J23-016B Manual
J23-016B Manual
FOR
MODEL J23-16B
SERIAL NO.
Ⅵ. Installation
User should check whether the number of accessories and wearing parts is
conformity with the number as shown in packing list after unpacking the press .
Meanwhile place the press in dry circumstance for three or four days to evaporate
motor and electrical equipment . If necessany , check whether insulation is
reliability , Lay foundation according to Fig.10 . After it is well gulated , install press
onto foundation steady . Level work plate of press with a plumb leveller . The
permissible error of the levelness should not exceed 0.2mm per 1000mm .
After leveling the press . mount foundation bolts and grout square holes with
concrete(cement to sand is one to three), The press would not be started until
concrete coagulates completely .
After the press has been installed , clean the anticorrosive slush on the press
surface with kerosene . Notice not to damage the lacquered surface . Meanwhile
clean oil holes , oil pipeline and oil leveller . check whether earth line is properly
connected .
Metallic object and abrasive cloth should not be used during clean the press .
Ⅸ. Precision inspection
The press has been checked according to the standard of open back press
precision before despatch . It should be checked after repairing . Otherwise it will
influence the quality of workpiece .
The precision standard and permissible error please see test certificate .
Brake heats too much Braking band is too tightened Adjust the braking spring
1 Spanner 45 1
2.Wearing parts
8 Extension spring Pc 1
9 Safe Disc Pc 1
10 Brake band Pc 1
11 Cam Pc 1
12 Rubber Pc 1
13 Operation Instruction Copy 1
14 Teat certificate Copy 1
15 Packing List Copy 1
Packed by: