Data Sheet For LDS
Data Sheet For LDS
Page 1 of 10
Data Sheet For Leak Detection Field Instruments
NOTES:
B6
B6
1. ALL PROCESS INFORMATION ARE BASED ON CRUDE OIL.
Page 5 of 10
CALIBRATED RANGE
Ambient
OPERATING TEMP.
Pipe Rating
Item NO.
MIN./MAX.
Barometric Pressure
"U" LENGTH
MIN./MAX.
LINE / EQUIP.
Connection
(°C)
PRESSURE
(°C)
Tag NO. SERVICE Fluid / Fluid State (mbar-a) / Absolute P&ID No. REMARK REV.
(bar‐g)
TEMP.
NO.
(°C)
Temperature (°C) /
Maximum Relative
Humidity (%)
NOTES: B6 B6
1. ALL PROCESS INFORMATION ARE BASED ON CRUDE OIL.
Page 7 of 10
GENERAL NOTES:
1 TAG. NO. SEE NEXT SHEETS
2 SERVICE SEE NEXT SHEETS V.T.A:VENDOR TO ADVISED
3 P&IDNO. SEE NEXT SHEETS
4 LINE NUMBER SEE NEXT SHEETS (1) POWER CONSUMPTION OF THE PROBES
5 TYPE OF TECHNOLOGY TRANSIT TIME SHALL BE SPECIFIED BY VENDOR IN THE
PROPOSAL.
PROBE
6 MATERIAL (Sensor, wetted part, body material): 316 ST.ST.(Note 5)
7 INSTALLATION V.T.A. (2) NUMBER OF CHANNEL SHALL BE
8 TYPE ULTRASONIC / CLAMP ON AT LEAST TWO PATHS.
9 POWER SUPPLY 24 VDC (V.T.A.) (NOTE 1)
10 ORIENTATION HORIZONTAL (3) EMC CONFORMITY SHALL BE AS PER
11 ENCLOSURE IP65 EN-50082.
12 NO. OF CHANNEL V.T.A (NOTE-2)
13 CABLE CONNECTION MFR. STD. (4) ALL FLOW TRANSMITTERS SHALL BE
14 GLAND SIZE & MATERIAL MFR. STD. SUITABLE FOR PIG RUNNING APPLICATION.
15 PROVISION FOR ON LINE CHANGEABILITY OF SENSOR YES
TRANSMITTER (5) ALLWETTED PARTS MATERIAL
16 OUTPUT 4-20 mA, SMART SHALL BE ACC TO NACE MR 0175.
17 RANGE m3/hr SEE NEXT SHEETS
18 ENCLOSURE CLASS IP65, EEx "ia" IIB T3 (6) THE POSITION AND NUMBER OF
19 ELECTRICAL CONNECTION M20 X 1.5 TRANSDUCERS SHALL BE CAPABLE OF
COVERING ALL REGIMES OF FLOW
20 ACCURACY ± 0.5 % OF FULL SCALE
INCLUDING LAMINAR, TURBULENT,
21 RANGEABILITY BETTER THAN 5:1 TRANSITION AND IT SHALL BE
22 REPEATABILITY ± 0.1% FULL SCALE INDEPENDENT OF THE REYNOLDS NUMBER.
23 HART PROTOCOL CAMPATIBLE YES
CONSTRUCTION
24 PIPE MATERIAL SEE NEXT SHEETS
25 PIPE NOMINAL DIAMETER SEE NEXT SHEETS (7) FAILURE OF EACH TRANSDUCER SHALL
26 PIPE INSIDE DIAMETER SEE NEXT SHEETS BE ALARMED AT THE METER TRANSMITTER.
27 PIPE RATING SEE NEXT SHEETS
28 FLANGES TO BE SUPPLIED N/A
29 NP,ND FACE N/A
30 FLANGE MATERIAL N/A
31 FLANGE RATING N/A
OPTION
32 COMPENSATION CABLE V.T.A
33 LOCAL INDICATOR NO
34 FLOW COMPUTER NO
35 RETRACTION TOOL NO
36 OTHER S.S NAME PLATE
SERVICE CONDITIONS
37 FLUID SEE NEXT SHEETS
38 FLUID STATE LIQUID
39 MAX./MIN. FLOW m3/hr SEE NEXT SHEETS
40 NORMAL FLOW m3/hr SEE NEXT SHEETS
41 OPERATING PRESSURE BAR-G SEE NEXT SHEETS
42 OPERATINGTEMPERATURE °C SEE NEXT SHEETS
43 DENSITY AT OPER. COND. kg/m³ SEE NEXT SHEETS
44 COMPRESSIBILITY FACTOR N/A
45 OPERATING VISCOCITY SEE NEXT SHEETS
46 QUALITY % OR ° SUPERHEAT N/A
47 DESIGN PRESSURE BAR-G SEE NEXT SHEETS
48 MIN / MAX DESIGN TEMPERATURE SEE NEXT SHEETS
49
50
AMBIENT CONDITIONS
51 BAROMETRIC PRESSURE mbara SEE NEXT SHEETS
52 ABS. TEMPERATURE SEE NEXT SHEETS
53 RELATIVE HUMIDITY (MAX) SEE NEXT SHEETS
PURCHASE
54 MANUFACTURER V.T.A
55 MODEL NO. V.T.A
Page 8 of 10
Ambient Conditions: Operating
Barometric Pressure Pressure Operating
Item No.
Notes:
B6
1. ALL PROCESS INFORMATION ARE BASED ON CRUDE OIL.
Page 9 of 10
Outlet of Launching
2055-ED-100-PR-PI- CRD-2-040-B7C3-30"- (973.4/1012.4) / (-2/51) / 3 valve manifold is
1 PTx-1172A Trap PL-251 (SABZAB Crude Oil / Liquid 59.34~97.2 0 ~ 160 113 -2 / 85 900#
0001-B4 PT (18.9/93.7) requied
Pump Station)
Outlet of Launching
2055-ED-100-PR-PI- CRD-2-040-B7C3-30"- (914/947.9) / (-0.8/47.8) / 3 valve manifold is
2 PTx-1172B Trap PL-251 (SABZAB Crude Oil / Liquid 59.34~97.2 0 ~ 160 113 -0.8 / 85 900#
0001-B4 PT (9.2/81.7) requied
Pump Station)
Inlet of Receiving Trap
2055-ED-100-PR-PI- CRD-3-001-B3C3-30"- (914/947.9) / (-0.8/47.8) / 2 valve manifold is
3 PTx-2172A PR-351 (Tang-i-fanni Crude Oil / Liquid 5.52 0 ~ 10 28 -0.8 / 85 300#
0001-B4 PT (9.2/81.7) requied
Pump Station)
Inlet of Receiving Trap
2055-ED-100-PR-PI- CRD-3-001-B3C3-30"- (872.2/899.2) / (- 2 valve manifold is
4 PTx-2172B PR-351 (Tang-i-fanni Crude Oil / Liquid 5.52 0 ~ 10 28 -10.6 / 85 300#
0001-B4 PT 10.6/44.2) / (10.8/86.5) requied
Pump Station)
Outlet of Launching
2055-ED-100-PR-PI- CRD-3-033-B7C3-26"- (872.2/899.2) / (- 3 valve manifold is
5 PTx-2173A Trap PL-351 (Tang-i- Crude Oil / Liquid 69.52~82.62 0 ~ 160 123 -10.6 / 85 900#
0001-B4 PT 10.6/44.2) / (10.8/86.5) requied
fanni Pump Station)
Outlet of Launching
2055-ED-100-PR-PI- CRD-3-033-B7C3-26"- (872.2/899.2) / (- 3 valve manifold is
6 PTx-2173B Trap PL-351 (Tang-i- Crude Oil / Liquid 69.52~82.62 0 ~ 160 123 -10.6 / 85 900#
0001-B4 PT 10.6/44.2) / (10.1/86.5) requied
fanni Pump Station)
Inlet of Receiving Trap
2055-ED-100-PR-PI- CRD-4-001-B3C3-26"- (872.2/899.2) / (- 2 valve manifold is
7 PTx-2272A PR-451 (Asar Pump Crude Oil / Liquid 5.52 0 ~ 10 25.4 -10.6 / 85 300#
0001-B4 PT 10.6/44.2) / (10.1/86.5) requied
Station)
Inlet of Receiving Trap
2055-ED-100-PR-PI- CRD-4-001-B3C3-26"- (824.7/848.4) / (-19/41.4) / 2 valve manifold is
8 PTx-2272B PR-451 (Asar Pump Crude Oil / Liquid 5.52 0 ~ 10 25.4 -19 / 85 300#
0001-B4 PT (11.1/82.6) requied
Station)
Outlet of Launching CRD-4-023-B7C3-26"-
2055-ED-100-PR-PI- (824.7/848.4) / (-19/41.4) / 3 valve manifold is
9 PTx-2273A Trap PL-451 (Asar PT Crude Oil / Liquid 53.79~66.26 0 ~ 100 101.6 -19 / 85 900#
0001-B4 (11.1/82.6) requied
Pump Station)
Outlet of Launching CRD-4-023-B7C3-26"-
2055-ED-100-PR-PI- (814.4/842.7) / (-23.6/40) / 3 valve manifold is
10 PTx-2273B Trap PL-451 (Asar PT Crude Oil / Liquid 53.79~66.26 0 ~ 100 101.6 -23.6 / 85 900#
0001-B4 (14.9/85.2) requied
Pump Station)
Inlet of Receiving Trap
2055-ED-100-PR-PI- CRD-5-001-B3C3-26"- (973.4/1012.4) / (-2/51) / 2 valve manifold is
11 PTx-2372A PR-551 (Pali baba Crude Oil / Liquid 21.24~33.77 0 ~ 40 46.6 -2 / 85 300#
0001-B4 PT (18.9/93.7) requied
Pump Station)
Inlet of Receiving Trap
2055-ED-100-PR-PI- CRD-5-001-B3C3-26"- (914/947.9) / (-0.8/47.8) / 2 valve manifold is
12 PTx-2372B PR-551 (Pali baba Crude Oil / Liquid 21.24~33.77 0 ~ 40 46.6 -0.8 / 85 300#
0001-B4 PT (9.2/81.7) requied
Pump Station)
Outlet of Launching
2055-ED-100-PR-PI- CRD-5-023-B7C3-26"- (914/947.9) / (-0.8/47.8) / 3 valve manifold is
13 PTx-2373A Trap PL-551 (Pali baba Crude Oil / Liquid 64.9~67.52 0 ~ 100 104.5 -0.8 / 85 900#
0001-B4 PT (9.2/81.7) requied
Pump Station)
Outlet of Launching
2055-ED-100-PR-PI- CRD-5-023-B7C3-26"- (872.2/899.2) / (- 3 valve manifold is
14 PTx-2373B Trap PL-551 (Pali baba Crude Oil / Liquid 64.9~67.52 0 ~ 100 104.5 -10.6 / 85 900#
0001-B4 PT 10.6/44.2) / (10.8/86.5) requied
Pump Station)
Inlet of Receiving Trap
2055-ED-100-PR-PI- CRD-6-001-B3C3-26"- (872.2/899.2) / (- 2 valve manifold is
15 PTx-2472A PR-651 (Razan Pump Crude Oil / Liquid 16.62~28.83 0 ~ 40 42 -10.6 / 85 300#
0001-B4 PT 10.6/44.2) / (10.8/86.5) requied
Station)
Inlet of Receiving Trap
2055-ED-100-PR-PI- CRD-6-001-B3C3-26"- (872.2/899.2) / (- 2 valve manifold is
16 PTx-2472B PR-651 (Razan Pump Crude Oil / Liquid 16.62~28.83 0 ~ 40 42 -10.6 / 85 300#
0001-B4 PT 10.6/44.2) / (10.1/86.5) requied
Station)
Outlet of Launching
2055-ED-100-PR-PI- CRD-6-025-B7C3-26"- (872.2/899.2) / (- 3 valve manifold is
17 PTx-2473A Trap PL-651 (Razan Crude Oil / Liquid 59.31~81.1 0 ~ 160 120 -10.6 / 85 900#
0001-B4 PT 10.6/44.2) / (10.1/86.5) requied
Pump Station)
Outlet of Launching
2055-ED-100-PR-PI- CRD-6-025-B7C3-26"- (824.7/848.4) / (-19/41.4) / 3 valve manifold is
18 PTx-2473B Trap PL-651 (Razan Crude Oil / Liquid 59.31~81.1 0 ~ 160 120 -19 / 85 900#
0001-B4 PT (11.1/82.6) requied
Pump Station)
Inlet of Receiving Trap
2055-ED-100-PR-PI- CRD-7-001-B6C3-26"- (824.7/848.4) / (-19/41.4) / 2 valve manifold is
19 PTx-3172A PR-751 (Shazand arak Crude Oil / Liquid 35.85~45.3 0 ~ 60 57 -19 / 85 600#
0001-B4 PT (11.1/82.6) requied
Pump Station)
Inlet of Receiving Trap
2055-ED-100-PR-PI- CRD-7-001-B6C3-26"- (814.4/842.7) / (-23.6/40) / 2 valve manifold is
20 PTx-3172B PR-751 (Shazand arak Crude Oil / Liquid 35.85~45.3 0 ~ 60 57 -23.6 / 85 600#
0001-B4 PT (14.9/85.2) requied
Pump Station)
NOTES:
B6 B6 B6
1. ALL PROCESS INFORMATION ARE BASED ON CRUDE OIL.