1- Specification / Code Comparison Sheet

Contract Number: Date:


4200000031-022 3/8/2023
Contract Title Document Number:
4200000031-SAMA-SITE PREPARATION FRAMEWORK3
Work Order No. CRS Number:
W0-022
Work Order Title Contractor Name:
022-Enabling Works for Logistics Facilities (L3)- Coastal Desert east Region SAMA CONSTRUCTION FOR TRADING & CONTRACTING
S. Applicator / Division / Subdivision Number Technical Specification Title Technical Specification Requirements Drawing Reference Proposed Material / Product / Compliant (Yes, Deviation (N/A) Remarks
No. Installer / Reference (Approved IFC with Equipment with Model Number No) (Justify any Deviations from Project
Fabricator Indicated Location) and Serial Number Specification)
1 FOSAM NEOM SPECIFICATION 34100 PRECAST STRUCTURAL Nonmetallic, Nonshrink Grout: Premixed, nonmetallic, 10-600000-420000001-ESC- FOSARAC- CONBEXTRA GP YES N/A
PART 2.11 CONCRETE- GROUT noncorrosive, nonstaining grout STR-DRG-009132-B
MATERIALS containing selected silica sands, Portland cement, shrinkage-
compensating agents, plasticizing and
water-reducing agents, complying with ASTM C 1107/C
1107M, of consistency suitable for
application within a 30-minute working time. Water-soluble
chloride ion content less than 0.06
percent by weight of cement when tested according to ASTM C
1218/C 1218M.

WE CERTIFY THAT ALL THE REQUIREMENTS OF THIS SPECIFICATION FOR THE PROPOSED MATERIALS/PRODUCT/EQUIPMENT HAS BEEN COMPARED, AND THE DEVIATIONS FROM THE SPECIFICATION (IF ANY) HAVE BEEN SPECIFICALLY IDENTIFIED AND ARE DEEMED
ACCEPTABLE. PERMISSION TO PROCEED SHALL NOT CONSTITUTE ACCEPTANCE OR APPROVAL OF MATERIALS SELECTED BY CONTRACTOR AND SHALL NOT RELIEVE CONTRACTOR FROM FULL COMPLIANCE WITH CONTRACT TECHNICAL SPECIFICATIONS, AND APPLICABLE LOCAL AUTHORITIES' SPECIFICATIONS.

Manufacture / Fabricator / Supplier Contractor / Subcontractor

Prepared By: Reviewed by: Approved by: Company Stamp: Prepared by: Reviewed by: Approved by: Company Stamp:
Mohammed Rinshin A Thirunavkkarasu Sved Iqbal Imam
Name Name

QC Engineer QA/QC Manager Project Mananger


Position Position

Signature Signature

Date 7/27/2023 7/27/2023 7/27/2023 Date 7/29/2023 7/29/2023 7/29/2023