UL Project Plan ECD
UL Project Plan ECD
UL Project Plan ECD
GE MULTILIN
650 MARKLAND ST
MARKHAM, ON
L6C 0M1
I have completed your project plan and this letter outlines important project information about the UL
service(s) you requested.
UL has received enough information to start the product evaluation, however additional items and/or
samples may be needed to complete the evaluation. Details regarding the investigation items and/or
samples required are included below under the heading of Required Investigation Items and Required
Samples. Providing the items and samples requested below will avoid unnecessary delays in your
project.
CSA C22.2 NO. 14-13 INDUSTRIAL CONTROL EQUIPMENT - Edition 12 - Issue Date 2013/03/01
UL 508 STANDARD FOR INDUSTRIAL CONTROL EQUIPMENT - Edition 17 - Revision Date
2013/10/16
Product Category:
None Required
No Samples Required
Project Plan Estimated Completion Date Letter - Service Request Number Page 1 of 2
1867462.371414
Assumption(s):
All safety critical components, enclosures and materials are UL Listed/Recognized and
suitable for the intended application.
No Tests Specified
Timeline Assessment:
Any proposed project plan and timeline included in this communication is based on the received
information and on the above assumptions. The test program and other aspects of the project plan
will be finalized following a comprehensive construction review of your specific product.
A project handler from our engineering staff will begin the investigation shortly. The project handler
will keep you informed of the progress of your project. If you have any questions or need additional
information, you can contact me or customer service.
Regards,
Dana VanEvery
Engineering Coordinator
ICE
UL
T: 360-817-5762
E: [email protected]
Any information and documentation involving UL Mark services are provided on behalf of UL LLC
(UL) or any authorized licensee of UL.
Project Plan Estimated Completion Date Letter - Service Request Number Page 2 of 2
1867462.371414