0% found this document useful (0 votes)
303 views52 pages

SOP Status 180723

The document contains a list of standard operating procedures (SOPs) for various departments of Popular Pharmaceuticals Ltd., including Human Resources, Information Technology, Safety, Training, Administration, Warehouse, Dispensing, and others. Each SOP is assigned a unique identification number, and includes information on revision number, effective date, and review date. The SOP list is signed off by various quality assurance managers and executives of the company.

Uploaded by

QA Common Users
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
303 views52 pages

SOP Status 180723

The document contains a list of standard operating procedures (SOPs) for various departments of Popular Pharmaceuticals Ltd., including Human Resources, Information Technology, Safety, Training, Administration, Warehouse, Dispensing, and others. Each SOP is assigned a unique identification number, and includes information on revision number, effective date, and review date. The SOP list is signed off by various quality assurance managers and executives of the company.

Uploaded by

QA Common Users
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 52

POPULAR PHARMACEUTICALS LTD.

SOP List

Huaman Resources

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

1 Manpower Requisition HR/001/00 00 10.05.23 09.05.28


2 Training Requisition HR/002/00 00 10.05.23 09.05.28
3 Post Training Report HR/003/00 00 24.06.23 23.06.28

Prepared By: Checked By: Approved By:

Md. shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA
POPULAR PHARMACEUTICALS LTD.

SOP List

Information Technology

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

1 SAP Server Backup and Restoration IT/001/00 00 21.06.22 20.06.27


2 Access Management for SAP IT/002/00 00 21.06.22 20.06.27
3 User Account Creation and Maintenance IT/003/00 00 21.06.22 20.06.27
4 User System Security and Access Control IT/004/00 00 21.06.22 20.06.27
5 Data Backup IT/005/00 00 21.06.22 20.06.27
6 Logical Security IT/006/00 00 21.06.22 20.06.27
7 Addition and Removal of Authorization IT/007/00 00 21.06.22 20.06.27

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA
POPULAR PHARMACEUTICALS LTD.

SOP List

Safety

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

1 Site Safety Management SF/001/03 03 25.05.19 24.05.24


2 Internal Safety Inspection of Workplace SF/002/04 04 02.12.20 01.12.25
Operation and Maintenance of Fire Detection and Fighting
3 SF/003/04 04 06.01.19 05.01.24
System

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA
POPULAR PHARMACEUTICALS LTD.

SOP List

Training

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

1 Training of Factory Employees TR/001/05 05 29.12.20 28.12.25


2 Assessment of Training Effectiveness TR/002/00 00 13.04.19 12.04.24

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA
POPULAR PHARMACEUTICALS LTD.

SOP List

Administration

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

1 Health Check Programme AD/001/04 04 18.11.20 17.11.25


2 Sickness Reporting AD/002/04 04 18.06.19 17.06.24
3 Pest Control AD/004/08 08 05.05.20 04.05.25
4 Incident Reporting AD/007/02 02 25.05.19 24.05.24
Arrangement of Transport Facilities for Movement of
5 Quality Assuranceand Quality Control Personnel to AD/008/00 00 23.05.21 22.05.26
Hormone Facilities from Quality Assurance/Quality Control
Area and Coming Back from There

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA
POPULAR PHARMACEUTICALS LTD.

SOP List

Warehouse

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

1 Receipt and Storage of Raw Materials WH/001/08 08 01.07.19 30.06.24


2 Receipt and Storage of Packaging Materials WH/002/06 06 01.07.19 30.06.24
3 Issuance of Packaging Materials WH/003/06 06 31.01.20 30.01.25
4 Warehouse Controls WH/005/05 05 04.04.23 03.04.28
Monitoring of Temperature and Relative Humudity in
5 WH/010/09 09 01.03.21 28.02.26
Warehouse
6 Receipt and Storage of API of Cephalosporin WH/014/03 03 01.11.19 31.10.24
7 Receipt and Storage of API of Penicillin WH/015/03 03 01.11.19 31.10.24
Receipt and Storage of Raw Materials for Toll
8 WH/018/03 03 01.02.20 31.01.25
Manufacturing Products
Receipt and Storage of Packaging Materials for Toll
9 WH/020/02 02 30.05.19 29.05.24
Manufacturing Products
10 De-dusting of Incoming Materials at the time of Receiving WH/025/03 03 27.02.23 26.02.28
11 Cleaning of Warehouse WH/026/05 05 29.02.20 28.02.25
Monitoring of Temperature and Relative Humidity in
12 WH/036/05 05 01.03.21 28.02.26
Cephalosporin Store
13 Receipt and Storage of Potent Drug API WH/041/04 04 01.11.19 31.10.24
Issuance of Packaging Materials for Toll Manufacturing
14 WH/044/03 03 31.01.20 30.01.25
Product
Supply of Raw Materials (Toll) from Warehouse to
15 WH/045/01 01 31.10.18 30.10.23
Dispensing Area
Issuance of Raw and Packaging Materials from PPL to
16 WH/046/01 01 06.05.19 05.05.24
GPL Warehouse
Operation, Function Check and Cleaning of Balance-
17 WH/047/01 01 01.01.19 31.12.23
OHAUS 300 Kg [ Model D51P300QX2 ]
18 Cleaning of Warehouse- CT WH/048/01 01 07.07.20 06.07.25
Monitoring of Temperature and Relative Humudity in
19 WH/049/01 01 07.07.20 06.07.25
Warehouse- CT
Operation, Function Check and Cleaning of Warehouse
20 WH/050/01 01 27.02.19 26.02.24
Balance (RFL)
21 Personnel Entry,Exit and Gowning in Warehouse WH/052/01 01 16.02.23 15.02.28
22 Operation and Cleaning of Vacuum cleaner WH/053/00 00 16.03.23 15.03.28
23 Operation and Cleaning of Walk floor scrubber drier WH/054/00 00 16.03.23 15.03.28
24 Operation and Cleaning of Static Pass Box WH/055/00 00 22.06.23 21.06.28

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA
POPULAR PHARMACEUTICALS LTD.

SOP List

Dispensing

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

1 Dispensing of Raw Materials DP/001/06 06 30.08.19 29.08.24


2 Cleaning and Storage of Utensils used for Dispensing DP/002/05 05 06.02.19 05.02.24
Operation, Cleaning and Maintenance of Dispensing Booth
3 DP/003/06 06 30.08.19 29.08.24
[Model CPP 1950]
4 Cleaning of Dispensing Room DP/004/05 05 30.08.19 29.08.24
Personnel Entry/Exit and Gowning Procedure for Dispensing
5 DP/005/05 05 06.02.19 05.02.24
Area
6 Cleaning of Wash Bay of Dispensing Area DP/006/04 04 30.08.19 29.08.24
7 Cleaning of Change Room at Dispensing Area DP/007/04 04 30.08.19 29.08.24
General Procedure for Maintenance and Cleaning of
8 DP/008/04 04 30.08.19 29.08.24
Dispensing Area
Change Over Clearance for the Room for Dispensing of Raw
9 DP/009/04 04 30.08.19 29.08.24
Materials
Operation, Function check, Weighing, Maintenance and
10 DP/013/03 03 06.04.19 05.04.24
Cleaning of Electronic Balance Shimadzu [Model BX32KH]
Operation, Function Check, Weighing, Maintenance and
11 DP/014/03 03 06.04.19 05.04.24
Cleaning of Electronic Balance Shimadzu [Model Tx323 L)
Operation, Function Check, Weighing, Maintenance and
12 Cleaning of Electronic Balance DINI ARGEO DP/015/01 01 06.04.19 05.04.24
[Model PBE 150]

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA
POPULAR PHARMACEUTICALS LTD.

SOP List

Cephalosporins

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

Personnel entry/exit and gowning through Primary Change


1 CP/001/07 07 24.06.23 23.06.28
Room of Manufacturing Area
Personnel entry/exit and gowning through Secondary Change
2 CP/002/06 06 28.10.20 27.10.25
Room of Packaging Area
Operation and Cleaning of Dry Heat Sterilizer, Macofar
3 CP/003/05 05 03.06.20 02.06.25
Model: T600 H1 C1
Operation and Cleaning of Vial Washing Machine, Macofar
4 CP/004/05 05 03.06.20 02.06.25
Model: W600-8
Action taken in case of Power/Air Condition failure during
5 CP/005/05 05 06.06.20 05.06.25
Aseptic Filling
Operation and Cleaning of Autoclave, Celestar Model
6 CP/006/04 04 12.06.20 11.06.25
: Sterimega 350+GVP 100I
Operation and Cleaning of Powder Filling and Stoppering
7 CP/007/05 05 03.06.20 02.06.25
Machine Macofar Model: Micro 9
8 Cleaning and Maintenance of Aseptic Filling Room CP/008/05 05 05.06.20 04.06.25
9 Operation and Cleaning of Pass Box CP/009/05 05 24.05.20 23.05.25
10 Washing of Clean Room Dress CP/010/05 05 05.06.20 04.06.25
Operation and Cleaning of Cap Sealing Machine, Macofar
11 CP/011/03 03 06.06.19 05.06.24
Model: CSP10
Operation and Cleaning of Semi-Automatic Rotary Bottle
12 CP/012/05 05 07.06.20 06.06.25
Washing and Drying Machine, Model: YC-BW-18B
Operation and Cleaning of Automatic Powder Filling Machine,
13 CP/013/05 05 07.06.20 06.06.25
Model: JC-PF-2
Operation and Cleaning of Automatic Cap Sealing Machine,
14 CP/014/05 05 07.06.20 06.06.25
Model: JC-CA
Operation and Cleaning of Hoong-A Blister Packing Machine,
15 CP/015/05 05 23.05.20 22.05.25
(Model: Ministar V6)
Operation and Cleaning of SEJONG Automatic Capsule Filling
16 CP/016/04 04 24.05.20 23.05.25
Machine, (Model: SF-40N)
Operation, Function Check, Maintenance and Cleaning of
17 CP/017/03 03 06.06.19 05.06.24
Dispensing Balance Sartorius [Model EA150FEG-I]
Operation and Cleaning of Cosmec Blender,
18 CP/018/02 02 06.06.19 05.06.24
Model: MBG 20/10 BC
19 Operation and Cleaning of Drum Blender CP/019/02 02 07.06.19 06.06.24
20 Receipt of Raw Materials and Packaging Materials CP/020/02 02 07.06.19 06.06.24
21 Cleaning of Cephalosporin Production Area CP/021/03 03 18.05.23 17.05.28
22 General Procedure for Packing CP/022/02 02 07.06.19 06.06.24
Operation and Cleaning of Rotary Tablet Compression
23 CP/024/03 03 10.01.20 09.01.25
Machine, Model: NRIR-13D

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

8 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Cephalosporins

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

24 Cleaning of Coating Room CP/025/03 03 06.12.19 05.12.24


25 Cleaning of Encapsulation Room CP/026/03 03 06.12.19 05.12.24
26 Cleaning of Compression Room CP/027/03 03 06.12.19 05.12.24
27 Cleaning of Blending Room CP/028/03 03 06.12.19 05.12.24
28 Cleaning of Powder Filling Room CP/029/03 03 06.12.19 05.12.24
29 Cleaning of Mesh CP/030/03 03 15.01.20 14.01.25
30 Operation and Cleaning of Ink Jet Printing Machine CP/031/02 02 15.05.23 14.05.28
31 Visual Inspection of Filled Vials & Ampoules CP/032/02 02 08.05.23 07.05.28
32 Operation of KK & KK (KK-570) Carton Printing Machine CP/033/02 02 14.04.23 13.04.28
Operation, Function Check, Maintenance and Cleaning of
33 CP/034/02 02 11.05.23 10.05.28
Electronic Balance DINI ARGEO [Model PBE 150]
Operation and Cleaning of Hoonga Blister Machine
34 CP/035/02 02 09.03.23 08.03.28
[Model Ministar V6]
35 Cleaning of Vacuum Cleaner CP/036/02 02 16.05.23 15.05.28
Operation, Function Check, Weighing, Maintenance and
36 CP/037/01 01 08.11.18 07.11.23
Cleaning of Electronic Balance Shimadzu [Model TX223L]
Operation, Function Check, Weighing, Maintenance and
37 CP/038/01 01 08.11.18 07.11.23
Cleaning of Electronic Balance Shimadzu [Model TX3202L]
Operation, Function Check, Weighing, Maintenance and
38 CP/039/01 01 08.11.18 07.11.23
Cleaning of Electronic Balance Shimadzu [Model TX323L]
Operation, Function Check, Weighing, Maintenance and
39 Cleaning of Electronic Balance Mettler Toledo CP/040/01 01 08.11.18 07.11.23
[Model PB303-S]
Operation and Cleaning of ETI PACK Vial Labveling
40 CP/041/01 01 13.01.19 12.01.24
Machine, [Model : S1FORIGINAL13]
Operation, Function Check, Maintenance and Cleaning of
41 CP/042/01 01 04.04.20 03.04.25
Electronic Balance NAGATA [Model CYT-12]
42 Operation and Cleaning of Yenchen Film Coating Machine CP/043/01 01 19.04.20 18.04.25
Operation, Function Check, Maintenance and Cleaning of
43 CP/044/00 00 26.09.19 25.09.24
Electronic Balance NAGATA [Model TW-RL10]
Opertion, Function Check, Maintenance and Cleaning pf
44 CP/045/00 00 18.05.20 17.05.25
Electronic Balance Shimadzu [Model TX423L]
45 Operation and Cleaning of Multi Mill CP/046/00 00 26.05.22 25.05.27
Operation and Cleaning of Hologram Sticker Labeling
46 CP/047/00 00 26.12.22 25.12.27
Machine (Model: AL320)
47 Operation & Cleaning of Gansons Comminuting Mill CP/048/00 00 19.01.23 18.01.28
Operation, Function Check, Weighing and Cleaning of
48 Electronic Balance Minebea Intec Combics 3 [Model CP/049/00 00 29.01.23 28.01.28
CAW3P1-150GF-I]

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

9 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Cephalosporins

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

49 Entry/Exit and Cleaning of Shoe Change Room CP/050/00 00 27.02.23 26.02.28

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

10 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Penicillin

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

Operation, Function Check, Maintenance and Cleaning of


1 PN/002/01 01 27.04.19 26.04.24
Electronic Balance Shimadzu [Model TX220L]
Operation and Cleaning of Hauser Auger Semi Auto Powder
2 PN/003/01 01 31.07.20 30.07.25
Filling Machine
Personnel Entry/Exit and Gowning Procedure at Penicillin
3 PN/004/01 01 06.03.19 05.03.24
Facility
Operation and Cleaning of Semi Automatic Cap Sealing
4 PN/005/01 01 31.07.20 30.07.25
Machine
5 Operation & Cleaning of Drum Blender PN/006/01 01 31.07.20 30.07.25
6 Operation & Cleaning of Sifter (Gansons) Machine PN/007/01 01 31.07.20 30.07.25
7 Cleaning of Mesh PN/008/01 01 31.07.20 30.07.25
8 Cleaning of Blending Room PN/009/01 01 31.07.20 30.07.25
9 Cleaning of Encapsulation Room PN/010/01 01 31.07.20 30.07.25
Operation and Cleaning of Pharma Chem Manual
10 PN/011/01 01 31.07.20 30.07.25
Encapsulation Machine (Model-SS-316)
11 Operation and Cleaning of Automatic Capsule Loader PN/012/01 01 31.07.20 30.07.25
12 Operation and Cleaning of Double Cone Blender PN/013/01 01 31.07.20 30.07.25
13 General Procedure of Manufacturing at Penicillin Facility PN/014/01 01 31.07.20 30.07.25
14 General Cleaning of Production Floor PN/015/01 01 31.07.20 30.07.25
Street Shoe Change Before Entry/Exit through Main Door &
15 PN/016/00 00 01.03.19 29.02.24
Gowning Through Primary Change Room of Penicillin Area
Operation and Cleaning of Automatic Injectable Powder
16 PN/017/00 00 24.12.18 23.12.23
Filliing and Rubber Stoppering Machine

17 PN/019/00 00 05.01.19 04.01.24


Operation and Cleaning of PyroMega Autoclave Model : 1000
18 Cleaning and Disinfection of Penicillin Area PN/020/00 00 25.12.18 24.12.23
Operation, Function Check, Maintenance and Cleaning of
19 PN/021/00 00 05.01.19 04.01.24
Dispensing Balance Shimadzu [Model TX323L]
20 Visual Inspection of Filled Vials PN/022/00 00 27.12.18 26.12.23
Action Taken in Case of Power/Air Condition Failure for
21 PN/023/00 00 28.12.18 27.12.23
Pennicillin Filling Area
Cleaning of Process related Equipments and Contact Parts
22 PN/024/00 00 05.01.19 04.01.24
of Filling and Stoppering Matchine
23 General Packaging in Penicillin Area PN/025/00 00 28.12.18 27.12.23
Operation, Function Check, Weighing, Maintenance and
24 Cleaning of Electronic Weighing Balance Jadever [Model JWI- PN/027/00 00 05.01.19 04.01.24
700W]
25 Operation and Cleaning of Multi mill PN/028/00 00 12.01.19 11.01.24

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

11 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Penicillin

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

Personnel Entry/Exit and Gowning through Filling Area


26 PN/029/00 00 01.03.19 29.02.24
Change Room
27 General Housekeeping of Penicillin Packaging Area PN/030/00 00 28.02.19 27.02.24
28 General Filling Inspection And Packaging in Penicillin Area PN/031/00 00 01.03.19 29.02.24
Operation and Cleaning of Vial cap Sealing Machine ,Mark
29 PN/032/00 00 02.03.19 01.03.24
Industries Model:PPM-35
30 Disposal of Rejected Penicillin Powder Filled Vials PN/033/00 00 28.02.19 27.02.24
Operation and Cleaning of Dispensing Booth at Penicillin
31 PN/034/00 00 06.03.19 05.03.24
Facility
Operation and Cleaning of Bottle Washing and Bottle Dryer
32 PN/035/00 00 05.03.19 04.03.24
Machine at Penicillin Facility
Operation of PG (PZ-40) Encapsulation Machine at Peniccilin
33 PN/036/00 00 11.03.21 10.03.26
Facility
Cleanining of PG (PZ-40) Encapsulation Machine at Peniccilin
34 PN/037/00 00 11.03.21 10.03.26
Facility
Operation and Cleaning of Automatic Vertical Ultrasonic Vial
35 PN/038/00 00 05.06.22 04.06.27
Washing Machine, Model: QCL-60
Operation and Cleaning of Automatic Sicker Labeling
36 PN/039/00 00 02.06.22 01.06.27
Machine, Model: TB-200
Operation and Cleaning of Celester Autoclave Model: SM
37 PN/040/00 00 07.07.22 06.07.27
350+GVP 100I

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

12 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

LVP

Sl Revision Effective Review


Title SOP No.
No. No. Date Date

1 General Activity in LVP Clean Room IV/001/04 04 08.09.18 07.09.23


2 Dress Selection for Clean Room IV/002/05 05 29.04.20 28.04.25
Personnel Entry/Exit & Gowning through Manufacturing Change
3 IV/003/06 06 04.04.19 03.04.24
Room
4 Operation of Air Shower IV/004/03 03 31.08.18 30.08.23
5 Cleaning of Clean Area IV/005/03 03 10.08.18 09.08.23
6 Preperation of Cleaning Solution IV/006/04 04 09.08.18 08.08.23
7 Dispensing of Raw Materials IV/007/04 04 31.08.18 30.08.23
8 Operation and Cleaning of Dispensing Booth IV/008/03 03 31.08.18 30.08.23
9 Operation & Cleaning of Digital Electronic Weighing Balances IV/009/04 04 31.08.18 30.08.23
Manufacturing of LVP Products in 3500 Liter manufacturing
10 IV/010/05 05 29.04.20 28.04.25
Vessel
11 Operation and Cleaning of 3500 Liter Manufacturing Vessel IV/011/04 04 24.08.18 23.08.23
CIP and SIP of 3500 Liter Manufacturing Vessel, Filter Line and
12 IV/012/04 04 24.08.18 23.08.23
Product Transfer Line and 100 Liter Buffer Tank
Operation and Changeover of Bag Form-Fill-Seal Machine
13 IV/014/04 04 24.08.18 23.08.23
Plumat Model No. FFS892; ID. No. : 560-LVP-419-01
14 CIP and SIP of Bag Form Fill Seal Machine IV/015/04 04 25.08.18 24.08.23
Orientation of Different Types LVP Bags, Bottles & Vials in
15 IV/017/03 03 30.08.18 29.08.23
Autoclave Trays and Trolley
16 Visual Inspection of LVP Products IV/019/03 03 25.08.18 24.08.23
17 Flushing of PW & WFI at User Point IV/020/04 04 31.08.18 30.08.23
Operation and Cleaning of 500 Liter Manufacturing Vessel,
18 IV/021/03 03 25.08.18 24.08.23
Id: 460-LVP-493-01
19 General Guideline for Packaging Area IV/022/03 03 26.08.18 25.08.23
Personnel Entry/Exit and Gowning through Packaging Change
20 IV/024/08 08 16.03.23 15.03.28
Room
21 Cleaning of Packaging Area IV/025/03 03 26.08.18 25.08.23
22 Dispensing of Packaging Materials IV/026/03 03 26.08.18 25.08.23
23 Packaging Instruction of Individual Bulk Product IV/027/03 03 26.08.18 25.08.23
24 Operation of Visual Inspection Conveyor IV/029/04 04 26.08.18 25.08.23
25 Overbag Wrapping and Leaflet Inserting IV/030/04 04 28.08.18 27.08.23

Prepared By: Checked By: Approved By:

Md. shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

13 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

LVP

Sl Revision Effective Review


Title SOP No.
No. No. Date Date

26 Operation of Bag Overwraping Conveyor IV/031/04 04 28.08.18 27.08.23


27 Operation of Overbag Sealing Machine IV/032/03 03 28.08.18 27.08.23
28 Inner Cartoning, Master Cartoning and Palleting IV/033/04 04 28.08.18 27.08.23
29 LVP Equipment and Room Cleaning Usage Logbook IV/035/03 03 31.08.18 30.08.23
30 CIP and SIP of 50 Liter Manufacturing Vessel IV/036/04 04 28.08.18 27.08.23
31 CIP and SIP of 500 Liter Manufacturing Vessel and Filter Line IV/037/04 04 28.08.18 27.08.23
CIP and SIP of 500 Liter Storage Vessel and Product Transfer
32 IV/038/04 04 28.08.18 27.08.23
Line
33 CIP and SIP of Plumat Filling Machine Id No. 556-AMN-593-01 IV/039/04 04 28.08.18 27.08.23
Operation of 500 Liter and 50 Liter Manufacturing Vessel
34 IV/040/04 04 28.08.18 27.08.23
(Amiono Acid)
35 Manufacturing of LVP Products (Amino Acid) IV/041/04 04 28.08.18 27.08.23
36 Operation of Bottle Washing Machine IV/042/04 04 28.08.18 27.08.23
Filling, Rubber Stoppering and Flip off Sealing Operations of
37 IV/043/04 04 28.08.18 27.08.23
Amino Acid
38 Dispensing of Fat Emulsion Raw Materials IV/044/04 04 27.08.18 26.08.23
CIP and SIP of Fat Emulsion Manufacturing Vessel and Filter
39 IV/045/04 04 27.08.18 26.08.23
Line
40 CIP and SIP of Fat Emulsion Filling and Cap Sealing Machine IV/046/04 04 29.08.18 28.08.23
41 Manufacturing Operations of Fat Emulsion IV/047/04 04 29.08.18 28.08.23
42 Operation and Cleaning of Homogenizer IV/048/04 04 29.08.18 28.08.23

43 Operation and Cleaning of PDC Filling and Cap Sealing Machine IV/049/04 04 29.08.18 28.08.23

Cleaning of Manufacturing Vessels, Filter Unit, Product Transfer


44 IV/051/02 02 30.08.18 29.08.23
Line and Filling Machine during Product Change Over
Operation and Cleaning of Ambica Vial Filling, Rubber
45 Stoppering and Cap Sealing Machine, Id: 560-AMN-417-02 and IV/052/04 04 30.08.18 29.08.23
560-AMN-417-01
Operation and Cleaning of Celester Autoclave Model : SM
46 IV/053/04 04 30.08.18 29.08.23
350+GVP 100I, Id: 590-LVP-423-01
Operation and Cleaning of Pyromega Autoclave Model : 1000,
47 IV/054/04 04 30.08.18 29.08.23
Id: 490-LVP-424-01

Prepared By: Checked By: Approved By:

Md. shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

14 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

LVP

Sl Revision Effective Review


Title SOP No.
No. No. Date Date

Operation and Cleaning of Vial Washing Machine, Ambica Model


48 IV/055/04 04 30.08.18 29.08.23
: ARVW-120,Id: 590-LVP-422-01
General Procedure of PVC bag Receiving, Carrying and Return
49 IV/056/03 03 30.08.18 29.08.23
from Bag Making area to Filling Area
50 Operation and Cleaning of Desktop Filling Machine IV/057/03 03 31.08.18 30.08.23
51 General Procedure for LVP Manufacturing IV/058/03 03 31.08.18 30.08.23
Infusion Wastage, Reject Packaging Materials, Product
52 IV/059/03 03 22.03.20 21.03.25
Management and Disposal System
CIP and SIP of 500 Liter Manufacturing Vessel , Id: 460-LVP-
53 IV/060/03 03 01.09.18 31.08.23
491-02, Filter Line and Product Transfer Line
Operation and Cleaning of DN Semi Automatic Washing
54 IV/061/03 03 01.09.18 31.08.23
Machine, Model XP-60
55 Operation and Cleaning of Ambica Glue Labeling Machine IV/062/02 02 01.09.18 31.08.23
56 Operation and Cleaning of Image Printer/Ink jet Printer IV/063/02 02 04.09.18 03.09.23
57 Operation and Cleaning of CVC Printing Machine IV/064/02 02 04.09.18 03.09.23
Personnel Entry/Exit & Gowning through Bag Making Change
58 IV/065/02 02 02.09.18 01.09.23
Room
59 Cleaning of Bag Making and Storage Area IV/066/02 02 02.09.18 01.09.23
60 General Guide Line for Bag Making and Storage Room IV/067/02 02 02.09.18 01.09.23
Handling of Production Operations in case of Power/HVAC
61 IV/068/02 02 03.09.18 02.09.23
Failure
Operation and Cleaning of High Frequency Plastic Welding
62 IV/069/02 02 03.09.18 02.09.23
Machine
Operation and Cleaning of Automatic Single Head Cap Sealing
63 IV/070/01 01 21.12.19 20.12.24
Machine, Model No. : MPEC-40
Operation and Cleaning of Automatic Wet Glue Labeling
64 IV/071/01 01 21.12.19 20.12.24
Machine, Model No. : MPEL-150
65 Operation and Cleaning of Filter Dryer Oven IV/072/01 01 21.03.20 20.03.25
Trolley Evacuation and Palleting Procedure after Terminal
66 IV/073/01 01 21.03.20 20.03.25
Sterilization
Personnel Entry/Exit and Gowning Through Bottle/Vial Washing
67 IV/074/01 01 04.04.19 03.04.24
Change Room
68 Washing of Rubber Stopper and Stopper for Infusion Bag IV/075/01 01 12.04.20 11.04.25
Calibration, Operation & Cleaning of pH Meter of Mettler Toledo
69 IV/076/00 00 05.04.19 04.04.24
Model S210

Prepared By: Checked By: Approved By:

Md. shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

15 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

LVP

Sl Revision Effective Review


Title SOP No.
No. No. Date Date

Operation and Cleaning of Palltronic Flow Star Tester in LVP


70 IV/077/01 01 21.06.23 20.06.28
Facility, Model :IVFFS04S
71 Operation and Cleaning of Drucker Inkjet Printer IV/078/00 00 13.11.19 12.11.24
72 Operation and Cleaning of 4000 Liter Manufacturing Vessel IV/079/00 00 05.01.20 04.01.25

CIP, SIP and Operataion of Plumat PVC Bag Filling and Sealing
73 IV/080/00 00 03.01.21 02.01.26
Machine, Model No.: 410-LVP-419-02 and 410-LVP-419-03
74 Operation and Cleaning of Dynamic Pass Box IV/081/00 00 03.03.21 02.03.26
Operation of Superheated Water Spray Autoclave, Model:
75 IV/082/01 01 25.06.23 24.06.28
FOW8/L; ID: 420-LVP-423-03
Operation and Cleaning of Sanamij Autoclave Model: SAR
76 IV/083/00 00 10.02.22 09.02.27
6.6.17-2V, ID No.: 420-AMN-423-04

Prepared By: Checked By: Approved By:

Md. shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

16 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Potent Drug

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

Personnel Entry/Exit and Gowning Procedure for Potent Drug


1 PT/001/03 03 25.04.19 24.04.24
Facility Manufacturing Area
Visitor Entry, Exit & Gowning Procedure in Potent Drug
2 PT/002/03 03 29.01.19 28.01.24
Facility
Change Over Clearance for The Room for Dispensing of Raw
3 PT/003/03 03 29.01.19 28.01.24
Materials
4 Dispensing of Raw Materials PT/004/03 03 29.01.19 28.01.24
5 Cleaning of Dispensing Room PT/005/03 03 29.01.19 28.01.24
6 Cleaning and Storage of Utensils Used for Dispensing PT/006/03 03 29.01.19 28.01.24
7 General Cleaning of Poroduction Floor PT/007/03 03 29.01.19 28.01.24
Jupitar Pressure Hood Gowning Procedure for Potent Drug
8 PT/008/03 03 01.02.19 31.01.24
Facility
9 General Procedure for Manufacturing of Potent Drug PT/009/03 03 29.01.19 28.01.24
10 Cleaning of Granulation Room PT/010/03 03 29.01.19 28.01.24
11 Operation of GHL High Speed Mixer Granulator PT/011/03 03 29.01.19 28.01.24
12 Cleaning of GHL High Speed Mixer Granulator PT/012/03 03 29.01.19 28.01.24
13 Operation of Rotary Tablet Press GRC-15S Machine PT/016/02 02 19.12.19 18.12.24
14 Operation and Cleaning of Cone Blender PT/017/03 03 29.01.19 28.01.24
15 Cleaning of Rotary Tablet Press GRC-15S Machine PT/018/02 02 19.12.19 18.12.24
16 Cleaning of Compression Room PT/019/03 03 29.01.19 28.01.24
17 Cleaning & Storage of Dies and Punches PT/022/03 03 29.01.19 28.01.24
18 Cleaning of Coating Room PT/023/03 03 29.01.19 28.01.24
19 Cleaning of Utensils used in Potent Drug Facilities PT/026/03 03 29.01.19 28.01.24
20 Cleaning of Cleaning Utensils PT/027/03 03 29.01.19 28.01.24
21 General Procedure For Packing PT/028/04 04 23.02.23 22.02.28
General procedure for Packaging Materials Receiving &
22 PT/029/03 03 29.01.19 28.01.24
Return
Operation & Cleaning of Hoonga HM V6 Blister Packing
23 PT/030/04 04 16.03.23 15.03.28
Machine
24 On line Checking of Blister Strips PT/031/03 03 29.01.19 28.01.24
Waste Management & Disposal Procedure for Potent Drug
25 PT/032/03 03 29.01.19 28.01.24
Facility
26 Handling of Intermediate and bulk Product PT/033/03 03 29.01.19 28.01.24
27 Material (Raw & Packaging) Handling of Potent Drug Facility PT/034/03 03 25.04.19 24.04.24
Operation, Function Check, Maintenance and Cleaning of
28 PT/038/02 02 29.01.19 28.01.24
Electronic Balance SHIMADZU, Model: BX 32KH
Entry, Exit and Gowning through Hormone Injection
29 PT/040/03 03 12.07.19 11.07.24
Manufacturing Facility

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

17 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Potent Drug

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

Entry, Exit and Gowning for Hormone Injection Packaging


30 PT/041/03 03 22.07.19 21.07.24
Area
31 Cleaning and Disinfection of Hormone Injection Facility PT/042/03 03 28.03.23 27.03.28
Operation and Cleaning of Shinva Moist Heat Sterilizer
32 PT/044/03 03 04.03.19 03.03.24
(Autoclave), Model: XG1-DTX-0.36
Operation and Cleaning of Automatic Vertical Ultrasonic Vial
33 PT/045/03 03 02.02.23 01.02.28
Washing Machine; Model: QCL-60
Operation and Cleaning of Depyrogenation Tunnel,
34 PT/046/03 03 06.02.23 05.02.28
Model : ASMR620/38
Operation and Cleaning of Shinva Moist Heat Sterilizer
35 PT/049/03 03 04.03.19 03.03.24
(Autoclave), Model: XG1-DTE-0.6B
Management of Machine Breakdown, Power Failure and
36 PT/050/03 03 11.04.23 10.04.28
Enviornmental Condition Out of Specification
37 Cleaning and Sterilization of utensils and accessories PT/051/04 04 17.05.23 16.05.28
38 Filter Management Procedure PT/052/03 03 11.04.23 10.04.28
Decartoning, Visual Inspection and Arrangement of Empty
39 PT/053/04 04 04.11.21 03.11.26
Glass Vial in SS Cassette
40 Visual Inspection of Filled Vials and Ampoules PT/054/03 03 07.05.19 06.05.24
Operation and Cleaning of filter integrity tester (Model:
41 PT/055/02 02 30.01.23 29.01.28
Sartocheck 4 Plus 26288)
Cleaning, Function Check,Operation and Calibration of
42 PT/056/03 03 02.05.23 01.05.28
Weighing Balance
43 Garments Management Procedure PT/058/03 03 13.05.23 12.05.28
44 Personnel Hygiene in Hormone Facility PT/060/03 03 11.04.23 10.04.28
45 Cleaning and Operation of Dynamic Pass Box PT/061/05 05 17.05.23 16.05.28
46 Management of Primary Packing Material PT/063/03 03 13.05.23 12.05.28
47 Handling and Storage of Filled Vials and Ampoules PT/064/03 03 13.05.23 12.05.28
48 Cleaning and Operation of Laminar Air Flow Unit PT/065/03 03 09.05.23 08.05.28
49 Receiving of Packaging Materials in Hormone Injection Facility PT/066/03 03 01.03.23 29.02.28
50 Preparation and Sterilization of Disinfectant Solution PT/069/03 03 13.03.21 12.03.26
Cleaning ,Sterilization and Operation of Ritai 100 Liter
51 PT/073/03 03 02.05.23 01.05.28
Manufacturing Vessel, Model: 10P0860
Cleaning ,Sterilization and Operation of Ritai 50 Liter
52 Manufacturing Vessel (Model: 10P0859) and Storage Vessel PT/074/03 03 02.05.23 01.05.28
(Model: 10P862)

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

18 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Potent Drug

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

Cleaning ,Sterilization and Operation of Ritai 30 Liter


53 PT/075/03 03 15.05.23 14.05.28
Manufacturing Vessel, Model: RT-30L
54 Operation and Cleaning of Oven, Model: JSON-100 PT/077/03 03 16.01.23 15.01.28
55 Disposal of Rejected Hormone Injections (Vials/Ampoules) PT/078/02 02 25.09.18 24.09.23
56 Operation and Cleaning of Sterile Dress Cabinet PT/079/02 02 07.02.23 06.02.28
57 Reconciliation of Packaging Materials PT/082/02 02 17.02.23 16.02.28
Operation, Cleaning and Serilization Procedure of Tofflon
58 PT/083/02 02 23.02.23 22.02.28
Lyophilizer; Model : Lyo-2
59 Cleaning & Operation of Double Cone Blender (850 L) PT/088/02 02 16.05.23 15.05.28
Operation, Function check, Maintenance and
60 Cleaning of Electronic Weighing Balance Jadever (Model JWI- PT/089/01 01 21.07.19 20.07.24
700W)
Operation, Function Check, Weighing, Maintenance and
61 PT/090/01 01 31.03.20 30.03.25
Cleaning of Electronic Balance Shimadzu (Model TX223L)
Operation and Cleaning of Rota Ampoule Filling and Sealing
62 PT/091/01 01 04.04.20 03.04.25
Machine (R921 MA/20)
Storage and Handling of Cold Chain API and Intermediate
63 PT/092/01 01 08.07.20 07.07.25
Lyophilized Hormone Injections
Operation of Pharma Flex Pharma Flex Tablet De-Duster
64 PT/094/01 01 23.05.20 22.05.25
with Metal Detector
Cleaning of Pharma Flex Tablet De-Duster with Metal
65 PT/095/01 01 23.05.20 22.05.25
Detector
66 Operation of Fette Compacting 3200i Machine PT/096/01 01 23.05.20 22.05.25
67 Cleaning of Fette Compacting 3200i Machine PT/097/01 01 23.05.20 22.05.25
Operation of Sejong Automatic Coating Machine
68 PT/098/01 01 29.05.20 28.05.25
SFC-170FSH
69 Cleaning of Sejong Coating Machine SFC-170FSH PT/099/01 01 29.05.20 28.05.25
70 Operation of NR Automatic Film Coating Machine FC-29 PT/100/01 01 25.07.20 24.07.25
71 Cleaning of NR Automatic Film Coating Machine PT/101/01 01 25.07.20 24.07.25
Operation, Function Check, Weighing, Maintenance and
72 PT/102/01 01 20.08.20 19.08.25
Cleaning of Electronic Balance Shimadzu (Model TX323L)
73 Operation and Cleaning of Sifter (Gansons) Machine PT/103/01 01 30.11.20 29.11.25
74 Operation and Cleaning of Multi Mill PT/104/01 01 30.11.20 29.11.25
75 Operation and Cleaning of Drum Blender PT/105/01 01 30.11.20 29.11.25
Operation, Function Check, Weighing, Maintenance and
76 Cleaning of Electronic Balance NAGATA PT/106/01 01 30.11.20 29.11.25
(Model KW-303-RL15)
Personnel Entry/Exit and Gowning Procedure for Oral Solid
77 PT/107/01 01 11.04.23 10.04.28
Hormone Facility Packing Area

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

19 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Potent Drug

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

78 Cleaning and Management of Mesh used in Hormone Solid FaciPT/109/02 02 19.01.23 18.01.28
79 Cleaning, Sterilization and Operation of Pressure Vessels PT/110/01 01 24.05.23 23.05.28
Operation and Cleaning of Pouch Sealing Machine,
80 PT/111/00 00 01.11.18 31.10.23
Model: BF 900
81 Operation and Cleaning of Uhlmann Blister Packing Machine PT/112/00 00 25.03.19 24.03.24
Operation and Cleaning of ROTA Vial Filling and Stoppering
82 PT/114/00 00 09.09.19 08.09.24
Machine, Model: FLL201/G
Operation and Cleaning of ROTA Vial Capping & Crimping
83 PT/115/00 00 09.09.19 08.09.24
Machine, Model: FLR201/B
Operation and Cleaning of Laminar Air Flow (LAF) Unit of
84 PT/116/00 00 09.09.19 08.09.24
Rota Vial Filling & Capping Machine
Cleaning, Sterilization and Operation of 150 Lit. Manufacturing
85 PT/117/00 00 30.01.20 29.01.25
& Storage Vessels
86 File Numbering Procedure in Hormone Injection Facility PT/118/00 00 16.03.21 15.03.26
Operation, Calibration, Function Check and Cleaning of
87 PT/120/00 00 21.03.21 20.03.26
Analytical Balance Sartorius [Model CP323 S]
88 Operation and Cleaning of Biosafety Cabinet PT/121/00 00 11.05.21 10.05.26
Operation and Cleaning of Sunjin Automatic Ampoule/ Vial
89 PT/122/00 00 04.11.21 03.11.26
Labeling Machine
Operation and Cleaning of Hologram Sticker Labelling
90 PT/123/00 00 13.04.22 12.04.27
Machine (Model : AL320)
91 Operation and Cleaning of Packing Conveyar Belt PT/124/00 00 06.02.23 05.02.28
92 Cleaning and Operation of Ink Jet Printer (VIDEOJET) PT/125/00 00 15.05.23 14.05.28
93 Collection and Storage Procedure of Purified Water PT/126/00 00 30.05.23 29.05.28

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

20 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Oral Solid

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

Entry & Exit procedure at Oral Solid Manufacturing Area for


1 SL/001/06 06 16.03.23 15.03.28
Non-Management Staff
Entry & Exit procedure at Oral Solid Manufacturing Area for
2 SL/003/06 06 16.03.23 15.03.28
Management Staff
Cleaning procedure of manufacturing and primary packaging
3 SL/004/06 06 16.03.23 15.03.28
area of Granulation Area
4 Operation of Sejong MRC 37 D Compression Machine SL/006/05 05 01.10.19 30.09.24
Operation of Automatic Tablet Counting & Filling Machine
5 SL/007/05 05 14.12.20 13.12.25
JB-32A
6 Operation of Automatic Cap Sealing Machine JC-SP SL/008/05 05 14.12.20 13.12.25
7 Cleaning of Sejong Compression Machine MRC 37 D SL/009/05 05 11.10.19 10.10.24
8 Operation of Super Mixer Granulator (SMG) SL/012/05 05 25.10.18 24.10.23
9 Cleaning of Super Mixer Granulator (SMG) SL/013/06 06 16.03.23 15.03.28
Operation of Sejong Automatic Coating Machine SFC-130
10 SL/022/04 04 05.11.18 04.11.23
FSN
11 Operation and Cleaning of Drum Blender SL/027/05 05 16.03.23 15.03.28
12 Operation and Cleaning of Cosmec Blender SL/028/04 04 10.12.18 09.12.23
Operation and cleaning of Noack-921 Blister Machine
13 SL/029/05 05 16.03.23 15.03.28
(Model:921)
14 Cleaning of Sejong Coating Machine SFC-130 FSN SL/030/04 04 22.07.19 21.07.24
15 Operation of Pam- Glatt Fluid Bed Processor FBE-250 SL/031/04 04 25.10.18 24.10.23
16 Operation of NR High Speed Mixer Granulator (M-65) SL/032/04 04 02.09.16 01.09.24
17 Operation of Fluid Bed Drye (NR) Machine SL/034/04 04 30.09.19 29.09.24
18 Cleaning of NR Fluid Bed Dryer (FB-65) SL/035/04 04 04.04.19 03.04.24
19 Operation of Zanasi 40 F Encapsulation Machine SL/037/04 04 20.10.19 19.10.24
20 Cleaning of Zanasi 40 F Encapsulation Machine SL/038/04 04 20.10.19 19.10.24
Cleaning of Automatic Tablet Counting & Filling Machine
21 SL/044/04 04 02.10.19 01.10.24
JB-32A
22 Cleaning and Storage of Fluid Bed Dryer Filter Bag SL/046/04 04 22.11.18 21.11.23
23 Cleaning, Storage and Issue of Dies and Punches SL/048/05 05 19.04.23 18.04.28
24 Operation & Cleaning of Gansons Comminuting Mill SL/050/03 03 07.12.18 06.12.23
25 Handling of FBD Filter Bag SL/052/05 05 19.04.22 18.04.27
26 Cleaning of Utensils in Oral Solid Manufacturing Area SL/053/04 04 12.02.20 11.02.25
27 Cleanliness and Management of Wash Bay SL/059/04 04 21.06.23 20.06.28
General Procedure of Manufacturing at Oral Solid
28 SL/064/04 04 01.06.20 31.05.25
Manufacturing Area
29 General Procedure for Packaging SL/065/03 03 23.09.19 22.09.24
Operation and Cleaning of ALL FILL Semi Auto Powder Filling
30 SL/070/03 03 01.04.19 31.03.24
Machine

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

21 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Oral Solid

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

Operation and Cleaning of Semi Automatic Cap Sealing


31 SL/071/03 03 01.04.19 31.03.24
Machine
32 Cleaning of Single Rotary Tableting Machine Clit CPMD3-16 SL/073/03 03 07.12.18 06.12.23
33 Operation and Cleaning of Metal Detector Machine SL/075/03 03 03.06.19 02.06.24
34 Die-Punch Checking and Polishing Procedure SL/076/03 03 03.06.19 02.06.24
35 Application of Cleaning and Disinfectant Agent SL/077/03 03 03.06.19 02.06.24
36 Operation & Cleaning of Sifter (Gansons) Machine SL/078/03 03 30.09.18 29.09.23
37 Cleaning of Mesh SL/079/03 03 07.06.19 06.06.24
38 Operation and Cleaning of Image Jet Printing Machine SL/080/03 03 01.10.19 30.09.24
39 Operation and Cleaning of KK & KK Auto Labeling Machine SL/081/03 03 01.10.19 30.09.24
Operation and Cleaning of Capsule and Tablet Inspection
40 SL/082/03 03 07.06.19 06.06.24
Machine
41 Manual Cleaning and Storage of Fluid Bed Dryer Filter Bag SL/083/02 02 02.10.18 01.10.23
42 Cleaning of Vacuum Cleaner SL/084/03 03 07.06.19 06.06.24
43 Operation and Cleaning of Documents Pass Box SL/085/03 03 04.09.19 03.09.24
Waste Management and Disposal of Oral Solid Manufacturing
44 SL/086/03 03 01.10.19 30.09.24
and Packaging Area
45 Operation and Cleaning of Materials Pass Box SL/090/03 03 04.09.19 03.09.24
46 Maintenance and Cleaning of UV Insect Killer SL/091/04 04 16.03.23 15.03.28
Personnel Entry/Exit and Gowning for Secondary Packaging
47 SL/092/03 03 06.02.19 05.02.24
Area For Employee
48 Cleaning and Maintenance of Empty Drum SL/093/03 03 01.10.19 30.09.24
16.01.20
49 On line Weighing of Finished Pack SL/094/03 03 15.01.25
18.01.14
50 Operation of KK & KK (KK-570) Carton Printing Machine SL/095/03 03 01.10.19 30.09.24
51 Operation of Sejong Compression Machine MRC 61D SL/096/04 04 18.05.20 17.05.25
52 Cleaning of Sejong Compression Machine MRC 61D SL/097/04 04 18.05.20 17.05.25
Operation Function Check, Weighing, Maintenance and
53 Cleaning of Electronic Balance DINI ARGEO SL/106/02 02 17.04.19 16.04.24
(Model PBE 150)
54 Operation and Cleaning of Conveyor Belt SL/111/03 03 14.11.20 13.11.25
55 General Cleaning of Primary Packaging Area SL/113/02 02 03.09.19 02.09.24
56 Operation & Cleaning of Multi Mill SL/114/02 02 03.09.19 02.09.24
57 Operation & Cleaning of Cone Mill SL/115/02 02 03.09.19 02.09.24
58 Operation and Cleaning of Automatic Capsule Loader SL/116/02 02 03.09.19 02.09.24
Operation and Cleaning of Hoong-A Packing Machine,
59 Oeration and Cleaning of Pharma Chem Manual SL/118/02 02 01.01.19 31.12.23
(Model : Ministar V6)
Encapsulation Machine (Model SS-316)
60 SL/119/02 02 20.08.19 19.08.24

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

22 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Oral Solid

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

Operation Function Check Weighing Maintenance and


61 SL/120/02 02 17.04.19 16.04.24
Cleaning of Electronic Balance NAGATA TW- 702- RL10
62 Operation of Cadmach CMD4-20 Compression Machine SL/121/02 02 15.12.19 14.12.24
63 Cleaning of Cadmach CMD4-20 Compression Machine SL/122/02 02 15.12.19 14.12.24
Operation of Sejong Automatic Coating Machine
64 SL/123/02 02 13.02.20 12.02.25
SFC-150 FSN
65 Cleaning of Sejong Coating Machine SFC-150 FSN SL/124/02 02 13.02.20 12.02.25
Operation, Function check, weighing, Maintenance and
66 SL/125/02 02 17.04.19 16.04.24
Cleaning of Electronic Balance Shimadzu (Model TX323L)
67 Cleaning and Operation of Alliance Fluid Bed Dryer SL/132/02 02 20.06.23 19.06.28
Bottle Drying and Transfer Procedure of Powder for
68 SL/134/01 01 06.02.19 05.02.24
Suspension
69 Cleaning of NR High Speed Mixer Granulator (M-65) SL/135/01 01 19.07.20 18.07.25
70 Operation and Cleaning of Minitouch Printing Machine SL/136/01 01 20.11.20 19.11.25
71 Cleaning and Operation of Pharmalab Auto Labeling Machine SL/137/01 01 31.05.23 30.05.28
72 Operation and Cleaning of Tablet de-duster SL/138/00 00 07.02.19 06.02.24
Personnel Entry/Exit and Gowning for Secondary Packaging
73 SL/139/00 00 07.02.19 06.02.24
Area For Management Staff
74 Operation and Cleaning of Hoonga Auto Cartoning Machine SL/142/00 00 15.07.20 14.07.25
Operation and Cleaning of Harro Hofliger Capsule Filling
75 SL/143/00 00 06.03.21 05.03.26
Machione
Operation and Cleaning of Hologram Sticker Labeling
76 SL/144/00 00 16.03.21 15.03.26
Machine (Model: AL320)
Operation and Cleaning of Glatt High Shear Granulator &
77 Fluid Bed Processor SL/145/00 00 30.12.21 29.12.26
78 Operation and Cleaning of Uhlmann Blister Packing Machine SL/146/00 00 03.07.21 02.07.26
79 Operation and Cleaning of Uhlmann Cartoner Machine SL/147/00 00 03.07.21 02.07.26
Operation and Cleaning of Monoblock Rotary Liquid Filling
80 SL/148/00 00 30.12.21 29.12.26
and Capping Machine
Operation and Cleaning of Romaco Kilian K 720 Compression
81 SL/149/00 00 30.12.21 29.12.26
Machine
Glatt PanDics
82 Operation and Cleaning of Portable Coater
typeGCSi 700 mixer
Agitator SL/150/00 00 16.06.22 15.06.27
83 syatem SL/151/00 00 16.03.23 15.03.28

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

23 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Sachet

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

1 General Procedure for Manufacturing of Sachet Facility SH/001/04 04 15.12.20 14.12.25


2 Cleaning of Manufacturing Area SH/002/04 04 15.12.20 14.12.25
3 Operation and Cleaning of Tumbling Mixer SH/003/03 03 11.03.19 10.03.24
4 Operation of SOLPAC Automatic Sachet Filling Machine SH/006/03 03 23.02.20 22.02.25
5 Cleaning of SOLPAC Automatic Sachet Filling Machine SH/007/03 03 10.03.20 09.03.25
6 On line Cheking of Sachet SH/008/03 03 22.07.19 21.07.24
7 General Procedure for Packaging of Sachet SH/009/05 05 18.01.23 17.01.28
Operation, Function check, Maintenance and
8 SH/012/02 02 22.03.20 21.03.25
Cleaning of TAWANKA Balance (Model TWP)
Operation of SOLPAC Automatic (Six Cutter) Sachet Filling
9 SH/014/02 02 23.03.20 22.03.25
Machine
Cleaning of SOLPAC Automatic (Six Cutter) Sachet Filling
10 SH/015/02 02 14.08.20 13.08.25
Machine
11 Cleaning of Sieve SH/016/01 01 14.02.19 13.02.24
12 Operation & Cleaning of Shifter (Gansons) Machine SH/017/01 01 14.02.19 13.02.24
Operation and Cleaning of KK & KK (KK-570) Carton Printing
13 SH/018/00 00 03.03.19 02.03.24
Machine
14 Operation and Cleaning of Conveyor Belt SH/019/00 00 19.09.19 18.09.24
15 Control and Issuance Of Log books SH/020/00 00 10.10.19 09.10.24
16 Waste Management of Sachet Facility SH/021/00 00 30.10.19 29.10.24
Monitoring of Temperature and Relative Humidity in Sachet
17 SH/022/00 00 08.04.20 07.04.25
Facility
18 Entry, Exit Procedure at ORS Manufacturing Area SH/023/01 01 31.05.23 30.05.28
19 Receive and Return of Packing Materials SH/024/00 00 13.12.20 12.12.25
20 Cleaning of Secondary Packing Area SH/025/00 00 15.12.20 14.12.25
21 Operation and Cleaning of BIN Blender-1000L SH/026/01 01 31.05.21 30.05.26
22 Operation, Cleaning and Maintenance of Dispensing Booth SH/027/00 00 03.01.21 02.01.26
23 Cleaning and Storage of Utensils SH/028/00 00 03.01.21 02.01.26
Operation, Function Check, Maintenance and
24 SH/029/00 00 03.01.21 02.01.26
Cleaning of Sartorius [Model: Minebea Intec] Balance
Operation and Cleaning of Sanko Automatic Sachet Filling
25 Machine SH/030/00 00 21.03.21 20.03.26
26 Operation and Cleaning of CVC Printing Machine SH/031/00 00 21.06.21 20.06.26
Operation, Function Check, Weighing, Maintenance and
27 SH/032/00 00 02.09.21 01.09.26
Cleaning of Electronic Balance Shimadzu [Model TX423L]
Operation, Function Check, Weighing, Maintenance and
28 SH/033/00 00 09.09.21 08.09.26
Cleaning of Electronic Balance Shimadzu [Model BX32KH]
29 Operation and Cleaning of Dynamic Pass Box SH/034/00 00 31.05.22 30.05.27

Prepared By: Checked By: Approved By:


POPULAR PHARMACEUTICALS LTD.

SOP List

Sterile Department

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

1 Entry/Exit Procedure in Sterile Facility ST/001/07 07 06.03.23 05.03.28


Action Taken in Case of Power/Air Condition Failure During
2 ST/003/04 04 05.10.19 04.10.24
Aseptic Filling
Operation and Cleaning of ROTA Ampoule Filling Machine
3 ST/004/04 04 05.10.19 04.10.24
(R921 MA/20)
4 Preparation of Filtration Set and Sterilization ST/006/05 05 31.10.20 30.10.25
Washinh and Sterilization of Dress used for Class C and
5 ST/007/05 05 17.11.20 16.11.25
Class B Area
Preparation & Usage of Cleaning and Disinfectant of Different
6 ST/008/05 05 06.02.23 05.02.28
Areas of Sterile Facility
7 Disposal of Rejected Filled Ampoules ST/009/04 04 05.10.19 04.10.24
Cleaning of Process/Manufacturing related Equipments and
8 ST/012/04 04 07.02.19 06.02.24
Contact Parts of Filling and Sealing Machine
9 Din Ampoule arrangement in the S.S Cassettes ST/014/04 04 02.08.20 01.08.25
10 Visual Inspection of Filled Ampoules ST/015/04 04 06.02.19 05.02.24
Operation and Cleaning of Celester Autoclave Model :
11 ST/016/04 04 27.07.20 26.07.25
SM 600+GVP 150I
12 Receiving of Pre-sterilized Bottle, Cap and Nozzle ST/017/01 01 07.10.19 06.10.24
13 Operation of WFI Control Panel for Collection of WFI ST/018/03 03 05.10.19 04.10.24
Operation and Cleaning of Labelling Machine, Model: KK-
14 ST/019/03 03 16.01.23 15.01.28
906B
15 Operation and Cleaning of Dynamic Pass Box ST/020/03 03 16.01.23 15.01.28
16 Integrity Test for Air Vent Filter, Model No. (MIDISART 2000) ST/021/03 03 30.01.23 29.01.28
Operation and Cleaning of Filter Integrity Tester, Model:
17 ST/023/04 04 14.03.23 13.03.28
Sartocheck 4 Plus 26288
Receiving of Raw Material from Warehouse and Store in
18 ST/025/03 03 02.01.20 01.01.25
Plastic Container
19 Entry/Exit procedure of powder for injection facility ST/027/03 03 03.02.23 02.02.28
Operation and Cleaning of Vial Washing Machine, Ambica
20 ST/030/04 04 09.08.20 08.08.25
Model : ARVW-120

Operation and Cleaning of Automatic Injectable Powder Filling


21 ST/031/04 04 10.08.20 09.08.25
and Rubber Stoppering Machine, Ambica Model : AHPF-120

Operation and Cleaning of Automatic Cap Sealing Machine,


22 ST/032/04 04 21.08.20 20.08.25
Ambica Model : AHCS-150
Operation and Cleaning of Electrolab Vial Filling Machine,
23 ST/033/03 03 27.11.20 26.11.25
Model : PP202LCS

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Ahahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

25 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Sterile Department

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

Personnel entry/exit and Gowning through Change Room for


24 ST/034/04 04 16.12.20 15.12.25
Dialysis Solution Unit
Set Up and Operation of Dialysis Solution Container Cleaning
25 ST/035/04 04 16.12.20 15.12.25
Machine
Assembling, Dismantling and Cleaning of Pharmalab
26 ST/037/04 04 16.12.20 15.12.25
Container Filling Machine
27 Manufacturing,Filtration and Filling of Dialysis Solution ST/038/05 05 24.04.20 23.04.25
28 Preparation of 70% Filtered IPA ST/039/04 04 29.10.20 28.10.25
Operation and Cleaning of Pre-filled Syringe filling and
29 ST/040/03 03 09.01.23 08.01.28
Stoppering Machine Model: PFS-05/A-5-6001
Operation and Cleaning of Rotary Vial Washing Machine,
30 ST/041/03 03 07.07.19 06.07.24
Model : ECRW-I8A
Operation and Cleaning of Sanamij Autoclave Model: SAR
31 ST/044/03 03 07.07.19 06.07.24
6.6.6-2V
32 CIP and Sterilization of Insulin Manufacturing Vessels ST/045/03 03 07.07.19 06.07.24
33 Visual Inspection of Filled Vials ST/046/04 04 06.02.19 05.02.24
Operation and Cleaning of Chutian Vial Filling and Stoppering
34 ST/047/03 03 28.02.19 27.02.24
Machine Model: DGS4D
Operation and Cleaning of Chutian Vial Cap sealing Machine,
35 ST/048/03 03 16.01.23 15.01.28
Model:ZG300C
CIP, SIP and Operation of Yenchen 100 Liter Manufacturing
36 ST/052/03 03 05.10.19 04.10.24
Vessel [Model No. YC-JMT-125]
37 General Housekeeping of Packaging Area ST/053/03 03 16.03.20 15.03.25
38 General Packaging in Sterile Area ST/055/03 03 01.01.23 31.12.27
39 Receiving of Cold Chain Material from Warehouse ST/056/04 04 07.05.23 06.05.28
40 General Procedure for Packing of Dialysis Solution ST/057/04 04 16.12.20 15.12.25
41 General Procedure for Manufacturing of Dialysis Solution ST/058/04 04 16.12.20 15.12.25
42 General Cleaning procedure of Dialysis Facility ST/059/05 05 25.06.23 24.06.28
43 Operation of Buchon WIDER SIII Blister Machine ST/066/02 02 26.08.20 25.08.25
Setting,Operation and Cleaning of Sticker Labeling Machine,
44 ST/068/02 02 18.04.23 17.04.28
Model : TB-200
Operation and Cleaning of ROTA Ampoule Filling Machine
45 ST/070/01 01 12.03.19 11.03.24
(R960/MA)
Operation and Cleaning of Image Printing Machine
46 ST/071/01 01 13.10.18 12.10.23
(Model : 58 MASTER)
47 Operation and Cleaning of Flexi Filler Machine ST/072/01 01 13.10.18 12.10.23
Operation and Cleaning of Induction Cap Sealing Machine,
48 ST/074/01 01 24.05.19 23.05.24
Model: SIGMA I ACE

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Ahahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

26 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Sterile Department

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

Operation, Function Check, Maintenance and Cleaning of


49 ST/075/01 01 14.07.19 13.07.24
Dispensing Balance Shimadzu [Model BX32KS]
Operation and Cleaning of Horiozontal Ampoule Labeller
50 ST/076/01 01 25.09.19 24.09.24
(Model: CVC 350U)
51 Cleaning of Lyophilize Machine, Model: Lyo-10 ST/077/01 01 09.10.19 08.10.24
52 Sterilization of Lyophilize Machine, Model: Lyo-10 ST/078/01 01 09.10.19 08.10.24
53 Operation of Lyophilize Machine, Model: Lyo-10 ST/079/01 01 09.10.19 08.10.24
54 De-Icing of Lyophilize Machine, Model: Lyo-10 ST/080/01 01 09.10.19 08.10.24
Operation, Calibration, Function Check, Cleaning and
55 Maintenance of Analytical Balance Radwag ST/081/01 01 19.10.19 18.10.24
[Model AS 310.R2]
Operation and Cleaning of Dry Heat Sterilizer
56 ST/082/01 01 09.12.19 08.12.24
Model: XRSHX-IIIJ
Operation, Calibration and Maintenance of Mettler Toledo pH
57 ST/083/02 02 31.07.23 30.07.26
Meter [Model : Seven Compact S210]
Integrity Test for Cartridge Filter by Palltronic Flowstar
58 ST/084/01 01 26.02.23 25.02.28
IV FFS04S
Operation, Function Check,Maintenance and Cleaning of
59 ST/085/00 00 04.01.19 03.01.24
Balance SHIMADZU [Model TXB620AL]
Operation, Function Check,Maintenance and Cleaning of
60 ST/086/00 00 22.01.19 21.01.24
Balance SHIMADZU[Model :BX12KH]
61 Qualification of Visual Inspector ST/088/00 00 09.04.19 08.04.24
Operation and Cleaning of Fedegari Autoclave [ Model:
62 ST/089/00 00 19.05.19 18.05.24
XFOAF5/Q04E]
Operation and Cleaning of Multi-Function Plastic Flim Sealing
63 ST/090/00 00 06.08.19 05.08.24
Machine [Model No. BF-900]
Operation and Cleaning of 60 Liter FD Manufacturing Vessel
64 ST/091/00 00 06.08.19 05.08.24
[Model No. ES-1400]
65 Operation and Cleaning of IKA Stirrer [Model No. RW 28 B] ST/092/00 00 21.08.19 20.08.24
Operation and Cleaning of CVC Imprinting Machine
66 ST/093/00 00 21.08.19 20.08.24
[Model No. 584]
67 Operation and Cleaning of Shrink Wrapping Machine ST/094/00 00 22.08.19 21.08.24
68 Personnel Gowning Qualification ST/095/00 00 22.08.19 21.08.24
Entry, Exit and Gowning for Sterile Packing Area Extension
69 ST/096/00 00 12.09.19 11.09.24
(2nd Floor)
Operation and Cleaning of Hologram Sticker Labeling
70 ST/097/01 01 25.12.22 24.12.27
Machine (Model: AL320)
Operation and Cleaning of Eye Drop Filling, Plugging and
71 ST/098/00 00 15.11.19 14.11.24
Over Capping Machine, [Model:FLL201/TS]

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Ahahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

27 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Sterile Department

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

Operation and Cleaning of Automatic Ampoule and Vial


72 ST/099/00 00 16.05.20 15.05.25
Inspection Machine, [Model: NIKE]
Operation of Online Air Borne Particle Counter Machine
73 ST/100/01 01 19.12.20 18.12.25
(Model: FacilityPro 3010)
Operation and Cleaning of Depyrogenation Tunnel, Model:
74 ST/101/00 00 13.08.20 12.08.25
FTV20/01-01
Operation, Function Check,Maintenance and Cleaning of
75 ST/102/00 00 23.01.21 22.01.26
Weighing Balance Baxtran[Model :DSN30]
76 Operation and Cleaning of Imaje Printer (Model: 9030) ST/103/00 00 15.03.21 14.03.26
CIP and SIP of Sterinox Systems 400 Liter Manufacturing
77 ST/104/00 00 27.03.21 26.03.26
Vessel [Model No. SS-SMV-400]
Operation, Function Check, Maintenance and Cleaning of
78 ST/105/00 00 02.08.21 01.08.26
Balance SHIMADZU [Model TX423L]
Operation and Cleaning of Hoonga Automatic Blister Packing
79 ST/106/00 00 13.11.22 12.11.27
Machine, (Model: HM AV)
80 Waste Management in Sterile Facility ST/107/00 00 19.01.23 18.01.28
Operation and Cleaning of Packaging Conveyor Belt in sterile
81 ST/108/00 00 11.02.23 10.02.28
Facility
Operation and Cleaning Procedure of Fogger Machine,Model
82 ST/109/00 00 14.03.23 13.03.28
3018 (SFD)
83 Operation and Cleaning of VIDEOJECT Printer (Model:1880) ST/110/00 00 16.05.23 15.05.28
Operation and Cleaning Procedure of Drying Oven (Model
84 ST/111/00 00 10.05.23 09.05.28
No.: FED 720)

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Ahahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

28 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Animal Health

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

1 Control of Manufacturing of Animal Health Products AH/001/01 01 30.09.19 29.09.24


2 Operation & Cleaning of Drum Blender AH/002/01 01 30.09.19 29.09.24
3 General Cleaning and Maintenance of Animal Health Area AH/005/01 01 03.10.19 02.10.24
4 Personnel Entry, Exit and Gowning in Manufacturing Area AH/007/02 02 23.01.23 22.01.28
5 Personnel Entry, Exit and Gowning in Packaging Area AH/008/02 02 23.01.23 22.01.28
6 Operation and Cleaning of Sifter (Gansons) Machine AH/009/01 01 06.10.19 05.10.24
7 Cleaning of Sieve AH/010/01 01 06.10.19 05.10.24
8 Operation & Cleaning of Multi Mill AH/011/01 01 06.10.19 05.10.24
9 Operation of JAGUAR Compression Machine 12 Station AH/012/01 01 06.10.19 05.10.24
10 General Procedure for Packaging AH/014/02 02 04.01.23 03.01.28
11 Operation and Cleaning of Mark Liquid Filling Machine AH/015/01 01 06.10.19 05.10.24
12 Cleaning of Blending Area AH/016/01 01 06.10.19 05.10.24
Waste Management and Disposal of Animal Health
13 AH/017/01 01 06.10.19 05.10.24
Manufacturing and Packaging Area
Operation and Cleaning of JOSTON Steam Jacketed
14 AH/018/00 00 01.09.21 31.08.26
Manufaturing Vessel, 1500 L
15 Operation and Cleaning of JOSTON Storage Vessel, 1500 L AH/019/00 00 01.09.21 31.08.26
16 Operation and Cleaning of JOSTON Steam Jacketed ManufaturingAH/020/00 00 01.09.21 31.08.26
Operation and Cleaning of Portable Homogenizer (Silverson)
17 AH/021/00 00 14.09.21 13.09.26
Agitator Mixer
18 Operation and Cleaning of Portable Disc Type Agitator Mixer AH/022/00 00 14.09.21 13.09.26
19 Operation and Cleaning of Double Cone Blender AH/023/00 00 05.10.21 04.10.26
20 Operation and Cleaning of Lung Wei Bottle Washing Machine AH/024/00 00 08.11.21 07.11.26
21 Operation and Cleaning of Lung Wei Liquid Filling Machine AH/025/00 00 08.11.21 07.11.26
22 Operation and Cleaning of Lung Wei Capping Machine AH/026/00 00 08.11.21 07.11.26
Operation and Cleaning of Fluidpack Tablet Compression
23 AH/027/00 00 09.03.22 08.03.27
Machine
24 Operation and Cleaning of Dispensing Booth AH/028/00 00 20.04.22 19.04.27
Operation, Function Check, Weighing, Maintenance and
25 AH/029/00 00 28.04.22 27.04.27
Cleaning of Electronic Balance Shimadzu [Model TX423L]
Operation, Function Check, Weighing, Maintenance and
26 Cleaning of Electronic Balance Minebea intec combics 3 [Model AH/030/00 00 08.05.22 07.05.27
CAW3P1-150GF-I]

27 Operation and Cleaning of Weighing Balance DINI ARGEO AH/031/00 00 07.08.22 06.08.27
[WET - 30 - 1/ DFWL - 1]
Operation and Cleaning Procedure of Sunny Automatic
28 AH/032/00 00 12.02.23 11.02.28
Granules Filling Machine (Model: SDXD 15)
Operation and Cleaning Procedure of GANSONS High Shear
29 AH/033/00 00 23.02.23 22.02.28
Mixer Granulator (Model: HSMG 150)
Operation and Cleaning Procedure of GANSONS Fluidized Bed
30 AH/034/00 00 23.02.23 22.02.28
Processor (Model: GFBP 150)

Prepared By: Checked By: Approved By:


POPULAR PHARMACEUTICALS LTD.

SOP List

Engineering Department

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

1 Management of Plant Maintenance Activities EN/001/07 07 17.11.22 16.11.27


2 HVAC System Operation and Maintenance EN/003/05 05 29.06.20 28.06.25
3 HVAC Filter Monitoring, Changing and Cleaning EN/004/07 07 28.05.23 27.05.28
4 Operation and Maintenance of Air Compressors EN/007/06 06 31.12.22 30.12.27
Operation & Maintenance of Purified Water Plant for
5 EN/008/06 06 30.12.19 29.12.24
Solid/Liquid/Sterile
Operation and Maintenance Procedure of Water for Injection
6 EN/009/05 05 29.02.20 28.02.25
Plant (Sterile & Cephalosporin)
7 Calibration EN/010/07 07 30.12.19 29.12.24
8 Calibration of Temperature Sensor EN/011/05 05 25.08.18 24.08.23
9 Calibration of Pressure Gauge/Transmitter EN/012/05 05 21.08.18 20.08.23
10 Operation and Maintenance of Substation EN/013/04 04 02.12.18 01.12.23
11 Operation & Maintenance of Electric Distribution Panel EN/014/04 04 27.12.18 26.12.23
12 Calibration of Manufacturing Vessels Weight Indicator EN/015/04 04 19.07.18 18.07.23
13 Procedure of Rotation (RPM) Measurement EN/016/04 04 15.09.22 14.09.27
Principle of Calibration for Water Treatment Plant
14 EN/017/03 03 17.05.19 16.05.24
(PW & WFI)
15 Operation & Maintenance Procedure of Steam Boiler EN/018/05 05 11.01.23 10.01.28
16 Calibration of Moisture Analyzer EN/019/05 05 12.11.20 11.11.25
17 Operation and Maintenance Procedure of Potable Water System EN/020/04 04 08.09.18 07.09.23
18 Waste Management EN/022/04 4 29.08.20 28.08.25
19 Operation and Maintenance of Workshop Equipment & Tools EN/023/05 05 29.12.19 28.12.24
Operation and Maintenance Procedure of Effluent Treatment
20 EN/024/04 04 06.03.21 05.03.26
Plant
21 Plant Equipment Identification Numbering System EN/027/03 03 28.11.20 27.11.25
22 Calibration of Pack Integrity Tester/Leak Test Apparatus EN/030/04 04 28.06.20 27.06.25
Preventive Maintenance of Vial Washing Machine,
23 EN/031/04 04 30.08.19 29.08.24
(W600-8)
24 Preventive Maintenance of Depyrogenation Tunnel (T600/H1C1) EN/032/04 04 17.05.19 16.05.24
Preventive Maintenance of Powder Filling and Stoppering Unit
25 (Micro 9) EN/033/04 04 30.08.19 29.08.24
Preventive Maintenance of Vial Cap Sealing Unit (CSP10)
26 EN/034/04 04 17.05.19 16.05.24
Preventive Maintenance of Auto Capsule Filling Machine
27 EN/036/04 04 17.05.19 16.05.24
(SF-40N)
Preventive Maintenance of Automatic Powder Filling Machine(JC-
28 EN/037/04 04 17.05.19 16.05.24
PF-2)

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

30 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Engineering Department

Sl. Title SOP No. Revision Effective Review


No. No. Date Date
29 Preventive Maintenance of Blister Packing Machine (Ministar-V6) EN/038/04 04 17.05.19 16.05.24
Preventive Maintenance of Automatic Ampoule Filling & Sealing
30 EN/039/04 04 30.12.19 29.12.24
Machine (R921/MA)
31 Preventive Maintenance of Manufacturing Vessel 100 Liter EN/041/04 04 30.12.19 29.12.24
32 Preventive Maintenance of IBC Blender (MB G20-10BC) EN/043/04 04 30.08.19 29.08.24
33 Preventive Maintenance of Bottle Labeling Machine (Glue) EN/044/04 04 30.08.19 29.08.24

34 Preventive Maintenance of Automatic Cap Sealing Machine(FD) EN/045/04 04 30.08.19 29.08.24


35 Calibration of Friability Tester EN/046/04 04 12.03.19 11.03.24
Preventive Maintenance of Autoclave
36 EN/047/04 04 30.12.19 29.12.24
(Sterimega 600)
37 Preventive Maintenance of Manufacturing Vessel (500 L) EN/048/04 04 20.05.19 19.05.24

38 Preventive Maintenance of Manufacturing Vessel (1500 L) EN/049/03 04 21.05.19 20.05.24

39 Preventive Maintenance of Manufacturing Vessels (Cream) EN/050/04 04 21.05.19 20.05.24


Preventive Maintenance of Bottle Filling Machine and Cap
40 EN/051/04 04 04.05.19 03.05.24
Sealing Machine (Pharmalab)
Preventive Maintenance of Automatic Tube Filling & Sealing
41 EN/052/04 04 23.05.19 22.05.24
Machine
Preventive Maintenance of Linear Bottle Washing Machine
42 EN/053/04 04 04.05.19 03.05.24
(Pharmalab)
43 Preventive Maintenance of Bottle Dryer Machine EN/055/04 04 07.01.19 06.01.24
Preventive Maintenance of Self Adhesive Labeling Machine
44 EN/057/04 04 25.05.19 22.05.24
(Pharmalab)
Preventive Maintenance of Pam-Glatt Fluid Bed Processor (Pam-
45 EN/058/04 04 16.03.19 15.03.24
Glatt)
46 Preventive Maintenance of Fluid Bed Dryer (NR) EN/059/04 04 05.05.19 04.05.24
47 Preventive Maintenance of High Speed Mixer Machine (NR) EN/060/04 04 07.05.19 06.05.24
48 Preventive Maintenance of Super Mixer Granulator EN/061/04 04 07.05.19 06.05.24
49 Preventive Maintenance of Cone Mill EN/062/04 04 25.05.19 24.05.24
50 Preventive Maintenance of Lifting & Tilting Device EN/063/04 04 02.06.19 01.06.24
51 Preventive Maintenance of Comminuting Mill Machine EN/064/04 04 02.06.19 01.06.24
52 Preventive Maintenance of Pharma Lifter (Canaan) EN/065/04 04 02.06.19 01.06.24
53 Preventive Maintenance of Multi Mill Machine EN/066/04 04 06.01.19 05.01.24
54 Preventive Maintenance of Drum Blender Machine EN/067/04 04 07.01.19 06.01.24

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

31 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Engineering Department

Sl. Title SOP No. Revision Effective Review


No. No. Date Date
55 Preventive Maintenance of Mix- Bin,(IBC Blender) EN/068/04 04 16.03.19 15.03.24
Preventive Maintenance of Rotary Tablet Press Machines (MRC-
56 EN/069/04 04 16.03.19 15.03.24
37D A.W.C, Sejong
Preventive Maintenance of Single Rotary Tableting Machine,
57 EN/070/04 04 16.03.19 15.03.24
(CPMD3-16)
Preventive Maintenance of Automatic Coating System (SFC-130
58 EN/071/04 04 11.05.19 10.05.24
FSN, Sejong)
59 Preventive Maintenance of Film Coating Machine (NR) EN/072/04 04 09.05.19 08.05.24
Preventive Maintenance of Automatic Capsule Filling Machine
60 EN/073/04 04 09.05.19 08.05.24
(Zanasi-40F)
61 Preventive Maintenance of Blister Packaging Machine EN/074/04 04 27.09.18 26.09.23
Preventive Maintenance of Automatic Blister Packaging Machine
62 EN/075/05 05 23.11.21 22.11.26
(Buchon)
63 Preventive Maintenance of Conveyor Belt (Solid & LCO) EN/076/05 05 07.06.23 06.06.28
64 Preventive Maintenance of Powder Filling Machine (All FiLL) EN/077/04 04 02.06.19 01.06.24

65 Preventive Maintenance of R.O.P.P Cap Sealing Machine (Mark) EN/078/04 04 02.06.19 01.06.24
Preventive Maintenance of Automatic Tablet Counting and Filling
66 EN/079/04 04 08.05.20 07.05.25
Machine
67 Preventive Maintenance of Label and Box Printer EN/080/04 04 14.05.19 13.05.24
68 Performance Monitoring of HVAC System EN/082/06 06 15.01.21 14.01.26
69 Calibration of Temperature & % RH Sensor EN/086/06 06 23.01.23 22.01.28
70 Calibration of Disintergration Tester EN/087/04 04 15.12.20 14.12.25
71 Calibration of Tapped Density Tester EN/088/04 04 30.03.20 29.03.25
72 Calibration of Weighing Balances EN/089/04 04 15.05.19 14.05.24
Preventive Maintenance of Self Adhesive Labeling Machine (KK
73 EN/092/03 03 02.06.19 01.06.24
& KK)
Operation, Calibration, Maintenance & Function Check of Vernier
74 EN/094/03 03 04.08.18 03.08.23
Caliper and Micrometer Screw Gauge
75 Intensity of Light Measurement EN/095/03 03 11.08.18 10.08.23
Operation & Maintenance of Purified Water Plant (LVP/AMINO &
76 EN/097/03 03 08.08.18 07.08.23
CEPH.)
Preventive Maintenance of Tablet Compression Machine (NRIR-
77 EN/100/03 03 17.05.19 16.05.24
13D)
Preventive Maintenance of Pharma Lifter (NTD-800)
78 EN/102/03 03 17.05.19 16.05.24
Preventive Maintenance of Bottle Washing Machine
79 EN/104/03 03 17.05.19 16.05.24
(YC-BW-18B)
Preventive Maintenance of Self Adhesive Labeling Machine (Self
80 EN/106/03 03 31.08.19 30.08.24
-adhesive)

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

32 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Engineering Department

Sl. Title SOP No. Revision Effective Review


No. No. Date Date
Preventive Maintenance of Liquid Vial Capping Machine
81 EN/110/03 03 30.12.19 29.12.24
(ZG 300C)
Preventive Maintenance of Liquid Vial Filling and Stoppering
82 EN/111/03 03 30.12.19 29.12.24
Machine (DGS4D)
Preventive Maintenance of Vial Washing Machine
83 EN/112/03 03 30.12.19 29.12.24
(E CHUNG)
Preventive Maintenance of Pre-Filled Syringe Filling and
84 EN/113/03 03 30.12.19 29.12.24
Stoppering Machine
85 Preventive Maintenance of Steam Sterilizer-6.6.6-2V (Sanamij) EN/114/03 03 30.12.19 29.12.24

Preventive Maintenance of Self Adhesive Labeling Machine (KK-


86 EN/116/03 03 30.12.19 29.12.24
906)
87 Temperature & Humidity Calibration for Stability Chamber EN/120/03 03 24.06.19 23.06.24
Preventive Maintenance of Automatic Injectable Powder Filling
88 EN/121/03 03 12.03.19 11.03.24
and Rubber Stoppering Machine (Ambica)
Preventive Maintenance of Automatic Rotary Vial Washing
89 EN/122/03 03 12.03.19 11.03.24
Machine (Ambica)
90 Preventive Maintenance of Dispensing Booth, EN/125/03 03 17.02.19 16.02.24
91 Preventive Maintenance of High Speed Mixer Granulator (JIAFA) EN/127/03 03 17.02.19 16.02.24
92 Preventive Maintenance of Blender Machine EN/128/03 03 17.02.19 16.02.24
Preventive Maintenance of Tablet compression machine
93 EN/129/03 03 17.02.19 16.02.24
(GRC15SA.W.C)
Preventive Maintenance of Automatic Blister Pack Machine
94 EN/131/05 05 07.06.23 06.06.28
(Hoonga)
Preventive Maintenance of Container Filling machine
95 EN/133/03 03 12.02.19 11.02.24
(Pharmalab)
96 Preventive Maintenance of Container Washing Machine EN/134/03 03 12.02.19 11.02.24
97 Preventive Maintenance of Autoclave (Sterimega 350) EN/135/03 03 17.05.19 16.05.24
98 Preventive Maintenance of Dry Heat Sterilizer, Pyromega -1000 EN/136/04 04 08.08.22 07.08.27
99 Preventive Maintenance of Autoclave (Sterimega 350) EN/137/04 04 08.08.22 07.08.27
Preventive Maintenance of Rotary Tablet Press Machine (MRC-
100 EN/141/03 03 16.03.19 15.03.24
61D,Sejong).
Preventive Maintenance of Blender Machine
101 EN/145/03 03 07.11.18 06.11.23
102 Calibration of Filter Integrity Tester (Sartocheck 4 Plus) EN/148/02 02 25.08.18 24.08.23
Operation & Maintenance of Water for Injection Plant for
103 EN/150/04 04 19.02.23 18.02.28
Penicillin Facility
Operation & Maintenance of Purified Water Plant
104 EN/153/03 03 30.05.20 29.05.25
(Hormone Building)

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

33 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Engineering Department

Sl. Title SOP No. Revision Effective Review


No. No. Date Date
105 Preventive Maintenance of Automatic Sachet Packaging Machine EN/155/03 03 10.05.19 09.05.24
106 Calibration of Weight EN/157/02 02 23.05.19 22.05.24
107 Operation and Maintenance of Cold Room Refrigeration System EN/158/04 04 19.06.23 18.06.28
108 Preventive Maintenance of LAF Module EN/159/02 02 03.01.20 02.01.25
Operation & Maintenance of Pure Steam Generator of Hormone
109 EN/160/03 03 23.12.20 22.12.25
Injectable Facility
110 Calibration Procedure for Dissolution Tester EN/162/02 02 25.08.20 24.08.25
111 Calibration for Hardness Tester EN/163/02 02 04.06.20 03.06.25
112 On the Job Training for Engineering Personnel EN/165/01 01 20.08.18 19.08.23
113 Operation and Maintenance of PSA Nitrogen Generator EN/166/04 04 10.05.19 09.05.24
114 Operation of Stacker Truck (EMC 110/B10) EN/167/03 03 09.05.19 08.05.24
Operation of Superheated Water Spray Autoclave
115 EN/168/03 03 11.05.19 10.05.24
(Fedegari- FOW8/DD)
116 Facility, Utility & Equipment Qualification EN/172/03 03 28.06.21 27.06.26
Preventive Maintenance of Super Heated Water Spray
117 EN/174/03 03 06.09.19 05.09.24
Autoclave (FEDEGARI)
Preventive Maintenance of Automatic Capsule Filling Machine
118 EN/175/02 02 09.03.21 08.03.26
(PZ-40)
Preventive Maintenance of Automatic Coating System
119 EN/176/01 01 31.12.19 30.12.24
(SFC-150,Sejong)
120 Preventive Maintenance of Fluid Bed Dryer (Alliance) EN/177/01 01 31.12.19 30.12.24
121 Preventive Maintenance of HAPA 230 Foil Printing Machine EN/178/01 01 06.02.20 05.02.25
Preventive Maintenance of Vertical Ultrasonic Vial Washing
122 EN/179/01 01 17.03.20 16.03.25
Machine
Preventive Maintenance of Circulating Heating Air Tunnel Oven
123 EN/181/01 01 17.03.20 16.03.25
Sterilizer
Preventive Maintenance of Automatic Labeling Machine
124 EN/182/02 02 08.08.22 07.08.27
(TB 200)
125 Preventive Maintenance of Shinva Sterilizer EN/183/01 01 17.03.20 16.03.25
Preventive Maintenance of Ampoule Filling and Sealing Machine
126 EN/184/01 01 17.03.20 16.03.25
(R911/MA)
Preventive Maintenance of Lyophilizer (Lyo-10, SIP and CIP)
127 EN/185/01 01 22.03.20 21.03.25
Machine
Preventive Maintenance of Lyophilizer (Lyo-2, SIP and CIP)
128 EN/186/01 01 22.03.20 21.03.25
Machine
129 Preventive Maintenance of Tablet Press Machine (Fette) EN/187/01 01 30.05.20 29.05.25

130 EN/188/01 01 30.05.20 29.05.25


Preventive Maintenance of Automatic Coating Machine (Sejong)

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

34 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Engineering Department

Sl. Title SOP No. Revision Effective Review


No. No. Date Date
131 Preventive Maintenance of Coating Machine (YC-SC-100F) EN/189/01 01 09.06.20 08.06.25
132 Preventive Maintenance of Coating Machine (NR) EN/190/01 01 09.06.20 08.06.25
Operation and Maintenance procedure of Gas Generator 200
133 EN/191/02 17.11.21 16.11.26
KGPH 02

134 Operation and Maintenance of Pure Steam Generator 200 KGPH EN/192/01 01 31.12.22 30.12.27
135 Preventive Maintenance of Manufacturing Vessels EN/193/00 00 01.10.18 30.09.23
136 Preventive Maintenance of Inject Printer EN/194/00 00 25.10.18 24.10.23
Preventive Maintence of Filling and Closing Machine for
137 EN/195/00 00 01.11.18 31.10.23
Ampoules (R960MA)
138 Preventive Maintence of Dry Heat Sterilizer (XRSHX-IIIJ) EN/196/00 00 01.11.18 31.10.23
139 Preventive Maintence of Vial Filling Machine (Electrolab) EN/197/00 00 01.11.18 31.10.23
Preventive Maintence of Horizontal Ampoule Labeler
140 EN/198/00 00 01.11.18 31.10.23
(CVC 350U)
141 Preventive Maintence of Insulin Cartridge Washing Machine EN/199/00 00 01.11.18 31.10.23
142 Preventive Maintenance of Manufacturing Vessel 30 Liter EN/200/00 00 01.11.18 31.10.23
Preventive Maintenance of Manufacturing Vessel 70 Liter
143 EN/201/00 00 01.11.18 31.10.23
with Load Cell
144 Operation and Maintenance of Diesel Generator EN/202/00 00 07.11.18 06.11.23
Operation & Maintenance of 1500 Liter Purified Water Plant for
145 EN/203/01 01 01.11.21 31.10.26
Sterile & Hormone Building
Operation & Maintenance of Water for Injection Plant for Sterile
146 EN/204/01 01 28.02.22 27.02.27
Building
Preventive Maintence of Automatic Form Fill Seal Line
147 EN/205/00 00 25.12.18 24.12.23
(FFS 892)
Preventive Maintence of Automatic High speed Injectable Liquid
148 EN/206/00 00 26.12.18 25.12.23
Filling with Rubber Stopper Machine
149 Preventive Maintence of Bottle Filling Machine (Plumat) EN/207/00 00 26.12.18 25.12.23
150 Preventive Maintence of Bottle Washing Machine EN/208/00 00 25.12.18 24.12.23
151 Preventive Maintence of Cap Sealing Machine EN/209/00 00 29.12.18 28.12.23
152 Preventive Maintence of Desktop Filling Machine EN/210/00 00 29.12.18 28.12.23
Preventive Maintence of Automatic High speed Wet Glue
153 EN/211/00 00 30.12.18 29.12.23
Labeling Machine
Preventive Maintence of High Frequency Plastic Welding
154 EN/212/00 00 29.12.18 28.12.23
Machine (Bag Forming)
Preventive Maintence of High Frequency Plastic Welding
155 EN/213/00 00 30.12.18 29.12.23
Machine (Port welding)
156 Preventive Maintenance of High Pressure Homogenizer EN/214/00 00 01.01.19 31.12.23
157 Preventive Maintenance of Manufacturing Vessel EN/215/00 00 01.01.19 31.12.23

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

35 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Engineering Department

Sl. Title SOP No. Revision Effective Review


No. No. Date Date
Preventive Maintenance of Self Adhesive Labeling Machine
158 EN/216/00 00 01.01.19 31.12.23
(Ambica)
Preventive Maintenance of Semi Automatic Filler Capper (FC
159 EN/217/00 00 01.01.19 31.12.23
400)
160 Preventive Maintenance of Storage Vessel EN/218/00 00 02.01.19 01.01.24
161 Preventive Maintenance of Vacuum Stopper Matchine (Plumat) EN/219/00 00 02.01.19 01.01.24
162 Preventive Maintenance of Bottle Washing Machine EN/220/00 00 10.01.19 09.01.24
163 Preventive Maintenance of Double Cone Blender Machine EN/221/00 00 10.01.19 09.01.24
164 Preventive Maintenance of Hauser Auger Filling Machine EN/222/00 00 19.01.19 18.01.24
165 Preventive Maintenance of Vial Cap Sealing Machine EN/223/00 00 19.01.19 18.01.24
166 Preventive Maintenance of Vial Filling Line (PFI) EN/224/00 00 19.01.19 18.01.24
167 Operation and Maintenance of Electric Reach Truck EN/225/00 00 14.01.19 13.01.24
Installed HEPA Filter System Leakage Test using Aerosol
168 EN/226/01 01 05.01.23 04.01.28
Photometer and Aerosol Generator
169 Preventive Maintenance of Manufacturing vessel with Stirrer EN/227/00 00 09.02.19 08.02.24
Preventive Maintenance of Tablet Compression Machine
170 (Cadmach) EN/228/00 00 09.02.19 08.02.24
171 Preventive Maintenance of Manufacturing Vessel EN/229/00 00 16.03.19 15.03.24
172 Preventive Maintenance of Blister Pack Machine (Uhlmann) EN/230/00 00 20.03.19 19.03.24
173 Preventive Maintenance of Cartoning Machine (Uhlmann) EN/231/00 00 20.03.19 19.03.24
174 Preventive Maintenance of Bin Mixer (YC-BM-500) EN/232/00 00 06.05.19 05.05.24
175 Preventive Maintenance of Tablet Compression Machine EN/233/00 00 30.04.19 29.45.24
Preventive Maintenance of Tablet Compression Machine (JSH-
176 EN/234/00 00 30.04.19 29.45.24
412)
177 Preventive Maintenance of Bottle Filling Machine (LFM-500) EN/235/00 00 08.05.19 07.05.24
Preventive Maintenance of Automatic Sachet Filling Machine
178 EN/236/00 00 08.05.19 07.05.24
(QD-60A)
Preventive Maintenance of induction Cap Sealing Machine
179 EN/237/00 00 20.06.19 19.06.24
(SIGMA I ACE)
180 Preventive Maintenance of Autoclave (FEDEGARI-NA3038BA) EN/238/00 00 19.06.19 18.06.24
181 Preparation of Qualification/Re-Qualification Protocol & Report EN/239/03 03 05.01.23 04.01.28
182 Performance Test  of Safety Relief Valve/Pressure Relief Valve EN/240/00 00 19.09.19 18.09.24
183 Operation of Kaye Validator AVS System EN/241/00 00 01.10.19 30.09.24
Preventive Maintenance of Vial Filling and Stoppering Machine
184 EN/242/00 00 27.10.19 26.10.24
(ROTA FLL201/G)
Preventive Maintenance of Vial Capping and Crimping Machine
185 EN/243/00 00 23.10.19 22.10.24
(ROTA FLR201/B)
Preventive Maintenance of Two Side Hologram Sticker Labeling
186 EN/244/00 00 28.07.21 27.07.26
Machine (AL 320)

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

36 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Engineering Department

Sl. Title SOP No. Revision Effective Review


No. No. Date Date
Preventive Maintenance of Eye Drop Filling, Plugging and Over
187 EN/245/00 00 02.01.20 01.01.25
Capping Machine (ROTA-FLL 201/TS)
Preventive Maintenance of Automatic Caroning Machine
188 EN/246/00 00 07.04.20 06.04.25
(Hoonga)
Preventive Maintenance of Rotary Tablet Press Machine (MRC-
189 EN/247/00 00 17.06.20 16.06.25
61D,Sejong).
190 Preventive Maintenance of Vial Serialization Tunnel (Tofflon) EN/248/00 00 15.10.20 14.10.25
191 Assets Transfer and Disposal System EN/249/00 00 19.01.21 18.01.26
192 Preventive Maintenance of Bag Filling and Sealing Machine EN/250/00 00 14.02.21 13.02.26
193 Preventive Maintenance of Storage Vessel EN/251/00 00 06.02.21 05.02.26
194 Preventive Maintenance of Blending Machine (Cosmec) EN/252/00 00 14.03.21 13.03.26
Preventive Maintenance of Automatic Capsule Filling Machine
195 EN/253/00 00 28.02.21 27.02.26
(Harro)
Preventive Maintenance of Automatic Coating Machine (GCSi-
196 EN/254/00 00 28.02.21 27.02.26
700,Glatt)
Preventive Maintenance of Automatic Tablet Compression
197 EN/255/00 00 28.02.21 27.02.26
Machine (Kilian-720)
198 Management of Engineering Store Activities EN/256/01 01 23.02.23 22.02.28
199 Preventive Maintenance of Bio- Safety Cabinet EN/257/00 00 29.06.21 28.06.26
Preventive Maintenance of Automatic Sachet Filling and
200 EN/258/00 00 12.08.21 11.08.26
Packaging Machine (SANKO)
201 Preventive Maintance of Blister Pack Machine (Uhlmann) EN/259/00 00 16.08.21 15.08.26
202 Preventive Maintenance of Auto Cartoning Machine (Uhlmann) EN/260/00 00 16.08.21 15.08.26
203 Preventive Maintenance of Sifter EN/261/00 00 04.09.21 03.09.26
204 Preventive Maintenance of High Shear Granulator (Glatt) EN/262/00 00 04.09.21 03.09.26
205 Preventive Maintenance of Fluid Bed Processor (Glatt) EN/263/00 00 04.09.21 03.09.26
206 Operation of IAQ Measuring Instrument. EN/264/00 00 04.11.21 03.11.26
Preventive Maintenance of Automatic Blister Pack Machine
207 EN/265/00 00 12.06.22 11.06.27
(Hoonga-HM AV)

208 Preventive maintenance of automatic Inspection machine (CMP) EN/266/00 00 22.06.22 21.06.27
Operation & Maintenance of Water for Injection Plant for
209 EN/267/00 00 28.02.22 27.02.27
Hormone Building
Preventive Maintenance of Labeling Machine (SUN JIN SM, SP-
210 EN/268/00 00 29.03.22 28.03.27
3300W)
211 Preventive Maintenance of Autoclave (FEDEGARI- NA3353BC) EN/269/00 00 12.06.22 11.06.27
212 Preventive Maintenace of Double Cone Blender EN/270/00 00 20.04.22 19.04.27
213 Preventive maintenance of Double Cone Blender (500 Liter) EN/271/00 00 29.06.22 28.06.27
214 Preventive Maintenance of Vial Washing Machine (QCL60) EN/272/00 00 14.06.22 13.06.22

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

37 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Engineering Department

Sl. Title SOP No. Revision Effective Review


No. No. Date Date
Operation & Maintenance of 10000 L/H Purified Water Plant for
215 EN/273/00 00 24.03.22 23.03.27
Solid & LVP Facility
Operation & Maintenance Of Water For Injection Plant for LVP
216 EN/274/00 00 24.03.22 23.03.27
Facility
Operation & Maintenance Of Water For Injection Generation
217 EN/275/00 00 15.09.22 14.09.27
Plant (LVP/AMINO)
218 Preventive Maintenance of Bottle Washing Machine (LW-CFW) EN/276/00 00 17.10.22 16.10.27
219 Preventive Maintenance of Liquid Filling Machine (LW-S8QF) EN/277/00 00 17.10.22 16.10.27
220 Preventive Maintenance of Capping Machine (LW-AA) EN/278/00 00 17.10.22 16.10.27
221 Preventive Maintenance of Manufacturing Vessel (300L) EN/279/00 00 17.10.22 16.10.27
222 Preventive Maintenance of Manufacturing Vessel (1500L) EN/280/00 00 17.10.22 16.10.27
223 Preventive Maintenance of Storage Vessel (1500L) EN/281/00 00 17.10.22 16.10.27
Preventive Maintenance of Monoblock Rotary Filler & Capper
224 EN/282/00 00 17.10.22 16.10.27
(LW-16QF6S)
225 Operation & Maintenance for Pure Steam Generator 450 KGPH EN/283/00 00 19.02.23 18.02.28
Preventive Maintenance of Sachet Filling & Sealing Machine
226 EN/286/00 00 13.03.23 12.03.28
(SDXD15)
Preventive Maintenance of Tablet Compression Machine (Accra
227 EN/287/00 00 14.03.23 13.03.28
PRESS IV)
Preventive Maintenance of GANSONS Fluidized Bed Processor
228 EN/288/00 00 14.03.23 13.03.28
GFBP150)
Preventive Maintenance of High Shear Mixer Granulator (HSMG
229 EN/289/00 00 14.03.23 13.03.28
150)
230 Preventive Maintenance of Conveyor Belt (Cephalosporin) EN/290/00 00 07.06.23 06.06.28
231 Preventive Maintenance of Conveyor Belt (Penicillin) EN/291/00 00 07.06.23 06.06.28
232 Preventive Maintenance of Conveyor Belt (Animal Health) EN/292/00 00 08.06.23 07.06.28
233 Preventive Maintenance of Conveyor Belt (Sachet) EN/293/00 00 08.06.23 07.06.28
234 Preventive Maintenance of Conveyor Belt (Hormone Solid) EN/294/00 00 08.06.23 07.06.28
235 Preventive Maintenance of Conveyor Belt (Hormone Injectable) EN/295/00 00 08.06.23 07.06.28

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

38 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Product Development Department

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

1 Stability Study PD/001/04 04 29.03.19 28.03.24


Entry & Exit Procedure in Formulation Laboratory of Product
2 Development Department PD/002/06 06 16.03.23 15.03.28
Entry & Exit Procedure in Analytical Laboratory of Product
3 Development Department PD/003/06 06 16.03.23 15.03.28
4 Operation and Cleaning of Compression Machine PD/004/04 04 16.10.19 15.10.24
5 Operation and Cleaning of Film and Sugar Coating Machine PD/005/04 04 16.10.19 15.10.24
6 Operation and Cleaning of Fluid Bed Dryer PD/006/04 04 07.11.19 06.11.24
7 Operation and Cleaning Procedure of High Speed Mixer PD/007/04 04 09.11.19 08.11.24
8 Lab Batch Manufacturing PD/008/05 05 28.12.19 27.12.24
9 Pilot Batch Manufacturing PD/009/05 05 28.12.19 27.12.24
10 Trial Batch Manufacturing PD/011/05 05 28.06.19 27.06.24
Operation,Cleaning and Calibration of Stability Chamber [CAVALLO
11 Comm Model C4TAU ]
PD/012/04 04 06.05.20 05.05.25

Operation and Calibration of UV-Visible Spectrophotometer (Model-


12 UV 1650 PC) PD/013/04 04 06.05.20 05.05.25
13 Operation and Calibration of Shaker (Model-3017) PD/014/04 04 16.05.20 15.05.25
Operation, Maintenance, Cleaning & calibration of IR Moisture
14 analyzer [ Sartorius Model MA 45 ]
PD/015/04 04 11.06.20 10.06.25
15 Operation, Calibration and Cleaning of Water Bath (Model-1005) PD/017/04 04 26.06.20 25.06.25
Operation, Calibration and Cleaning of Disintegration Tester (Model-
16 ZT 301) PD/018/04 04 02.07.20 01.07.25
17 Operation of Water Purification System (Model-Arium 611DI) PD/019/04 04 06.07.20 05.07.25
Operation, Maintenance & Cleaning and Calibration of Friability
18 Tester [ Model PTF 20E ]
PD/020/04 04 10.07.20 09.07.25

Operation, Maintenance and Cleaning of Tablet Hardness Tester


19 [ Model PTB 302 ] PD/024/04 04 02.08.20 01.08.25
20 Use & Maintenance of Refrigerator PD/029/04 04 05.10.20 04.10.25
21 Operation and Cleaning of Drying Oven PD/030/04 04 05.10.20 04.10.25
Operation, Cleaning and Calibration of Mettler Toledo Melting Point
22 Apparatus PD/031/04 04 05.10.20 04.10.25
Preparation of Batch Manufacturing Records (BMR) & Batch
23 PD/033/05 05 14.03.23 13.03.28
Packaging Records (BPR)
Operation, Calibration & Maintenance of Shimadzu HPLC
24 [ Model-Prominence ]
PD/034/03 03 28.06.20 27.06.25

Preparation of Specification and Standard Test Procedure for


25 Finished Product PD/035/02 02 12.11.18 11.11.23
26 Maintenance of HPLC Column PD/036/02 02 19.11.18 18.11.23

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

39 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Product Development Department

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

27 Preparation and Maintenance of Working Standard PD/037/02 02 07.02.20 06.02.25


Receiving, Storage and Preparation of Laboratory Reagents
28 PD/038/02 02 13.06.20 12.06.25
and Solvents
Management, Calibration and Maintenance of Laboratory
29 PD/039/02 02 16.06.20 15.06.25
Glasware
30 Procedure for Method Transfer PD/040/02 02 01.03.21 28.02.26
Operation, Calibration and Cleaning of Dissolution Test Apparatus
31 (Model DT 1420)
PD/041/01 01 15.08.18 14.08.23
32 Qualification & Training of PD Personnel PD/043/01 01 31.08.18 30.08.23
Operation and Maintenance of HPLC [Model Agilent 1260
33 PD/044/01 01 02.10.19 01.10.24
Infinity]
Operation, Cleaning and Calibration of Ultrasonic Bath
34 PD/045/01 01 02.10.19 01.10.24
(Model-520)
35 Calibration of HPLC [Model Agilent 1260 Infinity] PD/046/01 01 02.12.19 01.12.24
36 Analyst Validation Procedure PD/047/01 01 26.03.20 25.03.25
Lab Batch and Pilot Batch Numbering System for Products
37 PD/048/01 01 31.03.20 30.03.25
Under Development
38 Operation and Calibration of pH Meter PD/049/01 01 16.03.23 15.03.28
39 Log Book for Machine and Equipment PD/050/00 00 10.04.19 09.04.24
Operation, Calibration , Maintenance and Cleaning of Precision
40 Balance [ Sartorius Quintix5102-1S] PD/051/00 00 09.04.19 08.04.24

Operation and Calibration of Shimadzu HPLC [ Model : Prominence-


41 i ] PD/052/00 00 17.07.20 16.07.25
Operation and Maintenance of Shimaddzu HPLC
[Model:Prominence-I Plus,ID:620-PDL-753-06]
42 PD/054/00 00 21.04.19 20.04.24
Infinity]
Calibration of HPLC [Model:Shimadzu Prominence-i Plus,
ID:620-PDL-753-06]
43 PD/055/00 00 21.04.19 20.04.24
Infinity]
Operation and Maintenance of Shimaddzu HPLC
[Model:Prominence-I Plus,ID:620-PDL-753-07]
44 PD/056/00 00 22.04.19 21.04.24
Infinity]
Calibration of HPLC [Model:Shimadzu Prominence-i
Plus,ID:620-PDL-753-07]
45 PD/057/00 00 22.04.19 21.04.24
Infinity]

Operation, Calibration , Maintenance and Cleaning of Digital


46 Weighing Balance [ Sartorius Quintix 224-1S,ID. :620-PDL-745-03] PD/059/00 00 28.03.19 27.03.24

Monitoring of Temperature and Relative Humidity in Product


47 PD/060/00 00 10.06.19 09.06.24
Development Area

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

40 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Product Development Department

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

Operation, Calibration , Maintenance and Cleaning of Digital


48 Weighing Balance [ Sartorius Quintix 224-1S] PD/061/01 01 22.03.23 21.03.28

Operation and Maintenance of Thrombolyzer


49 PD/062/00 00 29.05.19 28.05.24
[Model: XR, ID: 740-QCL-780-01]
Operation and Calibration of Shaker
50 PD/063/00 00 12.05.20 11.05.25
[Model: 3017, ID: 620-PDL-718-02]
Operation and Calibration of UV-Visible Spectrophotometer
51 [ Model : UV-1900] PD/064/00 00 09.05.20 08.05.25
Operation, Calibration and Maintenance of Refrigerator [ Model : SJ-
52 VX79E-SL] PD/065/00 00 11.05.20 10.05.25
53 Operation and Calibration of Drying Oven [ Model : UF-30] PD/066/00 00 11.05.20 10.05.25
Operation, Cleaning and Calibration of Shaking Water Bath
54 [ Model : 1083]
PD/067/00 00 11.05.20 10.05.25
Operation and Maintenance of Centrifuge Machine
55 [ Model : Z 326, ID : 740-PDL-711-01]
PD/068/00 00 11.05.20 10.05.25
56 New Product Development Procedure PD/069/01 01 19.04.23 18.04.28
57 Operation and Cleaning of Laboratory Mixer and SS Bin PD/070/00 00 23.10.19 22.10.24
Operation, Calibration ,Cleaning and Maintenance of Analytical
58 Balance RADWAG [Model:AS 310.R2] PD/071/00 00 23.10.19 22.10.24
59 Operation and Cleaning of Oil Bath [Model : ONE 10] PD/072/00 00 11.05.20 10.05.25
60 Operation and Cleaning of Gansons Comminuting Mill PD/073/00 00 16.03.21 15.03.26
61 Operation and Maintenance of Photostability Chamber PD/074/00 00 12.01.21 11.01.26
62 Operation and Cleaning of Liquid Manufacturing Vessel 10 L) PD/075/00 00 16.03.21 15.03.26
63 Operation and Cleaning of Tube Sealing Machine PD/076/00 00 27.02.21 26.02.26
64 Operation, Maintenance & Qualification of Laminar Air Flow Unit PD/077/00 00 16.03.21 15.03.26
Operation and Cleaning of Pharma Chem Manual Encapsulation
65 Machine PD/078/00 00 02.03.21 01.03.26
66 Operation and Cleaning of Digital high Speed Stirrer PD/079/00 00 19.03.21 18.03.26
67 Operation and Cleaning of Laboratory Disperser PD/080/00 00 19.03.21 18.03.26
68 Operation and Maintenance of Magnetic Stirrer with Hot Plate PD/081/00 00 22.03.21 21.03.26
Operation, Calibration, Maintenance of Shimadzu HPLC [Model -
69 Prominence with Conductivity Detector] PD/082/00 00 04.01.21 03.01.26
70 Dispensing of Raw Materials PD/083/00 00 15.03.21 14.03.26
71 Operation and Cleaning of Pharma Chem Automatic Capsule Loader PD/084/00 00 15.03.21 14.03.26

Operation, Calibration, Maintenance and Cleaning of Weighing


72 Balance PD/085/00 00 11.03.21 10.03.26

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

41 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Product Development Department

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

Operation and Cleaning of Cream & Ointment Manufacturing


73 PD/086/00 00 18.03.21 17.03.26
Machine
Operation, Calibration and Maintenance of Dissolution Tester
74 PD/087/00 00 28.06.21 27.06.26
[Model: CD14]
Operation and Maintenance of IR Spectrophotometer
75 PD/088/00 00 21.08.21 20.08.26
[Model-IRSpirit]
76 Operation and Cleaning of Dispensing Booth PD/089/00 00 30.03.22 29.03.27
Operation, Maintenance, Cleaning and Calibration of
77 PD/090/00 00 20.04.22 19.04.27
Moisture Analyzer [Model: MB 120]
Operation, Maintenance and Cleaning of COPLEY Hardness
78 PD/091/00 00 30.03.22 29.03.27
Tester [Model TBF100i]
79 Operation,cleaning and Calibration of Stability Chambers PD/092/00 00 22.03.23 21.03.28
Operation and Maintenance Osmometer [Model- OsmoTouch
80 PD/093/00 00 19.06.22 18.06.27
1]
Operation, Calibration and Maintenance of Particle Size
81 PD/094/00 00 19.06.22 18.06.27
Analyzer [Model: Mastersizer 3000]
82 Operation and cleaning of Flowability Tester PD/095/00 00 29.11.22 28.11.27
Operation and Maintenance of shamadzu HPLC
83 [Model: Prominence -I plus ,With PDA Detector] PD/097/00 00 22.03.23 21.03.28

84 Calibration of HPLC [Model: shimadzu Prominance - I Plus ] PD/098/00 00 22.03.23 21.03.28

85 PD/099/00 00 16.03.23 15.03.28


Operation and Maintenance of Magnetic Stirrer with Hot Plate
Operation, Calibration and Maintenance of Pharmatest
86 Dissolution Tester [Model PTWS IIIE] PD/100/00 00 22.03.23 21.03.28

87 Operation and Maintenance of Drying Oven [ Model: VC 404 PD/101/00 00 16.03.23 15.03.28
ECO]
88 Operation and Maintenance of Filtration Unit PD/102/00 00 16.03.23 15.03.28
89 Operation and Cleaning of Vortex Mixer PD/103/00 00 16.03.23 15.03.28
90 Operation and Cleaning of Fume Cupboard PD/104/00 00 16.03.23 15.03.28
91 Operation and Calibration of Shaker [Model: VS 15 0] PD/105/00 00 16.03.23 15.03.28
Operation, Calibration, Maintenance & Cleaning of Anton
92 PD/106/00 00 22.03.23 21.03.28
paar Polarimeter ( Model : MCP 5100 ).
93 Handling of Intermediate, Bulk and Finished Product PD/109/00 00 16.03.23 15.03.28
94 Disposal of Laboratory Waste PD/110/00 00 16.03.23 15.03.28

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

42 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Quality Control Department

Sl. Title SOP No. Revision Effective Review


No. No. Date Date
1 Quality Control Laboratory Set-up & Standard Activity QC/001/05 05 13.06.19 12.06.24
2 Physical, Chemical & Instrumental Analysis QC/002/05 05 13.07.19 12.07.24
Copntrol of Personnel Entry/Exit in Quality Control Laboratory
3 QC/003/05 05 16.08.19 17.08.24
4 Qualification & Calibration of Analytical Instruments QC/004/05 05 16.09.19 15.09.24
5 Management, Calibration & Maintenance of Glassware QC/005/05 05 22.06.19 21.06.24
6 Qualification & Training of QC Personnel QC/006/04 04 29.12.19 28.12.24
Preparation, Handling & Use of Reference Standard/Working
7 QC/007/05 05 25.07.19 24.07.24
Standard
Preparation & Storage of Laboratory Chemicals &
8 QC/008/05 05 22.06.19 21.06.24
Reagents
9 Disposal of Laboratory Wastage QC/009/04 04 03.02.20 02.02.25
10 Preparation, Storage & Uses of 70% IPA Solution QC/011/02 02 05.05.20 04.05.25
Operation, Calibration & Maintenance of Drying Oven
11 QC/012/03 03 13.09.18 12.09.23
[ Binder Drying Oven : FED400 ]
12 Operation, Cleaning & Calibration of Sampling Booth QC/013/04 04 06.01.20 05.01.25
13 Cleaning of Sampling Tools QC/014/04 04 06.01.20 05.01.25
Operation, Calibration & Maintenance of Analytical Balance
14 QC/015/03 03 30.09.18 29.09.23
[METTLER TOLEDO Model PB4002-S] AB-3
15 Sampling of Raw Materials QC/016/05 05 06.09.19 05.09.24
16 Sampling of Packaging Materials QC/017/04 04 31.08.18 30.08.23
Operation, Calibration & Maintenance of Analytical Balance
17 QC/018/03 03 30.09.18 29.09.23
[METTLER TOLEDO Model PB4002-S] AB-4
18 Release, Rejection & Retest of Incoming Materials QC/019/07 07 26.10.22 25.10.27
Operation, Calibration & Maintenance of Analytical Balances
19 QC/020/02 02 28.06.20 27.06.25
[SHIMADZU Model : TX223L]
Operation & Calibration of Osmometer (Model : Osmomat
20 QC/021/02 02 16.03.23 15.03.28
3000D)
Operation, Calibration & Maintenance of Pharma Test
21 QC/022/02 02 11.11.20 10.11.25
Hardness Tester (Model: PTB 511E)
22 Out of Specification Handling QC/023/05 05 23.05.21 22.05.26
Operation, Calibration & Maintenance of Brookfield Digital
23 QC/024/04 04 04.04.23 03.04.28
Viscometer [ Model : RVDV-I + ]
24 Operation, Cleaning and Calibration of Heating Block QC/025/02 02 20.10.20 19.10.25
Operation, Calibration & Maintenance of Shimadzu HPLC
25 QC/027/05 05 13.11.20 12.11.25
Instruments [ Model LC –2010A HT ] Quaternary Gradient
Operation, Calibration & Maintenance of Shimadzu Atomic
26 QC/028/04 04 08.10.19 07.10.24
Absorption Spectrophotometer [Model : AA-6300]
Operation, Calibration & Maintenance of Shimadzu UV –
27 QC/029/05 05 02.09.18 01.09.23
Visible Spectrophotometer [ Model UV -1650PC ]

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

43 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Quality Control Department

Sl. Title SOP No. Revision Effective Review


No. No. Date Date
Operation, Calibration & Maintenance of Pharmatest
28 QC/032/04 04 30.09.18 29.09.23
Dissolution Tester [Model PTWS IIIE]
Operation, Calibration & Maintenance of Mettler pH Meter
29 QC/033/04 04 13.09.18 12.09.23
[Model Seven-Easy]
Operation, Calibration & Maintenance of Mettler Karl-Fischer
30 QC/035/04 04 05.10.18 04.10.23
apparatus [METTLER TOLEDO Model DL32]
Operation, Calibration & Maintenance of Mettler Melting Point
31 QC/036/04 04 09.10.18 08.10.23
Apparatus [METTLER TOLEDO Model FP62]
Operation, Calibration & Maintenance of Drying Oven
32 QC/039/04 04 13.09.18 12.09.23
[Model : UFE 500]
Operation, Calibration & Maintenance of Memmert Water Bath
33 QC/040/04 04 29.12.19 28.12.24
[Model - GFL 1083]
Operation, Calibration & Maintenance of Tap Density Tester
34 QC/041/04 04 07.09.18 06.09.23
[Pharmatest Model - PT-TD1]
Operation, Calibration & Maintenance of Automatic
35 QC/042/04 04 09.10.18 08.10.23
Polarimeter [Model : AP-100]
Operation, Calibration & Maintenance of Digital Abbe
36 QC/043/04 04 12.10.18 11.10.23
Refractometer
Operation, Calibration & Maintenance of Vibratory Sieve
37 QC/044/04 04 30.01.20 29.01.25
Shaker [Model - Analysette 3]
Operation, Calibration & Maintenance of Hermle Centrifuge
38 QC/045/04 04 30.01.20 29.01.25
[Model - Z 400]
Operation, Qualification & Maintenance of NANOpure
39 QC/046/04 04 27.07.19 26.07.24
Diamond (Water Purification System) [Model : D 11941]
Operation, Qualification & Maintenance of Muffle Furnace
40 QC/047/04 04 13.09.18 12.09.23
[Model : LM 312.07]
Operation, Calibration & Maintenance of Analytical Balance
41 QC/048/05 05 05.12.19 04.12.24
[METTLER TOLEDO Model AB204-S]
Operation, Calibration & Maintenance of Vacuum Drying Oven
42 QC/049/04 04 30.01.20 29.01.25
[Binder Model - VD 23]
Operation, Calibration & Maintenance of Refrigerator
43 QC/050/04 04 03.03.20 02.03.25
[Model - FKG 311]
44 Environmental Monitoring QC/052/09 09 04.05.21 03.05.26
45 Preparation of Culture Media QC//054/06 06 10.09.21 09.09.26
Operation, Calibration & Maintenance of Pharma Test
46 QC/055/02 02 13.11.20 12.11.25
Disintegration Tester (Model: PTZ AUTO 3)
Growth Promotion and Inhibitory Test for Microbiological
47 QC/056/07 07 29.08.21 28.08.26
Media
48 Retrieval and Maintenance of Microorganisms QC/057/06 06 26.02.20 25.02.25
49 Microbial Contamination Test QC/059/09 09 18.06.23 17.06.28

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

44 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Quality Control Department

Sl. Title SOP No. Revision Effective Review


No. No. Date Date
50 Microbiological Assay of Antibiotics QC/060/05 05 05.07.19 04.07.24
Operation, Maintenance & Calibration of Incubator [Model No.
51 QC/061/05 05 01.12.19 30.11.24
INE 600]
52 Operation, Maintenance & Qualification of Autoclave Machine QC/062/06 06 25.06.23 24.06.28
[Model. No.Maintenance,
Operation, HV25] Cleaning & Qualification of Dry Heat
53 QC/063/05 05 02.01.20 01.02.25
Sterilizer
54 Operation, Cleaning and Maintenance of Microscope QC/064/05 05 28.11.20 27.11.25
Operation, Maintenance & Qualification of Laminar Air Flow
55 QC/065/06 06 31.07.19 30.07.24
Cabinet
Operation, Cleaning, Maintenance & Calibration of Cooled
56 QC/066/02 02 01.12.19 30.11.24
Incubator [Model no. ICP 500]
57 Operation, Cleaning and Maintenance of Vortex Mixture QC/067/05 05 06.11.20 05.11.25
58 Cleaning Procedure of Quality Control Laboratory QC/068/05 05 07.05.23 06.05.28
Operation, Cleaning ,Maintenance and Calibration of Vortex
59 QC/069/03 03 20.01.22 19.01.27
Mixture (Model No. VM-10 and VM-30)
60 Operation of Sterility Test Unit QC/070/06 06 07.05.23 06.05.28
61 Sterility Test QC/071/07 07 18.06.23 17.06.28
62 Bacterial Endotoxin Test QC/072/06 06 23.06.21 22.06.26
63 Bioburden Test QC/073/06 06 27.06.21 26.06.26
64 Bacterial Endotoxin Test Validation QC/074/04 04 20.01.22 19.01.27
65 Sampling of Water QC/075/08 08 21.05.23 20.05.28
Operation, Calibration & Maintenance of Agilent HPLC
66 QC/076/04 04 29.09.19 28.09.24
System [Model Agilent 1100 Series] Binary Gradient
Operation, Calibration & Maintenance of Flame Photometer
67 QC/077/04 04 16.10.19 15.10.24
[Model : 410]
Operation, Calibration & Maintenance of Liquid Particle
68 QC/078/04 04 08.04.19 07.04.24
Counter [Model : LiQuilaz E20]
69 Analytical Method Validation QC/079/04 04 14.10.19 13.10.24
70 Cleaning of Glassware use in QC Laboratory QC/080/05 05 06.02.23 05.02.28
71 Personnel Entry/Exit and Gowning for Sterility Test Room QC/082/04 04 29.12.19 28.12.24
72 Personnel Entry and Exit in Microbiology Laboratory QC/084/03 03 06.02.23 05.02.28
Operation, Calibration & Maintenance of Waters HPLC
73 QC/085/03 03 16.10.18 15.10.23
[alliance e2695]
Environment Monitoring of Hormone Product Manufacturing
74 QC/086/04 04 10.05.20 09.05.25
Area
75 Sampling of Pure Steam Condensate QC/087/04 04 14.02.22 13.02.27
Operation, Calibration & Maintenance of Shimadzu HPLC
76 QC/088/03 03 05.08.19 04.08.24
Instruments [Model: Prominence] Quaternary Gradient
77 Sample Receiving for QC Analysis QC/089/03 03 16.01.23 15.01.28

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

45 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Quality Control Department

Sl. Title SOP No. Revision Effective Review


No. No. Date Date
Operation,Calibration & Maintenance of Ultrasonic bath
78 QC/090/03 03 16.01.23 15.01.28
[ Hawsin,Korea, Model:Powersonic 520 ]
79 Efficacy Test of Disinfectant QC/091/03 03 06.02.23 05.02.28
Procedure for Settle Plate Preparation for Environment
80 QC/092/02 02 03.09.19 02.09.24
Monitoring
81 Operation and Cleaning of Dynamic Pass Box QC/093/02 02 01.09.19 31.08.24
Operation, Calibration & Maintenance of Shimadzu HPLC
82 QC/094/02 02 31.10.19 30.10.24
Instruments [Model : Prominence] Quaternary Gradient-2
Operation, Calibration & Maintenance of Agilent HPLC
83 QC/095/02 02 10.11.19 09.11.24
System [Model : Agilent 1260 Infinity] Quaternary Gradient
84 Operation and Cleaning of Anaerobic Jar QC/096/02 02 06.03.20 05.03.25
Operation, Qualification & Maintenance of Biological Safety
85 QC/098/02 02 07.05.23 06.05.28
Cabinet [Model No. AC2 - 5E1]
Operation, Maintenance & Qualification of Refrigerator
86 QC/100/01 01 21.08.18 20.08.23
[Model No. SJPE62 LH]
Operation, Calibration & Maintenance of Conductivity Meter
87 QC/101/01 01 12.08.18 11.08.23
(Model : S230]
Operation, Maintenance, Cleaning & Calibration of Portable
88 QC/102/03 03 16.04.23 15.04.28
Airborne Particle Counter (Model No. 9500-01)
Operation, Calibration & Maintenance of Agilent HPLC
89 QC/103/01 01 23.12.18 22.12.23
System [Model : Agilent 1260 Infinity] Binary Gradient
Operation, Calibration & Maintenance of Analytical Balance
90 QC/104/01 01 19.01.19 18.01.24
[Model : AS310.R2] Radwag
Operation, Calibration & Maintenance of Potentiometer with
91 QC/105/01 01 20.01.19 19.01.24
Karl Fisher Titratoe [Model : Titroline 7750]
Operation, Calibration & Maintenance of Shimadzu
92 UV - Visible Spectrophotometer QC/106/01 01 09.05.19 08.05.24
[Model : UV-1800]
93 Analyst Validation QC/107/01 01 11.03.19 10.03.24
94 Sterility Test Validation QC/108/02 02 17.07.21 16.07.26
95 Operation, Cleaning and Calibration of Micropipette QC/109/01 01 28.02.20 27.02.25
96 Bacterial Endotoxins Test by Kinetic-Turbidimetric Method QC/110/01 01 31.05.20 30.05.25
Operation, Cleaning, Maintenance and Qualification of
97 QC/111/01 01 31.05.20 30.05.25
Absorbance Microplate Reader
98 Personnel Hygiene Monitoring and Qualification QC/112/02 02 29.12.19 28.12.24
Operation, Calibration & Maintenance of Analytical Balance
99 QC/113/01 01 09.08.20 08.08.25
[Model : PA224] OHAUS, USA
Operation, Calibration & Maintenance of Shimadzu Total
100 QC/114/01 01 26.08.20 25.08.25
Organic Carbon Analyzer
Bacterial Endotoxins Test and Total Organic Carbon Test of
101 QC/115/01 01 20.09.20 19.09.25
WFI from Product Manufacturing Vessel

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

46 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Quality Control Department

Sl. Title SOP No. Revision Effective Review


No. No. Date Date
Operation, Calibration & Maintenance of Automatic
102 QC/116/01 01 23.09.20 22.09.25
Polarimeter [Model: ADP650]
Operation, Calibration & Maintenance of PerkinElmer Gas
103 QC/117/01 01 15.11.20 14.11.25
Chromatography [Model: Clarus 580]
Operation, Calibration & Maintenance of Shimadzu HPLC
104 QC/118/01 01 02.03.21 01.03.26
Instruments [Model: Prominence-i] Quaternary Gradient
Operation, Calibration & Maintenance of Laboratory Drying
105 QC/119/01 01 08.04.23 07.04.28
Oven [Model: Ecocell 111]
Operation, Calibration & Maintenance of Rotary Evaporator
106 QC/120/01 01 08.04.23 07.04.28
[Model: Hei-VAP Value]
Operation, Calibration & Maintenance of Mettler Toledo pH
107 QC/121/01 01 08.04.23 07.04.28
Meter [Model: SevenCompact S210]
Operation, Calibration & Maintenance of Melting Point
108 QC/122/01 01 07.04.23 06.04.28
Apparatus [Model: KSP1D]
Operation, Calibration & Maintenance of Muffle Furnace
109 QC/123/01 01 07.04.23 06.04.28
[Model: Nabertherm L5/13]
Operation, Qualification,Cleaning & Maintenance of
110 QC/124/01 01 08.05.23 07.05.28
Dissolution Tester [Model: PTWS D620]
111 Operation and Maintenance of Hand Dryer QC/125/01 01 05.06.23 04.06.28
112 Operation and Maintenance of IPA Dispenser QC/126/01 01 04.06.23 03.06.28
113 Antimicrobial Preservative Efficacy Test QC/127/00 00 12.09.18 11.09.23
Operation, Calibration & Maintenance of Memmert Vacuum
114 QC/128/00 00 22.09.18 21.09.23
Drying Oven [Model: VO 200]
Operation, Calibration & Maintenance of Malvern Particle
115 QC/129/00 00 24.09.18 23.09.23
Distribution Analyzer [Model:Mastersizer 3000]
Operation, Maintenance & Qualification of Refrigerator [Model
116 QC/130/01 01 16.02.23 15.02.28
No. SJPE62 LH-HS]
Operation, Calibration & Maintenance of Analytical Balance
117 QC/131/00 00 26.11.18 25.11.23
[Model : PB4002-S]
Operation, Qualification & Maintenance of Shimadzu IR
118 QC/132/00 00 31.12.18 30.12.23
Spectrophotometer Tracer-100 [Model : IRTracer-100]
Operation, Qualification & Maintenance of Potentiometer with
119 QC/133/00 00 05.02.19 04.02.24
Karl Fisher Titrator [Model:Titroline 7750]
Operation, Qualification & Maintenance of Liquid Particle
120 QC/134/01 01 06.03.23 05.03.28
Counter [Model: APSS-2000]
121 Analyst Validation For Microbiology Laboratory QC/136/00 00 25.03.19 24.03.24
122 Validation for Container-Closure System Integrity QC/137/00 00 30.03.19 29.03.24
Operation, Calibration & Maintenance of Shimadzu HPLC
123 Instruments Model: Prominence-I (LC-2030 Plus) Quaternary QC/138/00 00 24.04.19 23.04.24
Gradient with RID

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

47 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Quality Control Department

Sl. Title SOP No. Revision Effective Review


No. No. Date Date
Operation, Calibration & Maintenance of Shimadzu HPLC
124 Instruments Model: Prominence-I (LC-2030 Plus) Quaternary QC/139/00 00 21.04.19 20.04.24
Gradient
Operation, Calibration & Maintenance of Sartorius analytical
125 QC/140/00 00 14.07.19 13.07.24
balance Model:QUINTIX224-1S
Operation, Maintenance, Cleaning & Calibration of Active Air
126 QC/141/01 01 09.11.19 08.11.24
Sampler [Model No. SAS Super ISO 180]
Operation, Maintenance, Cleaning & Calibration of Analytical
127 QC/142/00 00 21.07.19 20.07.24
Balanceb [Model No. AS310.X2]
128 Identification and Purity Check of Microorganisms QC/143/00 00 30.07.19 29.07.24
Operation, Calibration & Maintenance of Shimadzu UV-
129 QC/144/00 00 22.09.19 21.09.24
Visible Spectrophotometer [Model :UV-1900]
Operation, Maintenance & Qualificatiion of Autoclave [Model
130 QC/145/00 00 25.09.19 24.09.24
No. HV110]
Operation Maintenance & Qualification of Vortex Mixture
131 QC/146/00 00 12.10.19 11.10.24
[Model No. MX-S]
Operation Maintenance & Qualification of Incubator [Model
132 QC/147/00 00 12.10.19 11.10.24
No. BD 400]
Operation, Calibration & Maintenance of Muffle Furnace
133 QC/148/00 00 28.10.19 27.10.24
[Model: Nabertherm LT 5/13]
Operation, Calibration & Maintenance of METTLER TOLEDO
134 QC/149/00 00 12.02.20 11.02.25
pH Meter [Model: Seven Compact S210]
Operation, Calibration & Maintenance of Shimadzu HPLC
135 QC/150/00 00 15.02.20 14.02.25
[Model: Prominence-I, LC-2030C]
Operation, Calibration & Maintenance of Oil Bath
136 QC/151/00 00 22.02.20 21.02.25
[Model: Memmert, ONE10]
Operation, Calibration & Maintenance of Shimadzu HPLC
137 QC/152/00 00 23.02.20 22.02.25
[Model: Prominence]
Operation, Calibration & Maintenance of Shimadzu Atomic
138 QC/153/00 00 24.02.20 23.02.25
Absorption Spectrophotometer [Model: AA-7000]
Operation, Calibration & Maintenance of Telendy Hanson
139 QC/154/00 00 21.09.20 20.09.25
Dissolution Tester [Model: CD 14]
140 Operation, Cleaning, Maintenance & Calibration of Incubator QC/155/00 00 21.11.20 20.11.25
Operation, Cleaning, Maintenance & Calibration of Cooled
141 QC/156/00 00 21.11.20 20.11.25
Incubator

142 Operation, Calibration & Maintenance of Shimadzu HPLC QC/157/00 00 02.03.21 01.03.26
Instruments [Model: LC-2030C 3D Plus] Quaternary Gradient
Total Viable Spore Count and Purity Check of Microorganism
143 QC/158/00 00 25.03.21 24.03.26
in Biological Indicator

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

48 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Quality Control Department

Sl. Title SOP No. Revision Effective Review


No. No. Date Date
Test for Objectionable Microorganism (Burkholderia cepacia
144 QC/159/00 00 29.08.21 28.08.26
Complex)
145 Rejection and disposal of HPLC Column QC/160/00 00 24.05.21 23.05.26
Out of Specification (OOS) and Out of Trend (OOT) Handling
146 QC/161/00 00 03.11.21 02.11.26
for Micribiological Test Result
147 HPLC Column Management QC/162/00 00 09.06.22 08.06.27
Operation, Qualification, Maintenane & Cleaning of ICP-MS
148 QC/163/00 00 24.07.22 23.07.27
[Model: NexION 1000]
Operation, Calibration, Maintenane & Cleaning of Anton Paar
149 QC/164/00 00 21.07.22 20.07.27
polarimeter (Model: MCP 5100)
Operation, Calibration, Maintenannce & Cleaning of Metrohm
150 QC/165/00 00 06.09.22 05.09.27
Conductivity Meter (Model: 912)
Operation, Qualification, Maintenane & Cleaning of Microwave
151 QC/166/00 00 17.10.22 16.10.27
Sample Preparation System (Titan-MPS)
Operation, Function Check, Cleaning and Maintenane of
152 QC/167/00 00 01.11.22 31.10.27
Karl-Fischer Titrator (Model : Metrohm Titrando 890)
Operation, Cleaning, Maintenance and Calibration of
153 QC/168/00 00 20.12.22 19.12.27
Sherwood Flame Photometer (425)
Operation, Calibration, Maintenance & Cleaning of Metrohm
154 QC/169/00 00 06.02.23 05.02.28
pH Meter (Model: 913)
155 Document Numbering System in Quality Control Department QC/170/00 00 06.02.23 05.02.28
156 Rounding off Analytical Test Results QC/171/00 00 02.02.23 01.02.28
157 Destruction of the Pharmaceutical Samples after analysis QC/172/00 00 09.03.23 08.03.28
Operation, Cleaning , Maintenance and Qualification of
158 Refrigerator [Model No.:SJ-EX735P-SL], used as stability QC/173/00 00 16.03.23 15.03.28
Chamber
Operation, Cleaning , Maintenance and Qualification of
159 QC/174/00 00 06.03.23 05.03.28
Laminar Air Flow cabinet [Model: LVG-3AG-F8]
Operation, Maintenannce,Cleaning & Calibration of Analytical
160 QC/175/00 00 15.03.23 14.03.28
Balance (Model: BCE 4202I-1S)
161 Handling of water test result failure QC/176/00 00 16.03.23 15.03.28
Operation, Cleaning , Maintenance and Qualification of
162 QC/177/00 00 16.03.23 15.03.28
Stability Chamber [Model No.:KBF 1020]
Operation, Cleaning , Maintenance and Qualification of Fume
163 QC/178/00 00 16.03.23 15.03.28
Cupboard [Model No.: OR-ST1200]
Operation, Cleaning, Qualification & Maintence of Agilent
164 QC/179/00 00 16.03.23 15.03.28
HPLC [Model: Agilent 1260 Infinity II] Binary Gradient

Prepared By: Checked By: Approved By:

Md. Shariful Alam Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

49 of 52
POPULAR PHARMACEUTICALS LTD.

SOP List

Quality Assurance Department

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

1 SOP on SOP QA/001/07 07 26.06.23 25.06.26


2 Batch Numbering System of Products QA/002/08 08 01.02.22 31.01.27
3 Assignment of Manufacturing and Expiration Date of Products QA/003/06 06 01.01.19 31.12.23

In-Process Control (IPC) for Oral Solid Dosage Forms


4 QA/004/04 04 07.07.19 06.07.24
(Tablet and Capsule)
Operation and Cleaning of Pharma Test Friability Tester
5 QA/007/05 05 15.06.19 14.06.24
[Model PTF 20E]
6 Visual Inspection of Coated Tablet QA/009/04 04 20.04.20 19.04.25
7 Rework QA/011/06 06 28.07.23 27.07.26
8 Deviation Reporting QA/012/06 06 09.04.19 08.04.24
9 Release/Rejection of Product QA/014/07 07 09.04.19 08.04.24
10 Approval of Materials from New Source QA/015/04 04 20.06.23 14.02.24
19.06.28
Time Limit for holding Materials, Intermediates and Bulk
11 QA/016/04 04 08.06.20 07.06.25
Products under Process
12 Change Control QA/017/06 06 29.12.20 28.12.25
13 Batch Records Compilation and Archiving QA/018/04 04 28.03.20 27.03.25
14 Batch Production Record Review and Reconciliation QA/019/04 04 28.03.20 27.03.25
15 Correction of Documentation Errors QA/020/05 05 18.11.19 17.11.24
16 Reprocessing and Repackaging QA/021/05 05 26.10.19 25.10.24
17 Product Complaint Handling QA/022/07 07 30.04.23 29.04.28
18 Product Recall QA/023/05 05 05.08.19 04.08.24
19 Line Clearance QA/024/04 04 22.09.20 21.09.25
20 Sampling of Products for QC Analysis QA/025/05 05 28.09.19 27.09.24
21 Self Inspection (Internal Quality Audit) QA/026/04 04 27.08.20 26.08.25
22 Issuance of Batch Production Records (BMR & BPR) QA/027/04 04 28.03.20 27.03.25
23 Handling of Retention Sample QA/029/04 04 28.11.18 27.11.23
24 Batch Failure Investigation QA/030/05 05 12.08.20 11.08.25
In-Process Control (IPC) for Liquid, Semi Solid and Powder
25 QA/031/04 04 05.05.20 04.05.25
for Suspension/Syrup/Injection
26 Basic Rules for Good Manufacturing Practice QA/034/05 05 01.11.20 31.10.25
27 Personnel Hygiene Practices QA/035/05 05 01.11.20 31.10.25
28 Document Control QA/036/05 05 24.05.21 23.05.26
29 Training of Quality Assurance Personnel QA/038/04 04 14.06.20 13.06.25
30 General Housekeeping QA/040/05 05 22.02.23 21.02.28
31 Employee Signature List QA/041/04 04 02.03.23 01.03.28
Operation, Calibration, Function Check and Cleaning of
32 QA/042/05 05 28.04.19 27.04.24
Analytical Balance Sartorius [Model CP323 S]

Prepared By: Checked By: Approved By:

Md. Shariful Aalm Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

50 of 52
Quality Assurance Department

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

Operation, Maintenance and Cleaning of Electrolab


33 QA/044/04 04 07.04.23 06.04.28
Disintegration Tester [ ED-2L ]
34 Annual Product Quality Review QA/045/05 05 16.04.23 15.04.28
35 Authorization and Disposal of Materials and Products QA/046/04 04 26.07.19 25.07.24
36 Vendor Audit QA/047/03 03 29.11.19 28.11.24
Corrective Action and Preventive Action (CAPA) and Tracking
37 QA/048/04 04 29.03.23 28.03.28
System
38 Technology Transfer from a Contarct Manufacturer QA/051/03 03 14.12.18 13.12.23
39 Handling of TSE Certificate QA/052/03 03 23.12.18 22.12.23
40 Refurbishing Returned/Damaged Finished Product QA/053/03 03 30.12.18 29.12.23
41 Process Validation QA/054/03 03 29.01.23 28.01.28
42 Long Term Stability Study QA/057/03 03 12.02.19 11.02.24
Operation, Maintenance and Cleaning of Electrolab Friability
43 QA/059/03 03 29.01.19 28.01.24
Tester [Model EF-2]
Operation, Maintenance and Cleaning of Electro Pharma Leak
44 QA/060/04 04 13.04.23 12.04.28
Test Apparatus [ Model LT-101 ]
45 Use and Control of Hand Sanitizer QA/064/03 03 18.07.19 17.07.24
Operation and Cleaning of Digital Thermo Hygrometer
46 QA/065/03 03 28.09.19 27.09.24
[ID. No.: PPL-DTH-QA-01]
47 Quality Risk Management QA/066/03 03 01.09.19 31.08.24
48 Inprocess Control for Packaging Operation QA/069/03 03 12.12.19 11.12.24
49 Control and Issuance of Logbooks QA/071/05 05 29.12.22 28.12.27
50 Cold Chain Management QA/072/03 03 30.12.20 29.12.25
51 Leak Test QA/073/02 02 13.04.23 12.04.28
Operation, Cleaning and Maintenance of Electrolab Leak Test
52 QA/076/03 03 13.04.23 12.04.28
Apparatus [ Model LT-101P ]
53 File Numbering System in QA Department QA/077/02 02 24.07.19 23.07.24
Operation, Cleaning and Maintenance of RADWAG Moisture
54 QA/079/02 02 12.07.20 11.07.25
Analyzer [MAC50/WH]
Operation, Maintenance and Cleaning of Pharma Test
55 QA/080/02 02 28.11.20 27.11.25
Hardness Tester [Model PTB 511 E]
Review of Documents and Release of Toll Manufacturing
56 QA/082/01 01 06.05.19 05.05.24
Product (Manufactured for PPL by GPL)
57 Media Fill Validation QA/083/02 02 02.04.19 01.04.24
Operation,Cleaning and Maintenance of RADWAG Moisture
58 QA/086/01 01 22.11.18 21.11.23
Analyzer [MA 50.R.WH]
Operation, Calibration, Function Check, Cleaning and
59 Maintenance of Analytical Balance RADWAG QA/088/01 01 13.12.18 12.12.23
[Model AS 310.R2]
Assignment of Manufacturing and Expiration Date of Toll
60 QA/089/01 01 01.01.19 31.12.23
Manufacturing Product (Manufactured by GPL)
61 Code Numbering System of Materials and Products QA/090/02 02 28.12.22 27.12.27

Prepared By: Checked By: Approved By:

Md. Shariful Aalm Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

51 of 52
Quality Assurance Department

Sl. Title SOP No. Revision Effective Review


No. No. Date Date

Operation,Cleaning and Maintenance of Logan Hardness


62 QA/094/01 01 07.10.20 06.10.25
Tester [HDT-400L]
63 Pharmacovigilance System QA/095/01 01 14.01.23 13.01.28
Operation, Calibration & Maintenance of Mettler Toledo pH
64 QA/096/01 01 20.11.20 19.11.25
Meter [ Model S220 & S210 ]
65 Sampling of Finished Products for QC Analysis QA/097/00 00 07.04.19 06.04.24
66 Validation of Computerized Systems QA/098/00 00 07.03.21 06.03.26
Operation and Cleaning of Portable Digital Tablet Hardness
67 QA/099/00 00 23.02.21 22.02.26
Tester [ Model HT-100TP ]
Operation and Cleaning of Electrolab Friability Tester [Model
68 QA/100/00 00 18.03.21 17.03.26
EF-2W]
Operation, Maintenance and Cleaning of Electrolab
69 QA/101/00 00 18.03.21 17.03.26
Disintegration Tester [ Model EDI-2 ]
Operation, Cleaning and Maintenance of Electrolab Leak Test
70 QA/102/00 00 18.03.21 17.03.26
Apparatus [ Model ELT-201 ]
Operation, Cleaning and Maintenance of COPLEY Hardness
71 QA/103/01 01 18.07.23 17.07.26
Tester [ Model TBF100i ]
Operation, Cleaning and Maintenance of OHAUS Moisture
72 QA/104/00 00 29.07.21 28.07.26
Analyzer [MB120]
73 Cleaning Validation QA/105/00 00 07.03.23 06.03.28
Operation, Cleaning and Maintenance of Electrolab Leak Test
74 QA/106/00 00 13.04.23 12.04.28
Apparatus [ Model LT-101P ]

Prepared By: Checked By: Approved By:

Md. Shariful Aalm Md. Shajidur Rahman Abu Shahed Ahmed


Senior Executive-QA Deputy Manager-QA Deputy General Manager-QA

52 of 52

You might also like