The document is a checklist for inspecting cladding installation on a construction project. It contains 13 check points to ensure proper installation and quality of the cladding work. The checklist will be used at various stages of the project to check 30%, 60%, and 100% completion of cladding work.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
102 views

Checklist - Cladding Installation

The document is a checklist for inspecting cladding installation on a construction project. It contains 13 check points to ensure proper installation and quality of the cladding work. The checklist will be used at various stages of the project to check 30%, 60%, and 100% completion of cladding work.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Green Brick Project Pvt. Ltd.

Inspection Check List for Cladding Installation with Accessories

Checklist No.:GBPPL/SI/CI/01, Rev 00


Effective Date :-
Project :
Project Number : Building No : Grid:

Site Location : Inspection Date:

Inspection Stage : 1) After 30% Cladding Responsibility:


2) After Next 30% Cladding
3) After Balance 40% Cladding

Observation Extra
Sl. No. Check Point Requireme
Remarks
Yes No nt
Whether Sheeting Drawings are
1
available?
Safety
Whether Proper and safe scaffolding is
2 Officer
available ? Sign
Safety
3 Whether proper PPE are availavble ? Officer
Sign

Whether correct size sheets are available


5
for installation?

Whether all acessories and tools are


6
available?

Whether correct size of Sheeting screws


7
are used with power screw driver?

Whether Sheets are free from any type of 5%


8
damage and dents ? Photo

Whether proper side and end lap has


9
been maintained as per drawing ?

Whether Day light panels are fixed as per 5%


10
drawing? (If applicable) Photo

Whether Plumb of Cladding sheets has 5%


11
been checked after each bay installation ? Photo
Whether flashings etc are installed 5%
12
properly as per drawing ? Photo
Roofing
Whether Leakage proof cladding is
13 Team
ensured?
Sign

Checked / Reviewed By: Approved By: