0% found this document useful (0 votes)
173 views1 page

Checklist - Anchor Bolt Casting

The document is an inspection checklist for anchor bolt casting at a construction site. It lists 13 check points to verify dimensions, placement, and condition of anchor bolts and rebar columns before pouring concrete. The checklist ensures anchor bolts are properly positioned and will be encased in concrete as specified in the project drawings.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
173 views1 page

Checklist - Anchor Bolt Casting

The document is an inspection checklist for anchor bolt casting at a construction site. It lists 13 check points to verify dimensions, placement, and condition of anchor bolts and rebar columns before pouring concrete. The checklist ensures anchor bolts are properly positioned and will be encased in concrete as specified in the project drawings.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Green Brick Project Pvt. Ltd.

Inspection Check List Prior to Anchor Bolt Casting

Checklist No.:GBPPL/SE/AB/01, Rev 00


Effective Date :-
Project :
Project Number : Building No : Grid:

Site Location : Inspection Date:

Inspection Stage : 1) After 30% AB Casting Responsibility:


2) After Next 30% AB Casting
3) After Balance 40% AB Casting
Observation Extra
Sl. No. Check Point Require
Remarks
Yes No ment
Whether Approved Drawings are
1 available?
Whether C/C of RCC column and PEB
2 steel column at site has been checked ?

Whether Diagonal distance of RCC


3
pedastal has been checked?

Whether outer dimension of PEB and


4
RCC pedastal has been checked?
Whether all anchor bolts are coming
5 inside the column rings with 50mm clear
concrete cover?
Whether RCC pedastal size is more
6
than the PEB base plate size ?
Whether threading of anchor bolts are
7 in good condition and threads are
covered before casting ?
Whether pitch distance of templates
8
and AB drawings are checked ?
Whether required AB quantity has been
9
checked with drawing ?
10 Whether FFL has been checked ?
Whether projection of AB above
pedastal / floor level has been checked
11
as per drawings requirement ?

Pls provide Photos of atleast 5% footing 5%


12
numbers Photo
Whether Complete AB Deviation report
13 has been sent to HO. Major Deviation Report
has been highlighted to client

Checked / Reviewed By: Approved By:

Sign: Sign:

Name: Name: