Week 9 - Dynamic Process BehaviourV2
Week 9 - Dynamic Process BehaviourV2
Pressure
Flow
Level
Process Temperature
pH
dP cell
Capacitance I/P
Sensor Radar, Sonic
Magnetic
Resistance
IR/Laser
4-20 mA
Transmitter 1-5 Vdc
PID
Controller Fuzzy logic
4-20 mA
Transducer 3-15 psig
Linear
Control valve Equal percentage
K
Y (s ) X (s )
s 1
Process Characteristics of First
Order System
K
Y (s ) X (s )
s 1
K x
Y (s )
Output response with Step function
s 1 s as the input
• Process Gain can be used to determine the ultimate value of the
response (new steady state) for a unit step change in the input
• To calculate the process gain from the graph:
y
Process Gain, K
x
X(t)
Y(t)
t=0 t=t0
Ke st0
Y (s ) X (s )
s 1
PV ,% new s.s.
Upper base line
old s.s.
Lower base line
Td
time
MV, %
MV
time
PV ,% new s.s.
PV63.2%
TC,63.2%
old s.s. [email protected]%
Td
time
[email protected]%
MV, %
MV
time
© Abdul Aziz Ishak, Universiti Teknologi MARA Malaysia (2009)
Exercise 2
45
PV, %
40 B C process
35
30
Transfer function=
25
20
15
10 A
0 20 40 60 80 100
Time, sec
15
10 A Summary of result
0 20 40 60 80 100
Time, sec T d, s TC, s Gain
d 2Y (t ) dY (t ) b
K
2
2
2 Y (t ) KX (t ) a0
dt dt
K1K 2
Y (s )
1s 1 2s 1
K 1 overdamped
G(s) = 2 2
s 2s 1 0 1 underdampe d
1 2 1 critically damped
Y (s ) 2 2
K K x
s 2s 1
X (s ) Y (s )
2s 2 2s 1 s
Second Order Step Change
a. Overshoot – fraction of the final steady-state change
by which the first peak exceeds this change
a
os= exp
b 1 2
b. time of first maximum-time required for the output
to reach its first maximum value
tp 8/(3s2+5s+1) 8 / (3s2 +5s
1 2
+1)
SP2
Undershoot
SP1
Settling time
0 Time
1. Settling time is the period of time taken by the process reach stability.
2. Period is the time interval between two succesive peaks.
3. Overshoot is the process response (PV) surpasses the set point.
4. Undershoot is the process response (PV) goes below the set point.
5. Risetime is the period of time taken by the process to reach the setpoint.
© Abdul Aziz Ishak, Universiti Teknologi MARA Malaysia (2009)
process responses under automatic control.
Terminology
Ideal response: The desired process response is achieved at an instantaneous time.
Ideal
response
PV2
PV1
SP2
SP1
Time
Ideal
response
PV2
PV1
SP2
SP1
Time
Ideal
PV2 response
PV1
SP2
SP1
Time
PV
Out of spec
UCL
SP2
LCL
Out of spec
SP
1
0 Time
1. LCL = Lower control (quality)
limit.
2. UCL = Upper control (quality)
.
limit
QAD Oscillatory
Underdamped
Overdamped
Offset
1. Response time
2. Settling time
3. Rise time
4. Quarter Amplitude Damping (QAD)
5. Quality limits (BEST for product quality control)
6. No overshoot or no undershoot (BEST for
temperature and pH control)
7. Minimum IAE, ITSE, etc.