123 7.43KM Extension of Agulu 33kv feeder to Umunze 7.5MVA 2022 EE21DNC33039 PPI
82 Procurement of 11kv Indoor 7 Board panels for replacement of obsolete 2022 EE21ESCIS005 PPI Injection Substation
one at Atani road 2 x 15MVA 33/11KV Injection Substation
124 Proposed COMPREHENSIVE 2 X 15MVA 33/11KV Injection substation 2022 EE21DNC33040 PPI
83 Construction of Commissioners Quarters 1X15MVA 33/11KV Injection 2022 EE21ISCIS001 PPI required for ring network involving five 11kv feeders (Okpoko, Awada,
Substation with 3Nos 11KV feeder to deload Azikwe and World Bank . Ezeiweka, Nwaziki and Woliwo)
84 Construction of Unmanned 1 x 7.5MVA 33/11KV Elim Injection substation 2022 EE21ISCIS003 PPI 125 Construction of CBN 33KV feeder from Afara injection to fed commissioner 2022 EE21DNC33041 PPI
with extension of 2no 11kv 2km Line (source feeder from New Haven TCN). quarters injection.
33kV RMUs for Line Loads.
85 2022 EE21ISCIS004 PPI 126 Ring network inter connection in Urban area of 33KV lines of Afara and 2022 EE21DNC33042 PPI
Construction of 15MVA, 33/11KV FUTO Junction Injection Substation
Ubakala with 33KV RMU
86 Construction of Proposed 15MVA 33/11KV ESUTH Injection substation with 2022 EE21ISCIS006 PPI 127 Ring Network Inter connection in Urban area of Afara I 33KV and proposed 2022 EE21DNC33043 PPI
extension of 2km 11KV Line from Ugwuaji Afara II 33KV feeder using 33KV auto recloser that will be remotely operated
87 Commissioning of the 2nd 15MVA Transformer at Umudike Injection 2022 EE21ISCIS007 PPI
128 Ring Network inter connection in Urban area of 33KV lines of proposed 2022 EE21DNC33044 PPI
Substation and rehabilitation of its switchyard
CBN 33KV with Afara using 1 auto recloser as circuit breaker only
88 Construction of 2x15MVA 33/11KV Injection Substation at existing Ogbor Hill 2023 EE21ISCIS025 PPI
1X7.5MVA Injection substation with construction of 2Nos 11KV feeders 129 Relocation of 0.45KM 33KV Afara line 33 Injection Substation line to the 2022 EE21DNC33045 PPI
old Abriba tower along Mission Hills .
89 Revamping of AMI System and MDMS and Analysis - (Advanced Metering 2022 EE21ITAMI001 PPI
infrastruture for integrated smart meter communication/monitoring /data 130 Construction of 0.25KM 33KV Overhead Lines from Ahiara Junction Mbaise 2022 EE21DNC33046 PPI
management system that enable two way communication between utility 33KV T Off to Ahiara 15MVA 33/11KV Injection Substation
and customer)
131 Construction of 12.55km Agulu 2 33kv feeder 2022 EE21DNC33047 PPI
90 Implementation of 11kV feeders ring Network in Enugu involving 2 feeders 2022 EE21DNC11016 PPI
with 2-Way Ring Main Unit and Breaker Switch on (Hilltop 11kV & Okwe 11KV) 132 Complete Rehabilitation of 5KM on MPU 33kV leg to radiate from 2023 EE21DNC33048 PPI
Nnewe 1 X 60MVA Transmission Station
91 Proposed Nkpor Junction 2 X 7.5MVA Injection substation required for ring 2022 EE21DNC11017 PPI
network involving four 11kv feeders (Minaj 1, Onitsha GRA, Minaj 2 & Mgbuka) 133 Complete Rehabilitation of 5KM on Awgu leg 33kV to radiate from 2023 EE21DNC33049 PPI
Nnewe 1 X 60MVA Transmission Station
92 Provision for implementation of 11kv feeders' interconnection for a ring 2022 EE21DNC11018 PPI
network utilizing Ring Main Units in Awka districts including 14 feeders and 134 Construction of 5KM, 33kV new feeder line from Amasiri TCN to AFIKPO 2023 EE21DNC33050 PPI
required 11kv line extensions INJ NIPP SS.
93 Provision for implementation of 11kv feeders' interconnection for a ring 2022 EE21DNC11019 PPI 135 Construction of 4.5KM line section from Amasiri for connecting propose 2023 EE21DNC33051 PPI
network using RMUs in Nnewi districts for 5Nos feeders and line extensions Afikpo II 33kV NIPP SS Amasiri (2 x 60MVA)
94 Provision for implementation of 11kv feeders' interconnection for a ring 2022 EE21DNC11020 PPI 136 Construction of 1KM line on Pole structure for propose Edda Amasiri 33kV 2023 EE21DNC33052 PPI
network utilizing RMUs in Ogbaru districts for 11Nos feeders and line from Amasiri 2 x 60MVA Transmission
extensions
137 Construction 23.1KM of Proposed Isuochi 33kv feeder for Okigwe 2 x 60MVA 2023 EE21DNC33053 PPI
95 Provision for implementation of 11kv feeders' interconnection for a ring 2022 EE21DNC11021 PPI TCN Station to Isuochi 7.5MVA Inj. SS
network in Ogidi district with RMUs for 11Nos feeders in addition to 11kv
line extensions 138 1.8KM Extension of Nnewi 33kv feeder to Adazi-Ani 7.5MVA Inj. SS 2023 EE21DNC33054 PPI
96 Provision for implementation of 11kv feeders' interconnection for a ring 2022 EE21DNC11022 PPI 139 Construction of Abam 33KV feeder with rehabilitation of sections of 2023 EE21DNC33055 PPI
network with RMUs in Onitsha districts involving 10 Nos 11kv feeders with Arochukwu 33KV
required line extensions 140 Construction of Ihechiowa 33KV feeder with rehabilitation of sections of 2023 EE21DNC33056 PPI
97 Installation of 3Nos 11KV Autoreclosers at designated location on 3Nos 2022 EE21DNC11023 PPI Arochukwu 33KV
Feeders in Awka district 141 Construction of Obohia 33kV line from proposed Alaoji TCN 2023 EE21DNC33057 PPI
98 Construction of Afara II Single Circuit 33KV line on a tower 2022 EE21DNC11024 PPI 142 Construction of Ohanku 33kV line from proposed Alaoji TCN 2023 EE21DNC33058 PPI
99 Construction of a 11KV line for interconnection with 1 RMU of Township 2022 EE21DNC11025 PPI 143 Construction of Ukwa 2, 33kKV feeder from Alaoji TCN 2023 EE21DNC33059 PPI
and GRA Road 11KV Umuahia District
144 Construction of Pipe line Road 33kKV feeder from Alaoji TCN 2023 EE21DNC33060 PPI
100 Ring Network 11KV line interconnection with 1 RMU of World Bank and 2022 EE21DNC11026 PPI
Azikwe 11KV Umuahia District 145 Construction of 42km 33kv O/H line from Okigwe TCN Station to 2023 EE21DNC33061 PPI
Orlu main (7.5MVA & 15MVA)
101 Ring Network 11KV line interconnection with 1 RMU of Ndume and 2022 EE21DNC11027 PPI
Township 11KV feeders Umuahia District 146 Construction of 15km 33kv O/H line to Uturu 5MVA & Sectionalizer 2023 EE21DNC33062 PPI
at Injection sub
102 Construction of a line extension for sectionalization of Agudiegwu T-Off on 2022 EE21DNC11028 PPI
Omoba 11KV Aba District 147 Construction of 7.5km 33kv O/H line to Okigwe 15MVA,33/11Kv 2023 EE21DNC33063 PPI
Injection Substation
103 Construction of a line extension for sectionalization of Jesus is lord School 2022 EE21DNC11029 PPI
on Omoba 11KV Aba District 148 Construction of 33km 33kv O/H line from Okigwe 2x40MVA TCN to 2023 EE21DNC33064 PPI
Anara Switch yard
104 Construction of a 11KV line for segregation with Auto-Recloser on GRA 11KV 2022 EE21DNC11030 PPI
at El-Dorado Hotel 149 Construction of 0.2KM, 33KV Overhead Lines from 2x60MVA Orlu TCN 2023 EE21DNC33065 PPI
132/33KV as a primary source to Orlu Main (15MVA & 7.5MVA)Injection Sub
105 Construction of 2x500Mtr, 11KV Feeders for FUTO Junction 15MVA 2022 EE21DNC11031 PPI
150 Construction of 0.5KM, 33KV Overhead Lines from 2x60MVA 132/33KV Orlu 2023 EE21DNC33066 PPI
Injection Substation
to back feed Orlu 33KV Line (join existing 33KV Line)
106 Ring Network 11KV line interconnection in urban area with 1 RMU of 2023 EE21DNC11032 PPI
World Bank and Aba Road feeders in Umuahia 151 Construction of 0.5KM, 33KV Overhead Lines from 2x60MVA 132/33KV Orlu 2023 EE21DNC33067 PPI
as a primary source of supply to Akaka 15MVA & 7.5MVA (join existing line)
PROPOSED PROPOSED
FUNDING FUNDING
S/N PROJECT DESCRIPTION YEAR NERC CODE SOURCE S/N PROJECT DESCRIPTION YEAR NERC CODE SOURCE
152 Construction of 17KM, 33KV Overhead Lines from 2x60MVA 132/33KV Orlu as 2023 EE21DNC33068 PPI 201 Installation of breakerat Abriba substation 2023 EE21LRATC038 PPI
a primary source of supply to Awo Idemili 2x7.5MVA & to deload Oguta 33KV
202 STS Vending System Upgrade 2022 EE21NMNSM012 PPI
153 Construction of 7.5KM, 33KV Overhead Lines from 2x60MVA 132/33KV Orlu 2023 EE21DNC33069 PPI
to deload Orlu 33KV via Nkwere & provide double source to Anara Switch Yard 203 Procurement of 11kV HV MD Meters of 93 Nos for New customers & 2022 EE21NMNSM013 PPI
replacement of tampered and burnt meters
154 Construction of 11KM 33KV Overhead Lines to Mbutu 15MVA, from Aboh 2023 EE21DNC33070 PPI
Mbaise TCN 204 Procurement 33kV HV MD Meters of 139Nos for New customers & 2022 EE21NMNSM014 PPI
155 Construction of 4KM 33KV Overhead Lines to Ovuru and Okpofe from 2023 EE21DNC33071 PPI replacement of tampered and burnt meters
Aboh Mbaise TCN
205 Procurement of 2,524 Nos of LV MD Meters for New customers & 2022 EE21NMNSM015 PPI
156 Construction of 23 km, 33KV Line to deload Airport 33KV at Ulakwo/Aba 2023 EE21DNC33072 PPI replacement of tampered and burnt meters
Owerri road from Aboh Mbaise TCN
206 Procurement of CTs for the Replacement CT for LVMD meters 2022 EE21NMNSM016 PPI
157 Construction of 33KV feeder of 17km Overhead Line to sam Mbakwe 2023 EE21DNC33073 PPI
Airport from Aboh Mbaise TCN 207 Procurement of CTs for the Replacement CT for HVMD meters 2022 EE21NMNSM017 PPI
158 Rehabilitation of 0.415KV Overhead Line across OMOBA 11KV NETWORK 2022 EE21DNC40003 PPI
208 Rehabilitation and reinforcement of 11KV network in Abia 2022 EE21DNR11018 PPI
159 100kms of 95Sq mm of 0.415KV ABC cable with connectors in theft Prone & 2022 EE21DNC40004 PPI
congested Urban areas 209 Rehabilitation of Naze 11KV feeder 2022 EE21DNR11019 PPI
160 GIS Platform for implementation of Enterprise GIS applications & Integration 2022 EE21OSSIP007 PPI 210 Rehabilitation of Water works 11kv feeder, Ogbaru district 2022 EE21DNR11020 PPI
161 Identity Management System 2022 EE21OSSIP009 PPI 211 Rehabilitation of Industrial, Azuiyiokwu2 and Azuiyiokwu 1, 11kv feeders, 2022 EE21DNR11021 PPI
162 Software Testing Tools- VAPT tool for vulnerability test 2022 EE21OSSIP010 PPI Abakaliki district
163 Enterprise Integration- Integration of ERP with other Business Systems 2023 EE21OSSIP011 PPI 212 Rehabilitation of Amaigbo, Ihioma, Owerri Rd, Orlu township and 2022 EE21DNR11022 PPI
viz- Call Center, Vending System, GIS, OMS, SCADA, DMS etc.. Umuaka 11kv feeders,Orlu district
164 Business Analytics 2023 EE21OSSIP012 PPI 213 Replacement of Obsolete 11kv Indoor panels at Thinkers' Corner Injection 2022 EE21DNR11023 PPI
Substation with 7nos VCB Indoor and 1no. Control and protection panel
165 Security Operation Center (SOC) Setup- SIEM, NAC , High end desktops 2023 EE21OSSIP013 PPI
166 Implementation of 36No 33kV for ring Network in Enugu involving 2 feeders 2022 EE21ISCIS028 PPI 214 Rehabilitation of Azikiwe, Ndume, Olokoro2, Amachara, Old Umuahia, 2022 EE21DNR11024 PPI
with RMU 2No breakers(12 fdrs total) Umudike and World bank 11kv feeders, Umuahia district
167 Construction of 27Nos 300KVA 11/0.415KV & 2Nos 300KVA 33/0.415KV 2022 EE21ISCIS029 PPI 215 Rehabilitation of Okpuno, Enugu Agidi, Nibo, Ifite,Unizik, Amansea, 2022 EE21DNR11025 PPI
relief substations in Umuahia district Industrial, Ukpor and Nimo 11kv feeders, Awka district
168 Construction of 4Nos 300KVA 11/0.415KV & 17Nos 300KVA 33/0.415KV 2022 EE21ISCIS030 PPI 216 Rehabilitation of Nnewichi,Otolo, Mbanagu, Uruagu, Nkwoedo,Ibollo, 2022 EE21DNR11026 PPI
relief substations in Nnewi district Umuofor and Ubanu 11kv feeders, Nnewi district
169 Construction of14Nos 300KVA 11/0.415KV & 2Nos 300KVA 33/0.415KV 2022 EE21ISCIS031 PPI
217 Rehabilitation of Minaj1, Ogidi, Tollgate, Nkpor, Ezeiweka, Nwaziki, Avenco 2022 EE21DNR11027 PPI
relief substations and completion of 2Nos 300KVA 11/0.415KV suspended
and Ugwuagba/Mgbemena 11kv feeders, Ogidi district
relief projects in Ogbaru district
170 Construction of 24Nos 300KVA 11/0.415KV & 13Nos 300KVA 33/0.415KV 2022 EE21ISCIS032 PPI 218 Rehabilitation of Nsugbe, Housing, Iweka, Bida, Market, GRA and 2022 EE21DNR11028 PPI
relief substations and completion of 2Nos 500KVA 11/0.415KV relief Mgbuka 11kv feeders, Onitsha district
substation projects in Ogidi district 219 2022 EE21DNR11029 PPI
Rehabilitation of Phase 6, Emene 1, Nowas and 9th Mile Industrial 11kv
171 Construction of 10Nos 300KVA 11/0.415KV & 3Nos 300KVA 33/0.45KV 2022 EE21ISCIS033 PPI feeders, Abakpa district
relief substations and completion of suspended 2Nos 500KVA 33/0.415KV
relief projects in Abakaliki district 220 Rehabilitation of Unec and Gariki 11kv feeders, Awkunanaw district 2022 EE21DNR11030 PPI
172 Construction of 10Nos 300KVA 11/0.415KV & 1No 300KVA 33/0.415KV 2022 EE21ISCIS034 PPI 221 Rehabilitation of Aku, Onuiyi, Ugwuoye, Campus and Township 11kv feeders, 2022 EE21DNR11031 PPI
relief substations and completion of 2Nos suspended 500KVA 11/0,415KV Nsukka district
relief projects in Abakpa district 222 Rehabilitation of Coal Camp, Golf, Oji Township, Onitsha Rd., Power house 2022 EE21DNR11032 PPI
173 Construction of 14Nos 300KVA 11/0.415KV & relief substations in 2022 EE21ISCIS035 PPI and Chime 11kv feeders, Ogui district
Awkunanaw district 223 Rehabilitation of World bank 11kv feeder, New Owerri district 2022 EE21DNR11033 PPI
174 Construction of 5Nos 300KVA 11/0.415KV & 12Nos 300KVA 33/0.415KV 2022 EE21ISCIS036 PPI 224 Rehabilitation of Naze, Emekuku, Mbieri, Township and 2022 EE21DNR11034 PPI
relief substations in Orlu district New Owerri 11kv feeders, Owerri district
175 Construction of 3Nos 300kva 11/0.415kv relief substation (Bende, Igbo and 2022 EE21ISCIS037 PPI 225 Rehabilitation and reinforcement of 33KV network in Abia 2022 EE21DNR33013 PPI
Igbere substations),Umuahia district
226 Rehabilitation of Ntigha 33kv feeder, Umuahia district 2022 EE21DNR33014 PPI
176 Construction of 8nos 300kva 11/0.415kv relief substation (St. Theresa, 2022 EE21ISCIS038 PPI
Ndubuisi, Oyiolu, 2nd Gate, Osuma-Ogbuli, Pano 1, Ogbomanu, Flanigan), 227 Rehabilitation of Neni, Agulu & Orumba 33kv feeders, Ekwulobia district 2022 EE21DNR33015 PPI
Onitsha district 228 Rehabilitation of Nnewi, Nnewi Industrial & Obosi 33kv feeders, Nnewi district 2022 EE21DNR33016 PPI
177 Construction of 9nos 300kva 11/0.415kv relief substations (Mike Omeje 2022 EE21ISCIS039 PPI
229 Rehabilitation of Niccus, Aguleri, Umunya & Idemili 33kv feeders, Ogidi district 2022 EE21DNR33017 PPI
Avenue Golf Estate, Nnolim Nnaji Avenue Golf Estate, Onuasata Round about,
Calvary Str., Ezekwesili, Unity Estate Maryland, Monarch, Loma Linda Maryland 230 Rehabilitation of Yahe and Itigidi 33kv feeders, Abakaliki district 2022 EE21DNR33018 PPI
& Amalu Str. Off Nza Str.), Ogui district
231 Rehabilitation of Ibagwa, Orba and Ehamufu 33kv feeders, Nsukka district 2022 EE21DNR33019 PPI
178 Construction of 5nos 300kva 11/0.415kv relief substations (St. Joseph Cath. 2022 EE21ISCIS040 PPI
Church, Amaigbo, St. Catherine Nkwelle, Owerre Nkworji Amaigbo, Okwu 232 Regional Power Control Center (PSCC) - Implement integrated SCADA along 2023 EE21ITAMI002 PPI
substation Amaigbo and Okoromeje relief SS Orlu), Orlu district with DMS , OMS , ICCP including functionalities of area load dispatch and
facilities like- power supply, air conditioning etc.
179 Injection Substation Automation (Without Switchgears) 2022 EE21ISCIS041 PPI 233 2022 EE21SSCIS043 PPI
Proposed WATER WORKS 1 X 15MVA 33/11KV Injection substation required
180 Upgradation of 1 x 7.5MVA to 15MVA 33/11KV at New Haven inj ss with 2023 EE21ISCIS042 PPI for ring network involving Atani Industrial and Iyiowa 11kv feeders
extension of 2km 11KV Line
234 Upgradation of 1x15MVA to 1x30MVA 33/11KV Power Station Injection 2022 EE21SSCIS044 PPI
181 Construction of a dedicated Umuode ISS Line from Aba Control TCN 2023 EE21ISCIS043 PPI Sub Station with 2Nos 11KV feeder
182 3No Auto recloser for line segmentation ugwuogo ajali and agbani 33kV 2022 EE21LRATC019 PPI 235 Construction of 15MVA, 33/11KV Naze Injection Substation 2022 EE21SSCIS045 PPI
183 Provision and installation of 300 Nos fault locators in 20 lengthy Feeders 2022 EE21LRATC020 PPI 236 Construction of 3KM line from Naze 15MVA Injection Substation 2022 EE21SSCIS046 PPI
in the network. 237 Construction of 1KM line from Naze 15MVA Injection Substation 2022 EE21SSCIS047 PPI
184 Feeder Automation (Phase2) - Remote operated 33kV, 11kV Sectionalizer/ 2022 EE21LRATC021 PPI 238 Construction of IMSU 7.5MVA, 33/11KV Injection Substation 2022 EE21SSCIS048 PPI
Auto Reclosers (With Switchgears)
239 Procurement of 11kv Indoor 7 Board panels for replacement of obsolete 2022 EE21SSCIS049 PPI
185 Procurement and Installation of Cradle guard across major road crossing, 2022 EE21LRATC022 PPI ones at Awada 2, 2 x 15MVA 33/11K Injection Substation
HV line-line crossing, markets and identified unsafe locations in EEDC area
240 Provision for construction of additional 102Nos LV circuits (13 spans with 2022 EE21SSCIS050 PPI
186 Provide Cost for standardization, safety and security of existing distribution 2022 EE21LRATC023 PPI upriser cable) for overloaded LT lines
sub stations in Urban areas
241 Proposed Obinze 15MVA, 33/11KV Injection Substation from Oguta CBN Leg 2022 EE21SSCIS051 PPI
187 Provide Cost for standardization of existing Injection sub station 2022 EE21LRATC024 PPI (New Owerri 33KV Feeder)
188 Installation of RMU between Ikenegbu 11KV & GRA 11KV Feeders 2022 EE21LRATC025 PPI 242 Replacement of aged one(1) 15MVA Power transformer at Umuode 2022 EE21SSCIS052 PPI
2x15MVA injection substation at Aba, Abia state.
189 Provision of separate breaker for Abiriba line from Nkata Alike 2022 EE21LRATC026 PPI
(Turn - in, Turn - out) 243 Construction of Proposed 1 x 15MVA 33/11KV UNEC inj ss with extension 2023 EE21SSCIS053 PPI
of 2km 11KV Line to feed from Govt House 33KV from (th mile TCN with Turn
190 Installation of capacitor bank for 28nos 33kv lengthy feeders 2022 EE21LRATC027 PPI In turn Out to feed the rural leg (OPTIONAL - Depending on the existing
191 Field force automation, Maint Planning, Capture Site Works and 2022 EE21LRATC028 PPI project proposed by CBN)
Material Consumption 244 Upgrade existing 1X7.5MVA to 15MVA 33/11KV at Amechi Uwani Injection 2023 EE21SSCIS054 PPI
192 Commercial Management System i.e. integration of the Revenue 2022 EE21LRATC029 PPI Substation with extension of 2km 11KV Line
Cycle Management processes from Metering-Billing-Collection and 245 4.1KM Extension of Proposed Ekwulobia 33kv feeder to Ula 1 x 7.5MVA 2023 EE21SSCIS055 PPI
Revenue Discipline, ERP (CRM, Finance, Procurement and Materials, 33/11kv Injection substation as additional supply source
Asset Management, Engineering and Project Management,
Commercial Management, HRMS, Business Intelligence) 246 4.91KM Extension of Proposed Ekwulobia 33kv feeder to Oko 1 x 7.5MVA 2023 EE21SSCIS056 PPI
33/11kv Injection substation as additional supply source
193 Procurement of service cable of size - 16 sq. mm x 2c, 15 m - of 2022 EE21LRATC030 PPI
Quantity 14,497 kms 247 Proposed AKUZOR 2 X 7.5MVA Injection substation required for ring network 2023 EE21SSCIS057 PPI
194 Procurement of service cable of size - 25 sq. mm x 4c, 15 m - - of 2022 EE21LRATC031 PPI involving Ogidi, Tollgate and Nkpor 11kv feeders
Quantity 2,372kms 248 2023 EE21SSCIS058 PPI
Construction of Ohanku 2X15MVA 33/11KV injection Sub-Station with
195 Procurement of service cable of size - 70 sq. mm x 4c, 4 m - of 2022 EE21LRATC032 PPI 3 Nos 11KV feeders to deload PH, Ngwa RD and Obohia
Quantity 800meters
249 Construction of Pipe line Rd 2X15MVA 33/11KV Injection Substation with 2023 EE21SSCIS059 PPI
196 Procurement of service cable of size - 95 sq. mm x 4c, 4 m - of 2022 EE21LRATC033 PPI 3 Nos 11KV feeder to deload Ariaria and World Bank and derating 25 Nos
Quantity 1200meters Aba-Owerri 33KV transformers
197 Procurement of service cable of size - 150 sq. mm x 1c, 16 m - of 2022 EE21LRATC034 PPI 250 Construction of 15MVA, 33/11KV ORJI Injection Substation 2023 EE21SSCIS060 PPI
Quantity 6400meters
251 Construction of 1KM line from Orji 15MVA Injection Substation 2023 EE21SSCIS061 PPI
198 Procurement of service cable of size - 300 sq. mm x 1c, 16 m - of 2022 EE21LRATC035 PPI
Quantity 4800meters 252 Construction of 2KM line from Orji 15MVA Injection Substation 2023 EE21SSCIS062 PPI
199 Procurement of service cable of size - 500 sq. mm x 1c, 16 m - of 2022 EE21LRATC036 PPI
Quantity 4800meters Signed:
200 Procurement of service cable of size - 2.5 sq. mm x 1c (copper), 2022 EE21LRATC037 PPI MANAGEMENT
16 m - of Quantity 1500rolls Enugu Electricity Distribution PLC (EEDC)