This document contains a chapterwise question bank for the subject "Project Management" for the Electrical Engineering department. It includes 6 units covering topics like introduction to project management, work definition, project scheduling and planning tools, developing project plans, project implementation, and post-project analysis. For each unit, 5 questions are provided along with their expected learning outcomes and cognitive levels. The questions range from basic recall to higher-order thinking and include topics such as defining key project management terms, explaining processes and methods, performing calculations, and evaluating scenarios.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
47 views6 pages
TY Project Management Question Bank
This document contains a chapterwise question bank for the subject "Project Management" for the Electrical Engineering department. It includes 6 units covering topics like introduction to project management, work definition, project scheduling and planning tools, developing project plans, project implementation, and post-project analysis. For each unit, 5 questions are provided along with their expected learning outcomes and cognitive levels. The questions range from basic recall to higher-order thinking and include topics such as defining key project management terms, explaining processes and methods, performing calculations, and evaluating scenarios.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6
Electrical Engineering Department
Subject: Elective VIII (Project Management) Class: TE
Subject Incharge: Prof. Patil J.B. Semester: II
CHAPTERWISE QUESTION BANK
UNIT 1: INTRODUCTION TO PROJECT MANAGEMENT Sr. Course Questions Blooms Level No. Outcome 1 Define Project. State and explain Remember CO1 characteristics of Project. 2 Define Project management. Explain in detail Understand CO1 objectives of Project management. 3 Explain Stages of Project Management. Understand CO1 4 Discuss in detail Project Planning Process. Create CO1 5 Explain Project organization structure in Understand CO1 detail.
UNIT 2: WORK DEFINITION
Sr. Blooms Course Questions No. Level Outcome 1 Define Work study. What are the Steps Involved in Work Study? State Principles and objectives of Work Remember CO1 study. Also state the benefits of Work study. 2 Discuss in detail Project Cost Estimation on the basis of following points a) Inputs Create CO1 b) Tools and Techniques c) Outputs 3 Discuss in detail Cost Budgeting on the basis of following points Create CO1 a) Inputs b) Tools and Techniques c) Outputs 4 Explain Project Risk Management on the basis of Purpose, Objectives, Characteristics, Approach, Understand CO2 Identification and analysis 5 Explain Time Estimation Method by considering Optimistic, Pessimistic and Most Likely Time Understand CO2 Estimate. State in short Single versus Multiple Time Estimates.
UNIT 3: PROJECT SCHEDULING AND PLANNING TOOLS
Sr. Blooms Questions No. Level 1 Explain in detail Work Breakdown Structure (WBC). Understand 2 Explain in detail Linear Responsibility Chart (LRC). Understand 3 Explain Gantt charts. Understand 4 Explain CPM/PERT Networks in detail. Understand 5 A small project consisting of ten activities has the following Apply characteristics: a) Construct the project network. b) Find the duration and variance of each activity. c) Find the critical path and project completion time. (ANS: 1-2-3-6-7-8; 17 weeks) d) What is the probability of completing project on or before 22 week Sr. Blooms Questions No. Level 6 A Project is composed of seven activities whose time estimates are listed in Evaluation the following table. Activities are simplified by this beginning (1) ones ending (j) Node member. Calculate expected project length. (ANS: Expect project length will be 17 weeks.)
7 Find out the completion time and the critical activities for the following Analyze project:
ANS: The critical activities are C, F, J and L. The project completion
time is 47 units of time. Sr. Blooms Questions No. Level 8 Draw the network diagram, determine the critical path and project Evaluation completion time for the following project:
(ANS: The critical activities are B, E, I and K. The project
completion time is 22 weeks) UNIT 4: DEVELOPING PROJECT PLAN Sr. Blooms Questions No. Level 1 Explain Project cash flow analysis. Understand 2 Explain Project scheduling with resource constraints. Understand 3 Discuss in detail Resource Levelling and Resource Allocation. Create 4 With necessary graphs discuss in detail Time Cost Trade off : Crashing Create Heuristic. 5 Let us say Nice Ltd wants to expand its business and so it is willing to Evaluation invest Rs 10,00,000. The investment is said to bring an inflow of Rs. 1,00,000 in first year, 2,50,000 in the second year, 3,50,000 in third year, 2,65,000 in fourth year and 4,15,000 in fifth year. Assuming the discount rate to be 9%. Let us calculate NPV using the formula. 6 A project requires an initial investment of $225,000 and is expected to Apply generate the following net cash inflows: Year 1: $95,000 Year 2: $80,000 Year 3: $60,000 Year 4: $55,000 Required: Compute net present value of the project if the minimum desired rate of return is 12%. UNIT 5: PROJECT IMPLEMENTATION Sr. Blooms Course Questions No. Level Outcome 1 Discuss in deatail Project Monitoring and Control Create CO1 with PERT/Cost: 2 What are the Computers applications used in Remember CO3 Project Management. Explain brief. 3 Explain in deatail Various types of Contract Understand CO3 Management. 4 Explain in detail Project Procurement Understand CO2 Management.
UNIT 6: PROJECT IMPLEMENTATION
Sr. Blooms Course Questions No. Level Outcome 1 Define Post Project Analysis. What is the Remember CO2 meaning of Post Project Evaluation? 2 Explain in detail Objectives of Post Project Understand CO3 Evaluation. 3 Discuss the process of Post Project Evaluation. Create CO4 4 What are the Observations need to take during Remember CO4 Post Project Evaluation? Explain in detail. 5 Discuss in brief Report on Post Project Create CO4 Evaluation.