Weekly Assignment - Modul 5 - Material Requirement Planning (MRP)
Weekly Assignment - Modul 5 - Material Requirement Planning (MRP)
The figure and table below are detailed information about product structure and master
production schedule provided by the company. Based on these data, build the MRP table
for all components and arrange them to the format as explained in the briefing session. Give
a brief analysis and conclusion to the design of the MRP.
Note:
For the master schedule data in Table 1, add with 2 last digits from group members’ student
ID number.
Example:
Aaa 2401950913
Bbb 2401912333
Ccc 2401927740
Ddd 2401917469