Cal-000-050-10 Calculation For Pipe Rack - (G1-01-Nama)

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 41

OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 1 of 41

REVISION SHEET

REV NO. DATE DESCRIPTION


0 04-Mar-23 ISSUED FOR COMMENT

     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     

Table of Contents
1. GENERAL..................................................................................................................................10
OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 2 of 41

1.1 Project Information..............................................................................................................10

1.2 Scope of Work.....................................................................................................................10

1.3 Applicable Documents.........................................................................................................11

1.3.1 Project Document.........................................................................................................11

1.3.2 Codes and Standards....................................................................................................11

1.4 Language and Units.............................................................................................................11

2 MATERIALS..............................................................................................................................11

3 LOAD AND LOAD COMBINATIONS.....................................................................................12

3.1 General................................................................................................................................12

3.1.1 Dead Load of Self weight (DL)....................................................................................12

3.1.2 Dead Load (Do)...........................................................................................................12

3.1.3 Pipe Load (PE, PO, PT)...............................................................................................12

3.1.4 Friction Load (F)..........................................................................................................14

3.1.5 Anchor Load (A)..........................................................................................................15

3.1.6 Live Load (L)...............................................................................................................15

3.1.7 Wind Load (W)............................................................................................................15

3.1.8 Earthquake Load (E)....................................................................................................18

3.1.9 Factored Load Combination.........................................................................................22

3.2 Loading Name & Load Combination...................................................................................24

3.2.1 Loadings Name............................................................................................................24

3.2.2 Load Combination.......................................................................................................24

4 STEEL STRUCTURES DESIGN...............................................................................................26

4.1 Design Method.....................................................................................................................26

4.2 High Strength Bolted Connection........................................................................................26

4.3 Design Strength...................................................................................................................26

4.4 Deflection Limit...................................................................................................................26

4.4.1 Deflection of Beams.....................................................................................................26


OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 3 of 41

4.4.2 Horizontal Drift............................................................................................................26

5 Structure Computer Modelling....................................................................................................27

5.1 3D model View....................................................................................................................27

5.2 3D Wire Frame....................................................................................................................28

5.3 Member Group ..................................................................................................................29

5.4 Member Properties of Pipe Rack.........................................................................................33

5.5 Member Specification..........................................................................................................34

5.5.1 Support.........................................................................................................................34

5.5.2 Release Member .........................................................................................................34

5.5.3 Truss Member ............................................................................................................35

5.6 Design Parameter.................................................................................................................36

5.6.1 Kz ..............................................................................................................................36

5.6.2 Lz.................................................................................................................................37

5.7 Loading Input.......................................................................................................................39

5.7.1 Dead Load ..................................................................................................................39

5.7.2 Pipe Empty .................................................................................................................39

5.7.3 Pipe Operating ...........................................................................................................40

5.7.4 Pipe Test......................................................................................................................40

5.7.5 Equipment Empty .....................................................................................................41

5.7.6 Equipment Operating .................................................................................................41

5.7.7 Equipment Test .........................................................................................................42

5.7.8 Friction ......................................................................................................................42

5.7.9 Wind from +X Direction ............................................................................................43

5.7.10 Wind from -X Direction...............................................................................................43

5.7.11 Wind from +Z Direction ............................................................................................44

5.7.12 Wind from -Z Direction...............................................................................................44

5.7.13 Seismic Load Seismic Definition ..............................................................................45


OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 4 of 41

6 Structural Design Summary.........................................................................................................46

6.1 Strength Check.....................................................................................................................46

6.2 Vertical Displacement Check...............................................................................................46

6.3 Horizontal Displacement Check..........................................................................................47

6.4 Support Reaction.................................................................................................................47

7 Estimated Row Material Purchased.............................................................................................47

ATTACHMENT-1 STAAD PRO INPUT


ATATCHMENT-2 FOUNDATION CALCULATION
OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 5 of 41

1. GENERAL
1.1 Project Information

 Project Title : OIL GAS REFINERY PLANT


 Owner : COMPANY
 Location : CEPU-BLORA

1.2 Scope of Work

The purpose of this calculation note is to check the adequacy of Steel Pipe Rack
structure to sustain the loads that may occur during the construction & operation..
Definition of the checking procedure given hereafter includes the assumptions, the
method of analysis and the data to be used.

1.3 Applicable Documents

1.3.1 Project Document

ENG-JOB-001-TCIV-BOD-03-001 : Design Parameter & Criteria for Civil & Structure

1.3.2 Codes and Standards


The following specifications, standards and drawings shall be applied to the design
and details of the above, mentioned work in conjunction with this specification:

• ACI 318 – 05 American Concrete Institute.


• AISC 13th Edition (ASD) American Institute of Steel Construction.
• ASCE 7 – 16 American Society of Civil Engineers - Minimum
Design Loads for Buildings and Other Structures.
• SNI 03-1727-2013 Standar Nasional Indonesia - Beban Minimum
untuk Perancangan Bangunan Gedung dan
Struktur Lain.
• SNI 03-1726-2019 Standar Nasional Indonesia - Tata Cara
Perencanaan Ketahanan Gempa untuk Struktur
Bangunan Gedung dan Non Gedung.
OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 6 of 41

1.4 Language and Units

(1) Language
English shall be used.

(2) Units
SI unit shall be used. Nominal pipe size may be in inches.

2 MATERIALS

 Yield strength for steel structure fy = 23.5 kN/cm2


 Compressive strength of concrete fc' = 20 Mpa = 250 kg/cm2 (K-250)
 Yield strength for deform rebar fy = 4800 kg/cm (U-48)
 Unit weight of reinforcement concrete c = 2400 kg/m3
 Unit weight of soil s = 2000 kg/m3
 Unit weight of water w = 1000 kg/m3

3 LOAD AND LOAD COMBINATIONS

3.1 General
The following loads and forces shall be considered in structural and foundation design of
shelter:

Table 2. Load Cases

Symbol Loads and Forces


DL Dead Load of Selfweight
LL Live Load
PE Pipe Empty
PO Pipe Operating
PT Pipe Test
F Friction
A Anchor
W Wind Load
S Earthquake/Seismic Load
OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 7 of 41

3.1.1 Dead Load of Self weight (DL)

Weight of Modeled Steel Structure, generated by STAAD PRO

3.1.2 Dead Load (Do)


Dead loads are non structural items permanently attached appurtenances such as railing,
handrail, plate, grating, walkway

3.1.3 Pipe Load (PE, PO, PT)

INSERT SKETSA LOAD DISINI


OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 8 of 41

DRY O PERATING TEST

p ip e p ip e + o il p ip e + w a te r
kN kN kN
Ele v + 9.00 D (in c h )
P1 10 3.60 5.20 6.10
P2 10 3.60 5.20 6.10
P3 14 4.70 5.50 6.70
P4 16 7.60 8.90 10.30
Ele v + 7.00
P5 16 8.20 10.80 11.70
P6 12 4.20 6.60 7.40
P7 12 4.20 6.60 7.40
P8 10 3.60 5.20 6.10
P9 16 5.40 11.00 14.50
P10 16 5.40 11.00 14.50

*unit weight of pipe is refer to Pipe Data Pro

INSERT TABLE PIPE LOAD DISINI


3.1.4 Friction Load (F)
Friction force caused by the sliding of pipes due to thermal expansion

INSERT TABEL FRICTION CALCULATION DISINI


OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 9 of 41

3.1.5 Anchor Load (A)


Anchor force caused by the thermal expansion of pipes. Thrust force on the equipment, pipe
anchor, and guide forces will be included.

3.1.6 Live Load (L)


Since there is no platform installed in pipe rack therefore this load is not applicable for pipe
rack design.

3.1.7 Wind Load (W)

Wind Load calculation refers to SNI-1727-2013, Velocity Pressure above grade is shown in
below :

qz = 0.613 x Kz x Kzt x Kd x V2

Where :
qz = Velocity pressure evaluated at height z above ground
Kz = Velocity pressure exposure coefficient
Kzt = Topographic factor = 1
Kd = Wind directional factor (Table 6-4) = 0.7
V = Basic Wind Speed = 144km/hr (40 m/sec)
I = Importance factor = 1 (Category II)

Design wind pressure for main wind force resisting system of buildings shall be determined by
the following equation :

p = qz x G x Cp
Where :
p = Wind Pressure (N/m2)
G = Gust effect factor = 0.85
Cf = Pressure coefficient (Table 6-21 ASCE 7-05, force coefficient Cf for other structure category)
 WF flange side , Flat : 1.0
 WF web side : 1.8
 Pipe (Round) : 0.7

Velocity Pressure Exposure Coeffecient. Kz (Exposure D= Flat Area)


OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 10 of 41

Wind Load from Z Direction +El. +9.00

Wind Load from Z Direction +El. +7.00


OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 11 of 41

Wind Load from X Direction El +9.00

Wind Load from X Direction El +7.00

3.1.8 Earthquake Load (E)


Earthquake load shall be in accordance with SNI 1726-2019 with the following parameters:
OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 12 of 41

(1) Important Factor (I) and Occupancy Category


The occupancy Important Factor for Pipe Rack shall be taken I = 1.0
(2) Site Class : D
:

(3) Mapped Acceleration Parameters


The mapped Maximum Consider Earthquake (MCE) Spectral Response
Acceleration Parameters are taken from Puskim PU for Batulicin Area as
follows:

• At short period (0.2 sec) : SS = 0.120 g


• At 1.0 second period : S1 = 0.052 g

(4) Design Spectral Response Acceleration Parameters


• For short period : SDS = 0.200 g
• For 1 second period : SD1 = 0.120 g
• LT : 20 s
OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 13 of 41

MASUKAN DATA GEMPA CEPU, TIPE TANAH LUNAK SE

3.1.8.1 Risk Category

3.1.8.2 Seismic Importance Factor

3.1.8.3 Seismic Design Category


OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 14 of 41

3.1.8.4 Fa & Fv
OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 15 of 41

3.1.8.5 Response Modification Factor


OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 16 of 41

3.1.9 Factored Load Combination

For strength design foundations, the following load combinations shall be used.

A) Normal operation & Wind


(301) 1.2 (Ds + Do +Po+ F + A) + 1.0 Wind (+X) Direction
(302) 1.2 (Ds + Do + Po+ F + A) + 1.0 Wind (-X) Direction
(303) 1.2 (Ds + Do + Po+ F +A) + 1.0 Wind (+Z) Direction

3.1.9.1 Time Period


OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 17 of 41

3.2 Loading Name & Load Combination

3.2.1 Loadings Name

NO LOADING NAME
1 SEISMIC STRUCTURE X-DIR (+SX)
2 SEISMIC STRUCTURE X-DIR (-SX)
3 SEISMIC STRUCTURE Z-DIR (+SZ)
4 SEISMIC STRUCTURE Z-DIR (-SZ)
5 DEAD LOAD (DL)
6 LIVE LOAD (LL)
7 PIPE EMPTY (PE)
8 PIPE OPERATING (PO)
9 PIPE TEST (PT)
10 EQUIPMENT EMPTY (EE)
11 EQUIPMENT OPERATING (EO)
12 EQUIPMENT TEST (ET)
13 FRICTION (TF)
14 ANCHOR (A)
15 WIND +X (+WX)
16 WIND -X (-WX)
17 WIND +Z (+WZ)
18 WIND -Z (-WZ)
OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 18 of 41

3.2.2 Load Combination

Load Combination for design and details of steel structures shall be in accordance
with AISC WSD & ASCE 7-16 as follows

D+L
101 DL + PO + MO+ F+A + LL
D + 0.6W
201 DL + PO + MO+ F+A + 0.6 Wx
202 DL + PO + MO+ F+A - 0.6 Wx
201 DL + PO + MO+ F+A + 0.6 Wz
201 DL + PO + MO+ F+A - 0.6 Wz
D + 0.75(0.6W) + 0.75 L
301 DL + PO + MO+ F+A + 0.45 Wx + 0.75 LL
302 DL + PO + MO+ F+A - 0.45 Wx + 0.75 LL
303 DL + PO + MO+ F+A + 0.45 Wz + 0.75 LL
304 DL + PO + MO+ F+A - 0.45 Wz + 0.75 LL

0.6 D + 0.6W
401 0.6(DL + PO + MO+ F+ A) + 0.6 Wx
402 0.6(DL + PO + MO+ F+ A) - 0.6 Wx
403 0.6(DL + PO + MO+ F+ A) + 0.6 Wz
404 0.6(DL + PO + MO+ F+ A) - 0.6 Wz

D + 0.7 Ev + 0.7 Eh
501 1.094(DL + PO + MO+ F+A) + 0.7 Sx + 0.21 Sz
502 1.094(DL + PO + MO+ F+A) + 0.7 Sx - 0.21 Sz
503 1.094(DL + PO + MO+ F+A) - 0.7 Sx + 0.21 Sz
504 1.094(DL + PO + MO+ F+A) - 0.7 Sx - 0.21 Sz
505 1.094(DL + PO + MO+ F+A) + 0.7 Sz + 0.21 Sx
506 1.094(DL + PO + MO+ F+A) + 0.7 Sz - 0.21 Sx
507 1.094(DL + PO + MO+ F+A) - 0.7 Sz + 0.21 Sx
508 1.094(DL + PO + MO+ F+A) - 0.7 Sz - 0.21 Sx

D + 0.525 Ev + 0.525 Eh + 0.75 LL


OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 19 of 41

601 1.07(DL + PO + MO+ F+A) + 0.525 Sx + 0.158 Sz + 0.75 LL


602 1.07(DL + PO + MO+ F+A) + 0.525 Sx - 0.158 Sz + 0.75 LL
603 1.07(DL + PO + MO+ F+A) - 0.525 Sx + 0.158 Sz + 0.75 LL
604 1.07(DL + PO + MO+ F+A) - 0.525 Sx - 0.158 Sz + 0.75 LL
605 1.07(DL + PO + MO+ F+A) + 0.525 Sz + 0.158 Sx + 0.75 LL
606 1.07(DL + PO + MO+ F+A) + 0.525 Sz - 0.158 Sx + 0.75 LL
607 1.07(DL + PO + MO+ F+A) - 0.525 Sz + 0.158 Sx + 0.75 LL
608 1.07(DL + PO + MO+ F+A) - 0.525 Sz - 0.158 Sx + 0.75 LL

0.6 D - 0.7 Ev + 0.7 Eh


701 0.506 (DL + PO + MO+ F+ A) + 0.7 Sx + 0.21 Sz
702 0.506 (DL + PO + MO+ F+ A) + 0.7 Sx - 0.21 Sz
703 0.506 (DL + PO + MO+ F+ A) - 0.7 Sx + 0.21 Sz
704 0.506 (DL + PO + MO+ F+ A) - 0.7 Sx - 0.21 Sz
705 0.506 (DL + PO + MO+ F+ A) + 0.7 Sz + 0.21 Sx
706 0.506 (DL + PO + MO+ F+ A) + 0.7 Sz - 0.21 Sx
707 0.506 (DL + PO + MO+ F+ A) - 0.7 Sz + 0.21 Sx
708 0.506 (DL + PO + MO+ F+ A) - 0.7 Sz - 0.21 Sx

4 STEEL STRUCTURES DESIGN


4.1 Design Method

The design and details of steel structures shall be in accordance with the AISC “Manual of
Steel Construction ASD, Thirteenth Edition”,

4.2 High Strength Bolted Connection

High Strength bolted connection shall be designed as bearing-type connections, with threads
included. The allowable loads shall be based on all bolts having threads in the shear plane.

4.3 Design Strength

Design yield strength of structural steel shall be 235 Mpa.


OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 20 of 41

4.4 Deflection Limit

4.4.1 Deflection of Beams

Allowable vertical displacement shall not exceed L/240 (L = beam or girder support length).
4.4.2 Horizontal Drift

Allowable horizontal displacement shall not exceed H/100 (H = the height of structure).

5 Structure Computer Modelling

5.1 3D model View

Picture 1. 3 D Model of Pipe Rack


OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 21 of 41

5.2 3D Wire Frame

Isometric View
OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 22 of 41

Side View

Front View
OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 23 of 41

5.3 Member Group

Member Group C1 (H200x200)

Member Group T1 (WF250X125X)


OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 24 of 41

Member Group T2 (WF250X125X)

Member Group T3 (WF 200X100)

Member Group L1 (W20X100)


OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 25 of 41

Member Group L2 (WF150X75)

Member Group L3 (WF200X100)


OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 26 of 41

Member Group VB (Double L80x80)

Member Group HB (Double L80x80)

5.4 Member Properties of Pipe Rack

Member Occupation
Properties Material
Group
C1 Column H200X200x5x8 steel
OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 27 of 41

Member Occupation
Properties Material
Group
T1 Transversal Beam Elev +7.00 WF150X75 steel
T2 Transversal Beam Elev +9.00 WF200X100 steel
T3 Diaphragm Beam Elev +7.00 & +9.00 WF200X100 steel
L1 Longitudinal Beam Elev +7.00 & +9.00 WF200X100 steel
L2 Diaphragm Beam Elev +7.00 & +9.00 WF150X75 steel
L3 Longitudinal Beam Elev +7.00 WF200X100 steel
VB Bracing Vertical Double L80x80 steel
HB Horizontal Bracing Double L80x80 steel

5.5 Member Specification

5.5.1 Support

All Support are pinned


OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 28 of 41

5.5.2 Release Member

Release Member at El +7.00 & +9.00 (released at My, Mz)

5.5.3 Truss Member


OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 29 of 41

5.6 Design Parameter

5.6.1 Kz

Kz = 0.5
OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 30 of 41

Kz = 2.8

Kz = 1.8

5.6.2 Lz
OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 31 of 41
OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 32 of 41
OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 33 of 41

5.7 Loading Input

5.7.1 Dead Load

5.7.2 Pipe Empty


OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 34 of 41

5.7.3 Pipe Operating

5.7.4 Pipe Test


OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 35 of 41

5.7.5 Equipment Empty

5.7.6 Equipment Operating


OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 36 of 41

5.7.7 Equipment Test

5.7.8 Friction
OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 37 of 41

5.7.9 Wind from +X Direction

5.7.10 Wind from -X Direction


OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 38 of 41

5.7.11 Wind from +Z Direction

5.7.12 Wind from -Z Direction


OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 39 of 41

5.7.13 Seismic Load

Seismic Definition
OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 40 of 41

6 Structural Design Summary


Generally the structure has the adequacy to sustain the loads that may occur during construction
& operation

6.1 Strength Check

Membe Beam LC REMARKS


Properties Max. Ratio
r Group No
C1 WF200X100 0.668 186 505 OK
T1 WF150X75 OK
T2 WF200X100 OK
T3 WF200X100 OK
L1 WF200X100 OK
L2 WF200X100 OK
L3 UNP125.65.6.8 OK
VB Double L80.80
HB Double L80.80 OK

6.2 Vertical Displacement Check

Beam Length All. REMARKS


Member Max. Def
Properties No mm LC Deft
Group mm
mm
C2 WF200X100
T1 WF150X75
T2 WF200X100 9-47-12 6000 5.7 503 25 OK
T3 WF200X100
L1 WF200X100
L2 WF200X100
L3 UNP125.65.6.8
VB Double L80.80
HB Double L80.80
OIL GAS REFINERY PLANT

Document No. CALCULATION FOR Revision : 0


CAL-CVL-100-05-001 STEEL PIPE RACK PR-02 Page 41 of 41

6.3 Horizontal Displacement Check

Refer to picture maximum horizontal displacement occurred at the top of column (node 4)
which is 17 mm less than 9000/100 = 90 mm) thus the horizontal displacement is sufficient.

Displacement Allowable
Node L/C REMARKS
mm Deflection mm
18 503 140 90 NOT OK

6.4 Support Reaction

7 Estimated Row Material Purchased

Member Price (12 m) Length Nos Nos Price


Properties
Group Rp m Purchased Rp
(1) (2) (1 x 2)
C2 H 200 x 200 x 8,0 x 12 10,095,999 7.0 16 16 161,535,984
T1 WF 200 x 100 x 5,5 x 8,0 4,495,000 5.0 7 4 17,980,000
T2 WF 250 x 125 x 6,0 x 9,0 6,237,000 5.0 7 4 24,948,000
T3 WF 200 x 100 x 5,5 x 8,0 4,495,000 5.0 6 3 13,485,000
L1 WF 200 x 100 x 5,5 x 8,0 4,495,000 6.0 24 12 53,940,000
L2 WF 200 x 100 x 5,5 x 8,0 4,495,000 3.0 24 6 26,970,000
L3 WF 150 x 75 x 5,0 x 7,0 2,950,000 6.0 4 2 5,900,000
VB Double L80.80 (6 m) 795,000 10.0 8 16 12,720,000
HB Double L80.80 (6 m) 795,000 7.5 8 16 12,720,000
TOTAL 330,198,984