0% found this document useful (0 votes)
30 views2 pages

Prepost Test

The document contains questions about preventive maintenance and total productive maintenance. It asks about the pillars of TPM, Jishu-Hozen maintenance, components of OEE, identifying task sequencing, classifications of major losses in TPM, tags used in TPM, key factors in preventive maintenance, machine deterioration, predictive maintenance, and the second pillar of TPM.

Uploaded by

YK Tang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views2 pages

Prepost Test

The document contains questions about preventive maintenance and total productive maintenance. It asks about the pillars of TPM, Jishu-Hozen maintenance, components of OEE, identifying task sequencing, classifications of major losses in TPM, tags used in TPM, key factors in preventive maintenance, machine deterioration, predictive maintenance, and the second pillar of TPM.

Uploaded by

YK Tang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

NAME :_______________________________________________________________________

PREVENTIVE MAINTENANCE
PRE POST
1 The following are the pillars of Total Productive Maintenance
EXCEPT
A. Autonomous Maintenance
B.. Quality Maintenance
C. Predictive Maintenance
D. Safety, Health and Environment

2 Jishu -Hozen Maintenance is about…


A. analyzing the common breakdown of machines
B. empowered and develop skilled operators for simple
maintenance
C. Management decision on buying new machine
D. concept of upskilling maintenance technician to
become master experts

3 What is the 3 major component to calculate OEE?


A. Availability, Performance, Speed.
B. Availability, Downtime, Quality
C. Quality, Cost, Downtime
D. Availability, Performance, Quality

4 What will be the best way to identify task sequencing for


optimizing maintenance time?
A. Critical Path Method
B. Task Path Method
C. Maintenance Breakdown Path Analysis Method
D. OEE Path Method

5 IN the study of Total Productive Maintenance, generally how


many classifications of major losses (as per the TPM guideline)
A. 10
B. 12
C. 16
D. 8

6 IN TPM, what sort of tags are attached to equipment where


problems are discovered?
A. Gemba
B. Fuguai
C. Naguai
D. Hirotiko .

7 The key factors in successful Preventive Maintenance


A. Scheduling + Execution.
B. Scheduling + Cost
C. Quality + Execution.
D. Quality + Scheduling

8 What is a typical machine deterioration


A. Normal, force, accelerated deterioration
B. Force, Sabotage, Accelerated deterioration
NAME :_______________________________________________________________________

C. Normal, abnormal deterioration


D. None of the above

9 Predictive Maintenance is..


A. actually the same as Preventive Maintenance, just
different name
B. Maintenance done only when machine breakdown.
C. analysis carried out technological to detect when
failure will happens.
D. is perform when Preventive maintenance fails to
achieve its objective

10 TPM Pillar number 2 is also known as


A. Gemba Kaizen
B. Konketsu Kinazawa
C. Kaizen Poka
D. Kobetsu Kaizen

You might also like