E S4HCON2019-demo
E S4HCON2019-demo
E S4HCON2019-demo
https://dumpsarena.com
[email protected]
QUESTION NO: 1
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade
is considered complete and you can allow all dialog users to log on to the system?
A. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
B. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
C. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
D. After the SUM roadmap step "Postprocessing" and post procedure steps are finished
ANSWER: D
QUESTION NO: 2
Which are valid options to check the progress of the database migration in a Microsoft Windows environment? There is
correct answers to this question.
Response:
ANSWER: A
QUESTION NO: 3
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes
during downtime.
The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see
40 Process Buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel? Please choose the correct answer.
A. There is a maximum of 40 parallel R31oad processes within this specific downtime phase.
B. SUM is still running in uptime; the number of 40 defined R31oad processes is considered.
C. The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.
D. These are 40 pairs of R3load processes, so there are 80 R3load processes running.
ANSWER: D
QUESTION NO: 4
ANSWER: B C D
QUESTION NO: 5
What are the benefits of using the Benchmarking option of the DMO for SUM?
A. You can obtain migration duration files that can be used to optimize the next runs from a previous benchmark run.
B. You can find the optimal number of parallel R31oad processes by monitoring host performance.
C. You can verify that the content of the download directory matches the stack.XML file.
D. You can record the modification adjustment during migration and use the transports in the next runs.
ANSWER: A B
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC
A. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
B. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.
C. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
D. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC)
procedure.
ANSWER: C
QUESTION NO: 7
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You
have already upgraded the DEV and the QAS system but not yet the PRD system. What do you
A. The upgrade of the PRD must be finished before you start new development in the DEV.
B. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.
D. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.
ANSWER: D
QUESTION NO: 8
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN
A. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you
need to select for the SAP S/4HANA conversion?
ANSWER: C D
QUESTION NO: 9
What do you need to know about the SAP ERP Upgrade and Update Guide?
D. It is a database-specific document
ANSWER: B C
QUESTION NO: 10
ANSWER: C D