C02 Flooding System — Fixed Fire Fighting on
Ships
(tober 25,2016 10:48 am | 37 Comments | Jaz
602 foosing system or central bank CO? system is one ofthe common fixed fre Fighting system
Installed on mast ofthe ships. I releases carbon dioxide (CO2) in bulk quantity toa protected space
(such as engine room, carge hold, purer room, pump room, et.) under fre. Smothering action of COZ
‘extinguishes the fre thereby preventing spreading offre to other parts ofthe ship. It consist of soveral
602 eylndors lecated in a separate room, called CO2 room, These bolas contain CO? in liquid stato
\When the fr in a protected space goes out of contal or ina situation when the fre is not able to
‘extinguish by local fre fighting media, CO? flooding system comes into picture. CO? from the bots
‘rected via common manifold, main valve and distribution pipe ines to nozzles tough which tis
Feleased to the protected space for fe extinction, Due to safety reasons, the CO? Nooding system Is
‘manually eleased from a release cabinet located outside the protected space,
Why C02 is used?
Carbon oxi i the fre exinguising medium used in C02 floading system. tis an effective fre
suppression agent applicable to wide range of fire hazards. Ithas a high rate of expansion which
allows ito work fast. When applied to fre, CO2 provides a heavy blanket of gas that reduces the
‘oxygen level toa palnt where combustion cannot occur. Since carbon dioxide Isa gas, there Is no
clean up associated with a system discharge. CO2, a compound of carbon and oxygen, is a colorless
85 which cause coughing to occur when inhaled. At higher concentrations itis acutely toxic. Low and
high pressure C02 is used forthe fre protection of machinery spaces, pump rooms, cargo holds, paint
stores and galley exhaust venation ducts on board ship.
‘There are several advantages for the COZ asa fr fighting medium, They are
+ Densityis 1.5 times higher than air. So CO2 settles down and displaces air.
+ Ican be easly iquefied and botied
+ 20% ~ 20% C02 concentration extinguishes fe by smothering
+ Non-corosive
+ Non- conductor of electricity
+ No residues lett after application
+ No deterioration with age
Similan there are some disadvantages also, uch as
+ CO2is highly asshyxiating. 9% concentration causes unconsciousness within minutes
+ Very litle cooling effec. Sa there is danger of reigniton.
+ When discharged, solid CO? particles present and gonerate sufficient static electrity to produce
spark
Explanation of CO2 Flooding System
‘ntpsmarinoengineeringontine.comieo2-Nooding-system-on-ships!
Categories
Select Category ¥
Select Your Topic
MEO Exam
Setety
Fr Datactor
Fee Fhing
cue Freeing
Bolles
compressors
eating
‘Sewage Treanor:
tra Gas Systm
ANirConsoing
Instumentaton ane Conta
yates
eat Exchangers
‘Stotng oer
etrgoration
comeson
Walsng
Distal Engnas
ieabone
‘Questons and Answers on Diese
Engines 1
MEO cass 2 Guoston Papas
ane811523, 12:38.AM (602 Flooding Systom -Fixed Fre Fighting on Ships
[As mentioned earlier C02 flooding system flaods the protected space under fre with carbon oxide, NEO Glass + Queston Papers
eich displaces ai, thereby removing one log of fre triangle for the extinction of fir. C2 flooding
system consist of main CO2 battles, common marifold, master valve or distbution vale and Create
istriouton pipe lines with nozzles as shown inthe gure below, Click onthe diagram to enlarge, Naval
oder
het
“if you Like it, Share it
Recent Posts
(ber Sacrty on Ships
Main C02 bots contain carbon dioxide in Iquid state witha pressure of 56 barat 20 degree Celsius.
Pressure of CO? at 25 and 30 degree Colsius are 64 bar and 71 bar respectively, So is important to
keop the temperature of CO2 bottles low fr liming the pressure inside bates. CO2 from the main Monsuing Ful sum Land on Warne
bottle is released by a C02 release cabinet as shown inthe figure. A soon as the release cabinet
‘doors opened, a miro switch is activated, The micro switch wil ensure the activation of CO2 warning
alarms and venilation shutoff. CO2 release cabinet or release box consist of two pilot CO2 cylinders SIRE Inspection on Sp
‘orbatles containing C02 gas insde, The pressure of CO2 inside these pilot bottles is same as that of.
‘main CO2 bots. Only quantity of gas is ferent. Far releasing CO2 tothe protected space, one of
the plot bottle valve is opened. Now CO2 reaches two valves marked 1 and 2. Firs valve 1 is to be cargo Sarling Procedure an Shins
‘opened, Then CO2 passes through a non return valve and opens pneumaticaly operated master valve,
Now master vale is opened. Next, open valve 2in the release cabinet, which supply CO2 to main CO2
bottle head assembly through a non retum valve and time delay uit. Function of he time delay units
Pressure Testing on boar Sips
‘vin Engine
Boll Survey on Sips
‘explained below, Head assembly consitof a pressure operated cylinder valve, This pressure operated Tags
cylinder valve prevents CO? from bottle coming tothe common manifold. As CO2 reaches the head
‘assembly from pilot botle, aneumatic actuator in the head moves and opens the pressure operated ircompressors ait conditioning
cylinder valve. Then CO2 from main bole escapes tothe common manifold via non retum valve a5
shown, Each ofthe main CO2 cylinder have @ head assembly and non return valve, The plat CO?2 Ine
Is connected to al these heads. All the C02 from the man bottles now release to common manifols trator sso ncng we syste sass
Since the master vale s already open before, CO2 from manifold i released tothe protected space
through eistibtion pipelines and nozzles.
bola toer tow dow tle age sage
sysem diesel engines explosimeter
fire detectors te tphirg He ware
{As you can see in the diagram, there are two CO? release cabinets. One is loca release cabinet an is
- i freshwater generator nasser
located in the C02 room tell. One mare remote release cabinet is used, which is located ina remote
place such as fre control station. This facilitates operation of C02 flooding system trom a remote place
‘ther than CO2 raom. Bath relaase cabinets are connected in paralial anc nan return valves fite in
the lines prevent back fow of CO2. Also two plot CO2 bottles are placed inthe release cabinet. Only
‘one is sucient forthe operation of both master valve and CO? botle head assembly.
indicator grams tga yn
synen mo eone MAKING
02 fooang sytem explained here protects oly single spaca, Tere ar ystems which ean protect engineering marine
‘mliple spaces such a engine rom and pump room together. n that case separate release cabinets engineeri
mehgie cannon renner —giginesring.
room according tthe vole of spaces. us nat ors me Class
‘exam questions panting pis
Time Delay Unit in CO2 Flooding System controller ouvert pomp
pounding poportonal contol as
C02 from the pilot bottles in release cabinet reaches main CO2 bottle head assembly trough a tine vats witein an saw ene
Gelay unit. Function ofthis time delay units to delay the supply of CO2 tothe head assembly fr 60 —
{80 seconds. n eer words, when valve 2in the release cabinet is opened, CO2 reaches only ater 60
to 90 seconds to the head assembly. Reasons for providing such as delay in CO? Nooding system are
sven below.
sewage treatment plant snct etcon
pnts of man engne ype tenia
‘ntps:tmarineengineeringonine.comlco2-ooding-systom-on-ships! 28811523, 12:38.AM (602 Flooding Systom -Fixed Fre Fighting on Ships
1. soon a8 C02 release cabinet opens, alarm is eounded inthe protected space. A time delay of
60 lo 90 seconds giva sufficient ime for any personne in the protected space to escape, even
after the operation of both valves in the release cabinet.
2.102 is released from main bots tothe common manifold before opening master valve, there
‘may be dificulty in opening master valve because of th bulk CO2 pressure acting on it. Because
ofthe time delay, positive opening ofthe master vale is ensured before releasing CO2
43, Regulation per International Code for Fire Safely System (FSS Code) 2.1.8.2 says, "The pre-
discharge alarm can be automatcally activated (e.g. by opening he release cabinet doer). The
alarm shall operate fr the length of ime needed to evacuate the space, but in no case less than
20 seconds before the medium is released.”
The time delay can be achieved In diferent ways. Out of these, two types of ime delay units
commonly used in C02 flooding system on board ships. One is electrical ype, which has an AC 220 V
Power supply, a pressure switch, ter and a solenoid valve as shown in the figure below.
To coz HEAD
ASSEMBLY
FROM PILOT
CYLINDER.
Power source is alvays avalable forthe unt Solenoid vale is normally In closed postion. When CO2
from plat cylinder (CO2 release cabinet) reaches the time delay uni, the pressure acis on the pressure
switch. This closes the pressure suite But the timer allows power supply ta the solenoid only after 60-
{90 seconds, the timing can be adjusted as required. As soon as the speced time is reached, solenoid
becomes energize and the solenoid valve wil open. This alow passage of C02 to the pressure
‘operated cylinder valve of main bottle. Normally a by pass valve Isao fited across this ime delay unit
wich can be used incase the unit goes defective
‘Another type oftime delay unt uses an emp bot ited just before the head assembly. This empty
bottle fils fst before supplying pressurised CO2 tothe head assembly. This is moce reliable since
there sno electrical components involved. Figure below 000000shows two tme delay units, one for
tengine room and the other for pur room,
‘ntps:tmarineengineeringonine.comlco2-ooding- 10 years internal and external examination required
What are the limitations on CO2 properties ?
1. CO2is heavier than air
2. Less cooling effect
5, Static electricity induced
4. Heavily asphyxiting (suffocating)
5. netfectve #> 10~ 12 minutes
6."One off no reserve
7. Total evacuation required
8, Possibly of thermal shock
9, No protection of personal
410, Expands 450 Umes is volume in auld to produce gas.
What are general inspections carried out in CO2 room 7
Check emergency ight and all other lights
Check exhaust fan / ventilation
Check all otis overall condition, clamps, valves etc
Check operating wire conattion,
Cheek C02 alarms,
(C02 room key shouldbe in positon.
Check the operating instructions,
Inspection tobe recorded in lg book and Saturday safely routine book.
What are survey items on CO2 flooding system on ships ?
|ntps:tmarineengineeringonine.comlco2-oding-systom-on-ships! 198115723, 12:38 AM (602 Flooding System -Fixed Fre Fighting on Sips
1. Check 602 weight very 2 years
2. Testing of eyincer at 228 bars
3. Blow through the ines
4, General inspection on Instuctons, Key, Emergency Ights, Ventilation, Alarms ete
What are the CO2 room safety arrangement ?
Exhaust fan and suction duct
+ Provided atthe botlom of tre C02 room,
' Any accumulated C02 from leakage atthe bottom can be exhausted to atmosphere,
elit valve
*+ Reason explained above ‘Why Reliof Valve is Required 2° section,
Chock valve
+ Fited on connection pipe between each cylinder discharge valve and marifol, so thatleakage
of one cylinder cannat effect other cylinder
Bursting dise
+ Each bottle has @ combined bursting disc, which wil rupture spontanaously at @ pressure of 177,
bar at 62°C.
Pressure gauge and pressure alarm In the mainfold
+ Reasons explained above,
References
hup:twwwimo.orgien/OurWorkiCireulars
btp:lwww doshipping govin'ContentOGSCirulars aspx
Related Posts
‘tober 14,2018 November27, 20:8. Agi29,2014 August 10,2022 August 28, 2016
Safety Deveesin Montorng ‘changing Over Pressure Testing Procedure tobe
‘Ai Compressors AuxlaryEngine Navagation Wistch on board Ships Fotowed Aer Ol
onShips Performance on st Sea Checkist ‘pil During
‘Ships Bunkering
Pongal.
‘Aotl29,2014 ——Nowenber 27,2035 December 10,2015 uy, 2018, November 22,2018
‘Sea Passage Plan Cross Head Action on Holiing Down MEO Orals on
Bearing Survey on Scavenge Freon Bats Marine Neval/ventecire
‘Shipt=Marre Ships Marne Diesel Engines Function 3 Part
Enginceing Engineering
‘ntps:tmarineengineeringonine.comlco2-ooing-systom-on-ships!
1398115923, 12388 AM (602 Flooding Systom -Fixed Fre Fighting on Ships
Posten: Fie Fighting, MEO Examination Sty Matai | Tagged: ter reeating coz, bursting se calelaon of
22 requted, co? Nooing sytem, co alesse mechan, acral ire dla Unt, haad assem, enka rant,
airtnance of c2 fading syst, pressure gauge, Passi Operated Cylinder Va, pressure switch, pressure
tasting of c2 odin syst, Purpose of Dip Tube in COZ Exner, egulstons onc? roomy, equement of 02
‘ooding syst requremants of 22,00m, safety pecautens on releasing 02, sie chart on sis, te delay unt
teal oosing sytem, why ie delay ut
37 Thoughts on “CO2 Flooding System — Fixed Fire Fighting on Ships”
Dinesh kumar
fon December 17, 2015 at 11:09 am sai
Very nice and well explained i ead it and tis all most covered all doubt about co2
Realy!
Rathore Mariner
‘on December 28, 2015 at 7:05 pm said
Very informative and so perfectly explained. Thank you
Realy!
viay
fon January 7, 2018 at 6:08 pm said
00d explanation... @
Reply,
krishraprased
fon January 19, 2016 at 11:42 am ead
superb. Thanks alot
Reply
ricks
fon January 20, 2016 at 12:45 am said
very nice explanation... good work
Realy),
Micha!
‘on February 4, 2018 at 5:42 pm said
Since 01 July 2010 by Res, MSC.206(81) Its raqured thatthe two contol “shal be provided so
they can only be operated in that order. Sequence 1-2 with postive moans ensure for that
(On ships built before year 2002 you may si find single release relaying pressure to the effect of
release controls, These arrangements are dsputable for compliance with FSS as amended,
‘ntps:tmarinoengineeringonine.comlco2-oing-systom-on-ships!
14981523, 12539.AM (602 Flooding Systom -Fixed Fre Fighting on Ships
Realy!
rathoesh rasappan
‘on February 6, 2016 at 8:45 am said
superb
Realy)
Saravana
‘on March 28, 2076 at 1:58 pm sald
‘Thank you
Replys
dinakaran
fon May 6, 2016 at 10:18 am said
Is really ustul forme todo clas 4 exa, Thank uso much
Roplys
ALEX JOHN KOSHY
con dune 14, 2016 at 8:39 pm sald
Very beautifully explained. Thanks al
Realy)
pulkt
con duly 15, 2018 at 3:13 pm sai
awesome work, very informative, thanks
Reply,
RINKAL RANA,
fon July 22,2016 at 1:27 am sai
Very helpful notes. Thanks!
Reply
Umesh Moran
con duly 26, 2016 at 6:39 pr sai
| personally found very very helpful for everyone who workin ship. From every point of view.
Realy!
‘ntps:tmarinoengineeringonine.comco2-oding-systom-on-ships!
s91981523, 12:39.AM (602 Flooding System -Fixed Fre Fighting on Ships
kumar
fon August 6, 2016 at 9:50 pm said
Master piece on Co2 floading.most ofthe doubts are clearedvery thankful for the work
Realy)
rmathukumar
‘on August 20, 2018 at 819 pm said
Very useful thank you
Realy),
Benoy John
on December 4, 2016 at 1:07 pm said
Very wall thought of and put across in a Layman's language. Very explanatory and allthe relevant
Information / Risks and Alers stated comprehensively
Most Appreciate.
Realy!
Benson
fon January 13, 2017 at 906 am said
‘Awesome post Great source. Thanks alo
Realy)
Skyadav
fon January 14, 2017 at 3.21 pm said
Very wal explained
Replys,
Hasan
fon January 21, 2017 at 11:08 pm said:
lis helptul for everyone ane specialy when we are in doubt, please follow same procedure
Thanks
Realy)
Vinod
fon February 12, 2017 at 4:35 pm sal
Very useful tanks alot
Realy!
|ntps:tmarinoengineeringoniine.comlco2-oocing-systom-on-ships!
161981523, 12:38.AM (602 Flooding Systom -Fixed Fire Fighting on Ships
CChaminda dissanayake
fon March 13, 2017 at 426 pm sai
‘Thank you
Realy)
Usnan anjana
on May 14, 2017 at 11:13 am said
Good work..very useful. thanks
Realy),
Onkar
fon dune 7, 2017 at 10:37 am said
‘Thanku very much, twas very helpful
Reply,
Vincent
‘on August 21, 2017 at 10:13 am sai
Nice work thanks a lot
Replys
cms
lon November 22, 2017 at 8:35 pr said
‘An excellent summary however,
‘C02 flooding isthe final course of action, used only when all else has fale
‘This is incorect, C02 tke any fixed installation isa firefighting tool onboard to be used as
requles by the circumstances, Oue tits smathering capactty and inabilty to cool fe
prover to bo
C02 ‘rom the beginning of an incident with na reference to trying everything alse frst, The priory
rctve whan used early. Most procedures refer to the consideration of
is always safely of life and there are obvious complications when there are missing people and
navigational hazards however that witnstancing when everyone is accounted fort should be
considered as a tool forthe jo,
Realy!
Surendra Singh
‘on Apil23, 2018 at 12:18 pm sai
Very nice, clear al te doubts regarding co2 eystem
Realy!
Ben
‘ntps:marinoengineeringonine.comlco2-oding-systom-on-ships! amie811523, 12339.AM (602 Flooding System -Fixed Fire Fighting on Ships
fon July 28, 2018 at 2:10 am said
“Thanks forthe piece. Helpful for my studies!
Realy!
kyaw
fn Octover 18, 2018 at 3:13 pm said
‘Thanks all | learned a ot rom this post,
Realy!
Vikas Nagargoja
fon January 28, 2018 at 8:35 pm said
Outstanding job
Replys,
Akash Verma
fon July 31,2019 al 2:35 pm sai:
Very nice... Really this explanation made me understand the full concept about the system
Realy
Umesh ojha
fon January 5, 2020 at 4:47 pm said
Clearly explained...Thanks
Realy)
Nahia
fon danuary 23, 2020 at 4:60 pm said
Excallent jo.
Reply)
Abhimanyu dived
fon February 3, 2020 at 1:10 pm said
‘You have done a great job.
| say thanks from deep of my heart
Realy!
Masoud
‘on February 8, 2020 at 3:40 pm said
|ntps:marineengineeringonine.comlco2-loing-systom-on-ships!
rane811523, 12:38.AM (602 Flooding Systom -Fixed Fre Fighting on Ships
Perfect
Reply!
= ‘Surarjan Ghoshal
on May 21, 2020 at 6:86 pm said:
‘Quite informative nate and explained In layman language.
I possile kinly update the notes inthe aspect of regulations as per latest curs.
Reply!
= PPanks)jain
fon July 18,2020 at 11:19 pr said
‘Covering all essential information about the topic.
‘Great effort. Weil done tear,
Reply
= Netson
‘on September 8, 2021 al 4:57 pm sad
‘Thanks
Reply!
Leave a Reply
Your email address wil not be publsned. Required flelds are marked *
website