Site Location
Scale: 1:500 Figure 1 - Example Location Plan
Show sizes to
nearest 0.1m
Show sizes and
position of
new building
Site Boundary
Meter position
Figure 2 - Example site layout
Applicant contact details Site contact details (If different from Applicant)
Title: Mr Title:
Street:
Site address (where work is required & if different
City: Nantglyn from Applicant address)
Will you, the Applicant be responsible for accepting the quotation? Yes ✔ No (if no, complete the section below)
Please be advised we can only issue any invoices, refunds or VAT receipts to the named person on this quotation.
This is classed as the contracted party. Please see Frequently asked questions (3) for more info.
Street: Telephone:
City: Mobile:
County: Email :
Postcode: Notes:
Please describe the project: Connection request for a photovoltiac generation site
Other Supply types Non -Domestic No. of connections required Load (kVA)
Please note kVA load Temporary No. of connections required Load (kVA)
capacity is mandatory
in this section.
Landlord No. of connections required Load (kVA)
If you’re unsure of your requirements, we recommend asking a qualified electrician to help you complete this section.
Equipment type
If applicable, please provide a copy of the street-lighting layout with your application.
Section D – Generation
We’ll need details of any micro-generation, such as solar panels, that will be connected as part of your project. See Frequently asked questions (13).
Do the works require notification under The Construction (Design and Management) Regulations (CDM) 2007? ✔
Is your site in a conservation area or historic site? ✔
Is it possible your site has buried contaminants or hazards as a result of previous development? ✔
Is your property a listed building, or buildings? ✔
Are there any special surfaces in or around your site that we should be aware of –
for example, Caithness slabs or block paving? ✔
Are there any significant height changes, such as hills, mounds or depressions, within the site boundary? ✔
Does your site contain any invasive vegetation, like Japanese Knotweed or Giant Hogweed? ✔
Does your site contain any trees subject to preservation orders? ✔
Are there any potential surface obstacles, like hedges, walls and fences? ✔
Are there any buried obstacles – for example, drainage systems, culverts or other structures? ✔
Is the footpath/roadway in the site’s immediate vicinity fully adopted by the Local Authority? ✔
We are looking to obtain a budget estimate for the connection of a 20MW solar park to the site
Section G – Checklist
To help us process your application as quickly as possible please check you’ve included all of the following information before you submit
your application form.
Q3 2022
When would you like your Connections project to start?
Section H – Signature
When you’re all done, just sign and date the form:
Signature of Applicant Date
• Feasibility – Before submitting a formal quote application, you can 12. What is an Electricity Energy Supplier?
request a Feasibility Study to ensure a connection is viable. Based on Your Electricity Supplier is the company you choose to buy your electricity
our own network studies, we can give you an indicative connection from and who you will pay your electricity bills to. They also organize the
assessment. We require payment in advance for a Feasibility Study, and installation of the meter. We at SP Energy Networks, are responsible for
we’ll notify you of the relevant cost before starting. operating and maintaining the network of underground cables and
overhead lines that deliver power to your premises.
• Point of Connection (POC) – Under a POC Quotation, the Independent
Connection Provider (ICP) completes certain parts of the electrical 13. What is Generation?
connection works (known as ‘contestable works’). On completion of Whether you are looking to connect any type of generator to our SP
these works, the ICP may hand over the connection assets to SP Energy Distribution network, such as wind turbines, solar panels, hydro schemes,
Networks, or to a licensed Independent Network Operator (IDNO). please refer to our dedicated generation section on our website:
A POC Quotation is valid for three months.
For more information:
To find out more, visit:
spenergynetworks.co.uk/pages/distributed_generation.asp
spenergynetworks.co.uk/pages/competition_in_connections.asp
14. Excavation and Reinstatement
• Budget – We can provide a basic priced estimate of the costs that would
be associated to your Connection requirements with just a small amount of If you choose to arrange excavation and reinstatement you will be
information. Note that this is a guide only and if you wanted to progress to us responsible for the liaison with the relevant local authority, to obtain
carrying out the works then we would need to create a formal Quotation. the relevant permits, street works license’s (section 50) and to comply
with the necessary legislation and conditions as required by the relevant
5. What size supply will I need? And how do I calculate local authority including, the New Roads and Street Works Act 1991.
my electrical load (kVA)? All excavations shall conform to NJUG 7 wherever possible.
We recommend you discuss your supply with a qualified electrician, so they
Prior to any works, we will complete an inspection of the excavation and
can help you calculate your load requirements. Once you’ve given us your
load details, we can design a supply that matches your needs.
to view the evidence that the necessary licenses / permits have been
obtained. It will be your responsibility to pay any additional costs to the
6. What happens to my application when I return it? local authority incurred in obtaining the necessary permits, licenses etc
Once we’ve received your application, we’ll appoint a designer to your project. to enable you to complete the necessary excavations works.
They’ll contact you to discuss all your requirements and timescales.
SP Energy Networks, Connecting you to our network application form SCP-6904 Nov 17