Pemeliharaan Rutin PLTG Tello WEEK-35 (28 AGUSTUS - 1 SEPTEMBER 2023) Pip Updk Tello
Pemeliharaan Rutin PLTG Tello WEEK-35 (28 AGUSTUS - 1 SEPTEMBER 2023) Pip Updk Tello
Pemeliharaan Rutin PLTG Tello WEEK-35 (28 AGUSTUS - 1 SEPTEMBER 2023) Pip Updk Tello
NO PM NUMBER WORK ORDER NUMBER DESCRIPTION WORK TYPE DUE DATE LABOR JUMLAH LABOR DURASI TOTAL SENIN SELASA RABU KAMIS JUMAT FEEDBACK
HME 28 29 30 31 1
1 GT02-PM-RTN-HME-MBV-BR004 202313554 PM GT02 PENGECEKAN VISUAL PIPING MISS ELIMINATOR HME 28/08/23 Asmar, Burhanudin 2 01:30 03:00 Asmar, Burhanudin
2 GT02-PM-RTN-HME-MBV-BR001 202313553 PM GT02 PENGECEKAN VISUAL PIPING MAIN OIL SYSTEM HME 28/08/23 Asmar, Burhanudin 2 01:30 03:00 Asmar, Burhanudin
NO PM NUMBER WORK ORDER NUMBER DESCRIPTION WORK TYPE DUE DATE LABOR JUMLAH LABOR DURASI TOTAL SENIN SELASA RABU KAMIS JUMAT FEEDBACK
1 GT02-PM-RTN-HKI-MBK-GX001 202313608 PM GT02 PENGECEKAN INSTRUMENT DAN CONTROL HYDRAULIC SELF SEQUENCING VALVE
HLI-GT RATCHET & CLUTCH VH14-1
28/08/23 Ahmad, Rahmanda 2 01:00 02:00 Ahmad, Rahmanda
2 GT02-PM-RTN-HKI-MBK-AA002 202313606 PM GT02 PENGECEKAN INSTRUMENT DAN CONTROL HYDRAULIC RACHET VALVE VR5-1)
HLI-GT 28/08/23 Ahmad, Rahmanda 2 01:00 02:00 Ahmad, Rahmanda
3 GT02-PM-RTN-HLI-MBV-GH005 202313470 PM GT02 PENGECEKAN KELISTRIKAN EVAC PUMP MOTOR HLI-GT 28/08/23 Ahmad, Rahmanda 2 01:00 02:00 Ahmad, Rahmanda
4 GT02-PM-RTN-HKI-MBK-AU001 202313607 PM GT02 PENGECEKAN INSTRUMENT DAN CONTROL SELF CLUTCH CSA-1 HLI-GT 28/08/23 Ahmad, Rahmanda 2 01:00 02:00 Ahmad, Rahmanda