0% found this document useful (0 votes)
88 views2 pages

FD pdf1

The document provides a system flow diagram and details for an HVAC AC system for a pharma project in Pune, India. It outlines the internal loads, airflow rates, temperatures, and humidity details at different points in the system. It also specifies the equipment required, including dehumidification capacity, coil loads, motor details, and utility requirements.

Uploaded by

Mohsin Shaikh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
88 views2 pages

FD pdf1

The document provides a system flow diagram and details for an HVAC AC system for a pharma project in Pune, India. It outlines the internal loads, airflow rates, temperatures, and humidity details at different points in the system. It also specifies the equipment required, including dehumidification capacity, coil loads, motor details, and utility requirements.

Uploaded by

Mohsin Shaikh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Bry-Air....

# 1 in Dehumidification

SYSTEM FLOW DIAGRAM


Project Name : OPAL HVAC AC CENTAUR PHARMA PUNE Date : 20-Jan-2016
Area : AHU-54- PHARMA By : BNN

CONDITIONED SPACE

Internal Latent Load :187479 Grs/Hr


SUPPLY
After Coil

Internal Sensible Load :


108062 BTUH
6700CFM
AIR
DBT RH Abs. Hum.
RETURN
AIR 77 °F NMT20 % 21.9 Grs/# 62.1 °F
15 Grs/#
6700 CFM
6300 CFM
87.4 °F
77 °F
15 Grs/#
21.9 Grs/#

3700 CFM , 77 °F , 21.9 Grs/#

BYPASS AIR

3000 CFM
2600 CFM
100.2 °F
77 °F
6.6 Grs/#
21.9 Grs/#

PROCESS OUT

REACT IN

Precool Coil

400 CFM
PROCESS IN
REACT OUT
FRESH AIR
3000 CFM
83 °F 56 °F
154.6 Grs/# 64.8 Grs/# 74.2 °F
44.2 BTU/# 23.5 BTU/# 27.6 Grs/# MODEL FLP-5000 x 1

Heat Addition by Dehumidifier = 75168 BTUH

UTILITIES REQD.
OUR SCOPE
Precoil Load = 35485.7 BTUH = 3 TOR
After Coil = 183070.8 BTUH = 15.3 TOR
REACTIVATION
Electric = 53 KW Steam =91.12 Kgs/Hr @ 7 Kgs/cm2

MOTOR DETAILS LEGEND


Process = 3.7 KWReactivation =1.1 KW
H.B HEATER BANK
Electrical Connection ( V /Ph/Hz)415/3/50 F.B FILTER BANK
Standard Unit Dimension( Bare Unit ) =
1050 mm X 1130 mm X 1770 mm React. REACTIVATION

Dimensions shall increase for Bypass & other options e.g. After / Pre coil , fan etc.

You might also like