AGP 22050 ITP PIP Q01 0003 00 ITP For Underground Piping Rev 01 Signed Signed Signed Signed
AGP 22050 ITP PIP Q01 0003 00 ITP For Underground Piping Rev 01 Signed Signed Signed Signed
AGP 22050 ITP PIP Q01 0003 00 ITP For Underground Piping Rev 01 Signed Signed Signed Signed
INSTRUCTIONS TO REVIEWERS:
1. Review the attached document for completeness, technical quality and coordination with other department.
2. Complete your review within ___ day(s) of receipt.
3. Mark document with comments as necessary.
4. Sign off date in space allowed.
5. Pass to next reviewer (or back to originator if last on list).
JOA NO.: PROJECT: PLEASE CHECK
22050 SOLID KILN 4 NEW CEMENT LINE EXPANSION PROJECT QMS
Project/JOA
No. 22050 Solid Kiln 4 New Cement Line Expansion Project / 22050
Batangas Heavy Fabrication Yard Bauan-Mabini Road, San Roque, Bauan, Batangas 4201, Philippines
Phone: +63 (43) 740 5800 l www.agpglobal.com
This document is strictly confidential and the exclusive property of AG&P. It cannot be No. of Pages Attachments Rev.
copied, used, modified, adapted, disseminated, published or communicated, in whole
or in part, by any means, for any purpose, without express prior written authorization of 40 30 0
AG&P. Any violation of this clause may give rise to civil or criminal liability - © AG&P.
This document and all information and data herein or herewith is the confidential and proprietary property of AG&P and is not to be used,
reproduced or disclosed in whole or in part by or to anyone without the written confirmation from AG&P.
Page : 1 of 9 .
INSPECTION & TEST PLAN AGP-22050-ITP-PIP-
Doc. No. :
Q01-0003.00
Underground Piping for Rev. No. : 0
Solid Kiln 4 New Cement Line Expansion Project Date : 28-Sep-22
INSPECTION/TEST/
REV. DATE DETAILS PREPARED REVIEWED APPROVED DOCUMENTATION
VERIFICATION CODES
1 CONTRACT REVIEW
AGP-00000-P-Z-03-0001.00 Contract
1.1 Review Contract/Project Specification Contract Document Contract Documents R1 IN
Review
Applicable Codes and Standards, IFC AGP-00000-P-Z-03-0001.00 Contract
1.2 Review Approved Drawings Approved Drawings R1 IN
Drawings Review
2 DOCUMENT APPROVAL
2.1 Project Assurance Execution Plan PC Quality Control AGP-22050-PLN-QLY-Q01-0001.00 Approved PAEP R1-AP IN
AGP-00000-P-K-12.0018 Preparation
2.2 Inspection and Test Plan PC Quality Control Approved ITP R1-AP IN
of Inspection and Test Plan
3 PERSONNEL APPROVAL
WQTR
AGP-00000-FR-L-12-0007.00
Construction Mechanical Works sec. AGP-0000-P-K-12-0001.00 (Control
(Qualified Welders' List)
3.1 Welder's Qualification 5.2.4.1 of Welders and Welding Operators R1-AP-C IN
AGP-00000-FR-L-12-0008.00
ASME IX Qualification and Certification)
(Welder's and Welding Operator's
Continuity Record)
AGP-00000-P-N-12-0001 00
Construction Mechanical Works sec.
(Personnel Qualification and
3.2 NDE Personnel Qualification 5.3.1.3, Qualification Certificates R1-AP-C IN
Certification in Nondestructive
Applicable Codes & Standards
Examination)
1 CONTRACT REVIEW
AGP-00000-FR-T-13-0001.00
(Material Inspection Report)
AGP-00000-FR-U-84-0002 00
Construction Mechanical Works sec. AGP-00000-P-L-91-0002.00(Storage
(Notification for Inspection_Testing
5.1 Consumable Receipt and Inspection 5.2.1.2 Drying Handling Issuance of Welding A1-R1 A1-R1
of Raw Materials)
Applicable Code and Standards Consumables)
Material Test Report
AGP-00000-FR-U-84-0001.00
(Discrepancy Report Form)
AGP-00000-FR-L-91-0004.00
(Welding Consumable Drying Log
Construction Mechanical Works sec. AGP-00000-P-L-91-0002.00(Storage
Monitor Consumable Baking and Holding Oven Required Sheet)
5.3 5.2.1.2 Drying Handling Issuance of Welding S S
Temperature AGP-00000-FR-L-91-0003.00
Applicable Code and Standards Consumables)
(Welding Consumable Holding Log
Sheet and Quantity Record)
AGP-00000-FR-L-91-0003.00
(Welding Consumable Holding Log
Construction Mechanical Works sec. AGP-00000-P-L-91-0002.00(Storage
Sheet and Quantity Record)
5.4 Electrode/Flux Oven Temperature Calibration 5.2.1.2 Drying Handling Issuance of Welding S S
AGP-00000-FR-L-91-0005.00
Applicable Code and Standards Consumables)
(Welding Consumable Requisition
Card)
AGP-00000-FR-L-91-0003.00
(Welding Consumable Holding Log
Construction Mechanical Works sec.
AGP-00000-P-E-93-0004.00 (Oven Sheet and Quantity Record)
5.5 Consumable Issue to Workforce 5.2.1.2 S S
and Quiver Temperature Calibration) AGP-00000-FR-L-91-0005.00
Applicable Code and Standards
(Welding Consumable Requisition
Card)
1 CONTRACT REVIEW
AGP-00000-P-T-13-0001.00
Project Specification , (Inspection and Testing) AGP-00000-FR-T-13-0014.00
6.2 Check Markings / Tagging A1/A2 A1/A2
Applicable Code and Standards AGP-00000-P-Z-91-0002.00 (Material (Inspection Release Note)
Traceability)
Width :
• 1/2" to 6" dia pipe, the trench width will be 0.60m.
• 8" to 12" dia pipe, the trench widths will be 0.75m
• 16" to 24" dia pipe, the trench width will be 1.10m.
Depth
• Underground pipeline that do not cross highways or EETIM75010/13900 Selection of AGP-00000-FR-T-92-0001.00
7.1 railroad tracks, minimum depth of 0.70m (from the top of Pipes, Valves and Accessories Underground Piping Procedure Dimensional Survey Report A1-C A1/A2
the pipe). sec. 701
• Underground pipelines that crosses access road or
highway crossings, minimum depth of 0.90m
The depth of the trench will be 10cm deeper than the
desired depth for the pipe (from the bottom of the pipe).
• Underground pipelines that crosses railroad, minimum
depth 1.20m.
1 CONTRACT REVIEW
EETIM75010/13900 Selection of
Chek and verify the 10cm thick compacted earth fill
7.2 Pipes, Valves and Accessories Underground Piping Procedure - A1/A2 S
placed at the base prior to placing of pipeline.
sec. 701
EETIM75010/13900 Selection of
Check and verify steel casings for road and railroad
7.3 Pipes, Valves and Accessories Underground Piping Procedure Approved Drawings A1/A2 S
crossings (as applicable)
sec. 701
8 FIT UP INSPECTION
Check
• Check Markings / Shop Marks and Tagging WPS AGP-00000-FR-Z-91-0004.00
Project Specification ,
8.1 • Root Gap AGP-00000-P-T-13-0001.00 (Inspection Request) A1/A2 S
Applicable Code and Standards
• Edge Preparation (Inspection and Testing) Approved Fabrication Drawings
• Alignment and Straightness/Squareness
Check
• Orientation AGP-00000-FR-Z-91-0004.00
Project Specification , AGP-00000-P-T-13-0001.00
8.2 • Proper Elevation and Plumbness (Inspection Request) A1/A2 S
Applicable Code and Standards (Inspection and Testing)
• Assembly Approved Fabrication Drawings
• Dimension of spools and pipe supports
9 WELDING INSPECTION
AGP-00000-FR-L-12-0012.00
(Welding Procedure Specification
Construction Mechanical Works sec.
Check Welders Qualification and WPS parameters AGP-0000-P-K-11-0005.00 Index)
9.1 5.2.2, 5.2.3, 5.2.4 S S
application (Production Welding Inspection) Approved WPS
ASME IX
AGP-00000-FR-L-12-0007.00
(Qualified Welders' List)
1
10 CONTRACT
BOLT REVIEW
INSPECTION
12 REPAIRS
AGP-00000-P-L-91-0004.00
Project Specification , AGP-00000-FR-L-91-0002.00 (Weld
12.1 Register All Weld Repairs Repair of Weld and Base Metal R1 R1
Applicable Code and Standards Repair Log Sheet)
Defects
1
13 CONTRACT
LINE REVIEW
CHECKING AND PUNCHLISTING
As-built drawings
Project Specification , AGP-00000-P-T-13-0001.00
13.1 Pre-line Checking AGP-00000-FR-Z-13-0001.00 A1-C A1-R1
Applicable Code and Standards (Inspection & Testing)
(Punchlist)
As-built drawings
Project Specification , AGP-00000-P-T-13-0001.00
13.2 Issues and identify punchlist category AGP-00000-FR-Z-13-0001.00 A1-C A1-R1
Applicable Code and Standards (Inspection & Testing)
(Punchlist)
As-built drawings
Project Specification , AGP-00000-P-T-13-0001.00
13.3 Check Rectified/Cleared Punch Items AGP-00000-FR-Z-13-0001.00 A1-C A1-R1
Applicable Code and Standards (Inspection & Testing)
(Punchlist)
14 HYDROTESTING
EETIM75010/13900 Selection of
AGP-0000-P-K-12-0001.00
Pipes, Valves and Accessories Calibration Certificates,
14.1 Check Gauge Calibration (Control of Monitoring, Measuring A1-C R1
sec. 600 Test Package
and Test Equipment)
ASME B31.3
EETIM75010/13900 Selection of
AGP-22050-FRM-IAT-Q01-0013.00
Verify that final Visual Inspection and NDE requirements Pipes, Valves and Accessories AGP-0000-P-X-91-0004.00
14.2 (Line Inspection Summary List) H-R1-C R1
are met and Category A Punchlist Cleared sec. 600 (Piping Pressure Testing)
Test Package
ASME B31.3
EETIM75010/13900 Selection of
Pipes, Valves and Accessories AGP-0000-P-X-91-0004.00
14.3 Check water/medium requirement Test Package A2-C R1
sec. 600 (Piping Pressure Testing)
ASME B31.3
EETIM75010/13900 Selection of
Pipes, Valves and Accessories AGP-0000-P-X-91-0004.00
14.4 Check actual pressure test and duration Test Package A1-C W1
sec. 600 (Piping Pressure Testing)
ASME B31.3
EETIM75010/13900 Selection of
Pipes, Valves and Accessories AGP-0000-P-X-91-0004.00
14.5 Visual Examination of all weld joints for leakage. Test Package A1-C W1
sec. 600 (Piping Pressure Testing)
ASME B31.3
15 FLUSHING/CLEANING REINSTATEMENT
EETIM75010/13900 Selection of
Pipes, Valves and Accessories AGP-22050-FRM-IAT-Q01-0016.00
16.2 Check the cleanliness of surface to be protected. Underground Piping Procedure A2 S
sec. 702 Coat/Wrap Holiday Test Record
TSD Data Sheet
EETIM75010/13900 Selection of
Chek and verify primer coating application. DFT shall not Pipes, Valves and Accessories AGP-22050-FRM-IAT-Q01-0016.00
16.3 Underground Piping Procedure A1 A1/A2
be less than 25-50microns. sec. 702 Coat/Wrap Holiday Test Record
TSD Data Sheet
EETIM75010/13900 Selection of
Check and verify the outer wrap application (same as Pipes, Valves and Accessories AGP-22050-FRM-IAT-Q01-0016.00
16.5 Underground Piping Procedure A1 A1/A2
inner wrap pplication) sec. 702 Coat/Wrap Holiday Test Record
TSD Data Sheet
Page : 9 of 9 .
INSPECTION & TEST PLAN AGP-22050-ITP-PIP-
Doc. No. :
Q01-0003.00
Underground Piping for Rev. No. : 0
Solid Kiln 4 New Cement Line Expansion Project Date : 28-Sep-22
ACCEPTANCE STANDARD/PROCEDURE ACTIVITY CODE
REF.
PROCESS DESCRIPTION CERTIFYING/ VERIFYING DOC. REMARKS
NO. CUSTOMER SPEC. REF. AG&P DOC. NO. AG&P CEMEX
1 CONTRACT REVIEW
EETIM75010/13900 Selection of
AGP-22050-FRM-IAT-Q01-0016.00
16.6 Conduct Holiday Testing (if required) Pipes, Valves and Accessories Underground Piping Procedure A1 W1
Coat/Wrap Holiday Test Record
sec. 702
EETIM75010/13900 Selection of
Check and verify fill compaction between the pipe and
17.1 Pipes, Valves and Accessories Underground Piping Procedure - A1/A2 S
walls of the trench up to the middle of the pipe diameter.
sec. 702
EETIM75010/13900 Selection of
Check and verify the complete filling and compacting of
17.2 Pipes, Valves and Accessories Underground Piping Procedure - A1/A2 S
the trench.
sec. 702
18 CONTROL OF NON-CONFORMITY
AGP-0000-P-K-11-0006.00
Project Specification , AGP-00000-FR-K-11-0001.00
18.1 Record / Report Nonconformities (Nonconformity and Corrective R1 IN
Applicable Code and Standards (Corrective Action Report)
Action)
AGP-0000-P-K-11-0006.00
Project Specification , AGP-00000-FR-K-11-0002.00
18.2 Monitor NCR status (Nonconformity and Corrective R1 IN
Applicable Code and Standards (Corrective Action Status Log)
Action)
AGP-00000-P-T-13-0001.00 AGP-00000-FR-T-13-0013.00
19.1 Issuance of Certificate of Conformance - AP-C R1-AP
(Inspection & Testing) (Certificate of Conformance)
20 FINAL DOCUMENTATION
TO : NITRM No. :
DEPARTMENT/SECTION : LOCATION OF INSPECTION :
FROM : PROJECT :
DEPARTMENT/SECTION : J.O.A. NO./CUSTOMER :
REF. DOC. NO. :
We would like to request for the following materials: SUPPLIER :
INSPECTION TESTING (PMI) DATE RECEIVED :
PO NO. :
Item
Item Code Material Description Qty. Unit Material Identification Markings Remarks
No.
Note: Material Identification Markings include but not limited to Heat No./Lot No. or Batch No.
: :
Project Doc. Reference No.
: :
JOA No. Date
: :
P.O. No. Doc. Recv'ng Ref. No.
:
Supplier
Ordered
Delivery Receipt or
Item No. Item Code Description Delivered QTY Packing List Quantity Variance Remarks
UOM QTY QTY
ERROR TYPE:
Purchase Order Discrepancy No Traceability Markings Others (Pls. specify)
Incomplete Documents (MTC, Calibration Cert. etc.) Physical Condition (damaged, defective, etc.)
Qty Different from DR Incomplete/Inaccurate packing list
DATE
Sheet of
Note: Material Identification Markings include but not limited to Manufacturer, Specifications, Type, Grade, Heat No., Lot No. or Batch No.
INSPECTED BY REVIEWED BY
Customer Representative
QC Inspector QC Supervisor
SIGN
NAME
DATE
Rev. 1, 18 Oct, 2018
AGP-00000-FR-L-12-0007.00
QUALIFIED WELDERS LIST Sheet of
Notes:
NAME
SIGN
DATE
Rev. 2, 18 Oct.2018
AGP-00000-FR-L-12-0008.00
WELDER'S AND WELDING OPERATOR'S CONTINUITY RECORD of
Sheet
No. Reference WPS No. Process/Position Base Metal Qualified Date Qualified Code/ Standard
JANUARY
FEBRUARY
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
NOVEMBER
DECEMBER
Rev. 3, 18 Oct. 2018
AGP-00000-FR-L-12-0012.00
WELDING PROCEDURE SPECIFICATION INDEX
KD-PRESSURE VESSELS/TANKS/BOILERS KS-STRUCTURAL KX-PIPING Sheet of
Notes:
QUANTITY
SIZE DRYING HOUR
DATE LOT No. TRADENAME IN OVEN DRYING START TIME DRYING STOP TIME DRYING TEMPERATURE REMARKS
(mm) (hr)
(pcs)
REMARKS :
QUANTITY IN QUANTITY
HOLDING QUANTITY QUANTITY USED BALANCED QUANTITY
DATE LOT No. TRADENAME SIZE (mm) OVEN ISSUED
START TIME RETURNED (pcs) (pcs) (pcs)
(pcs) (pcs)
REMARKS :
PROJECT : DATE :
JOA NO. / CUSTOMER :
PREPARED BY:
(NAME/DATE/SIGN)
TIME ISSUED
QUANTITY (pcs /
RETURNED kg)
PREPARED BY:
(NAME/DATE/SIGN)
TIME RETURNED
REMARKS :
WELDING CONSUMABLE
AGP-00000-FR-L-91.0005.00
REQUISITION CARD
PROJECT : DATE :
JOA NO. / CUSTOMER :
PREPARED BY:
(NAME/DATE/SIGN)
TIME ISSUED
QUANTITY (pcs /
RETURNED kg)
PREPARED BY:
(NAME/DATE/SIGN)
TIME RETURNED
REMARKS :
EXAMINATION REPORT
Sheet of
INSPECTION METHOD :
DC WET
AC CONTINUOUS
WELDING
DESCRIPTION PROCESS /
DRAWING JOINT NO. DISCONTINUITIES DISPOSITION
(SHOP MARK) WELDER'S
CODE
NOTE:
CHEMICAL BRAND BATCH NO.
EXAMINATION REPORT of
Sheet
Report No.
SKETCH OF INDICATION
PROJECT : IR No. :
J. O. A. No./CUSTOMER : REQUEST DATE :
MODULE No. : AREA :
INSPECTION REQUIREMENT :
LAYOUT WELDING PAINTING OTHERS (Pls. Specify) :
HEAT No. TRANSFER DIMENSIONAL / VISUAL INSULATION
FORMING PRESSURE TESTING FINAL
FIT-UP SURFACE PREPARATION PACKING
REQUEST INFORMATION INSPECTION RESULT
Sch. / Weight Welder's Welding Result
SN Drawing No. Item Description / Spool Number Joint No. Heat No. Remarks
/Surface Area Code Process Acc Rej
LEGEND: N/A - Not Applicable Sch. - Schedule LEGEND: Acc - Accepted Rej - Rejected
NOTE: NOTE:
SIGN
NAME
DATE
Rev. 7, 16 May 2022
AGP-00000-FR-N-13-0002.00
LIQUID PENETRANT EXAMINATION
REPORT Sheet of
WELDING
DESCRIPTION PROCESS /
DRAWING JOINT NO. DISCONTINUITIES DISPOSITION
(SHOP MARK) WELDER'S
CODE
NOTE:
CHEMICAL BRAND BATCH NO.
REPORT
Sheet of
(ATTACHMENT)
Report No.
SKETCH OF INDICATION
Report No :
Line Inspection Summary List Date :
Page : of
Shop Field
Radiographic
Isometric / Spool Information Welding Details Mat'l Information Item 1 Mat'l Information Item 2
Testing Liquid Magnetic
VI Ferrite PMI Report PWHT HT Report
Penetrant Particle
AG&P Isometric Rev. Piping Mat'l Spool Joint Joint Date Welder Welder Material Material Result RT Report Report No. No. Report No. No.
Line No. Size Sch WPS No. Heat No. Heat No. Result Report No. Report No.
Drawing No. No. Class Type No. No. Type Welded Code 1 Code 2 Specification Specification No.
Name
Signature
Date
Rev. 0, 4-June-2022
AGP-00000-FR-N-13-0004.00
RADIOGRAPHIC EXAMINATION REPORT
Sheet of
A B C D E F G
Welding Process / Welder's
Negative to Indication
Source-film-weld position
Misalignment (MA)
Burn Through (BT)
Lack of Fusion (LF)
Slag Inclusion (SL)
Location Marker
Excessive Scatter
Viewing (S or C)
Undercut (UC)
Porosity (PR)
Sensitivity
Crack (CR)
Accepted
Rejected
Density
Others
Line No. / Weld
Code
mm
REMARKS
Identification
NDE LEVEL I/II (ASNT) NDE LEVEL II (ASNT) CUSTOMER / TPI REP.
NAME/SIGN/DATE NAME/SIGN/DATE NAME/SIGN/DATE
Rev. 1, 04 Nov. 2019
AGP-00000-FR-N-13-0005.00
TECHNIQUE
INSTRUMENT TYPE CALIBRATION BLOCK
INSTRUMENT
DAMPING SETTING
SERIAL No.
CALIBRATION
REJECT SETTING
CERTIFICATE
SPECIAL EQUIPMENT Search Unit COUPLANT BRAND / TYPE
AMBIENT CONDITIONS :
MORNING AFTERNOON EVENING
RELATIVE HUMIDITY
DRY BULB TEMPERATURE
WET BULB TEMPERATURE
DEW POINT TEMPERATURE
SURFACE TEMPERATURE
SURFACE PREPARATION :
COATING :
COATING EQUIPMENT :
MEASURING INSTRUMENTS :
APPEARANCE :
REMARKS
PROJECT : J. O. A. No. :
CUSTOMER : DATE :
MODULE No. :
CLEANING METHOD
CLEANING RESULT
ACCEPTED REJECTED
CLEANING LIMIT/EXTENT
FROM :
TO :
REMARKS
PREPARED BY WITNESSED BY
NAME
SIGN
DATE
NAME
SIGN
DATE
REMARKS:
SIGN
DATE
BLOCK DIAGRAM:
TRACER SHOT
TRACER SHOT33 TRACER SHOT 3 TRACER SHOT 3 TRACER SHOT 3
TRACER SHOT
TRACER SHOT11 TRACER SHOT 1 TRACER SHOT 1 TRACER SHOT 1
TRACER SHOT
TRACER SHOT44 TRACER SHOT 4 TRACER SHOT 4 ORIGINAL JOINT TRACER SHOT 4
ORIGINAL JOINT
ORIGINAL JOINT ORIGINAL JOINT ORIGINAL JOINT
TRACER SHOT
TRACER SHOT22 TRACER SHOT 2 TRACER SHOT 2 TRACER SHOT 2
TRACER SHOT
TRACER SHOT33 TRACER SHOT 3 TRACER SHOT 3 TRACER SHOT 3
TRACER SHOT
TRACER SHOT11 TRACER SHOT 1 TRACER SHOT 1 TRACER SHOT 1
TRACER SHOT
TRACER SHOT44 TRACER SHOT 4 TRACER SHOT 4 ORIGINAL JOINT TRACER SHOT 4
ORIGINAL JOINT
ORIGINAL JOINT ORIGINAL JOINT ORIGINAL JOINT
TRACER SHOT
TRACER SHOT22 TRACER SHOT 2 TRACER SHOT 2 TRACER SHOT 2
TRACER SHOT
TRACER SHOT33 TRACER SHOT 3 TRACER SHOT 3 TRACER SHOT 3
TRACER SHOT
TRACER SHOT11 TRACER SHOT 1 TRACER SHOT 1 TRACER SHOT 1
TRACER SHOT
TRACER SHOT44 TRACER SHOT 4 TRACER SHOT 4 ORIGINAL JOINT TRACER SHOT 4
ORIGINAL JOINT
ORIGINAL JOINT ORIGINAL JOINT ORIGINAL JOINT
TRACER SHOT
TRACER SHOT22 TRACER SHOT 2 TRACER SHOT 2 TRACER SHOT 2
Area :
Reference Document/Standard: State document no., rev. no, clause,section/para describing the nonconformity
detected or identfied OFI.
Description of Findings:
Approved by:
Approved by:
Remarks*:
Result of Follow-up/Verification:
STATUS Open Closed
Initiator
QA/MR
Note: Use additional sheet for further follow-up/verification, if necessary. Customer Rep./TPI/AI(if req'd)
Rev. 7, 19 Aug. 2022
AGP-00000-FRM-QLY-Q01-
0002.00
CORRECTIVE ACTION REPORT
Sheet of
PART I - To be filled-out by the CAR Initiator
Additional Sheet for Follow-up/Verification Report No.:
Second Verification
Details:
STATUS Open Closed
Corrective Action
Status
Implemented?
Yes No
Initiator
Effective?
Yes No
QA/MR
Third Verification
Details:
STATUS Open Closed
Corrective Action
Status
Implemented?
Yes No
Initiator
Effective?
Yes No
QA/MR
CERTIFICATE OF CONFORMANCE
QTY. / DESCRIPTION :
CONTRACT No. :
QC MANAGER DATE
As of. :
CORRECTION/ ACTION CLOSE-OUT
CAR ROOT CAUSE
CAR NO. ISSUED TO INITIATOR FINDINGS PROPOSED CORRECTIVE DATE ISSUED IMPLEMENTATION
SOURCE (as applicable)
ACTION DATE DATE REMARKS
CLOSED
OPEN