This document provides a bill of materials and cost estimate for a two-storey open rentable space building with a basement located in Pico, La Trinidad, Benguet. It includes 7 items with details on quantities, units, unit costs, materials costs, labor costs, and total costs for various construction components such as earthworks, concrete works, steel works, masonry and plastering works, tile works, and others. The total project cost is estimated to be over 1.5 million Philippine pesos.

Uploaded by

jansenroses
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views4 pages

Final Starkan Est

This document provides a bill of materials and cost estimate for a two-storey open rentable space building with a basement located in Pico, La Trinidad, Benguet. It includes 7 items with details on quantities, units, unit costs, materials costs, labor costs, and total costs for various construction components such as earthworks, concrete works, steel works, masonry and plastering works, tile works, and others. The total project cost is estimated to be over 1.5 million Philippine pesos.

Uploaded by

jansenroses
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 4

AS BUILT PLAN FOR TWO (2) STOREY OPEN RENTABLE SPACE BUILDING WITH BASEMENT

PROJ:
BUILDING

LOC'T: PICO, LA TRINIDAD, BENGUET DATE

OWNER: MRS. MELODY BANAÑA LAMPUYAS

BILL OF MATERIALS AND COST ESTIMATE


SPL A Pay Item/Description Quantity Unit Unit Cost Materials Labor Total

A.1 Safety Requirements 1.00 LOT LOT ₱ 30,000.00 - ₱ 30,000.00

A.2 Equipment Steel H-frame scafolds/GI pipe w/ clamps 1.00 LOT LOT ₱ 50,000.00 - ₱ 50,000.00

₱ 80,000.00 sub-total ₱ 80,000.00

ITEM 1 EARTHWORKS Quantity Unit Unit Cost Materials Labor Total

1.1 A.1 Structural Excavation (Com. Earth) 40.50 m3 LOT ₱ - ₱ 15,000.00 ₱ 15,000.00

1.2 A.2 Termite control 0.00 m² ₱ - ₱ - ₱ - ₱ -

₱ - sub-total ₱ 15,000.00

ITEM 2 CONCRETE WORKS Quantity Unit Unit Cost Materials Labor Total

2.1 Cement (40kg) Foundation,Column, Slab, Beams 338.93 bags ₱ 245.00 ₱ 83,036.77 ₱ 29,062.87 ₱ 112,099.64

2.2 Fine Aggregates Foundation,Column, Slab, Beams 18.04 m 3


₱ 1,300.00 ₱ 23,458.05 ₱ 8,210.32 ₱ 31,668.36

2.3 Course Aggregates Foundation,Column, Slab, Beams 28.87 m 3


₱ 1,300.00 ₱ 37,532.87 ₱ 13,136.51 ₱ 50,669.38

*Equipments 1- Bagger Concrete Mixer, Cargo Truck 1.00 LOT WHOLE ₱ 10,000.00

₱ 144,027.69 sub-total ₱ 204,437.38

ITEM 3 STEEL WORKS (REINFORCING STEEL BARS) Quantity Unit Unit Cost Materials Labor Total

3.1 16 mm RSB (gr 40) Foundation,Column, Slab, Beams 201.00 pcs ₱ 314.78 ₱ 63,270.78 ₱ 22,144.77 ₱ 85,415.55

3.2 10mm RSB (gr 40) Walls, Slab, Sitrrups, Lateral Ties 431.61 pcs ₱ 139.00 ₱ 59,993.79 ₱ 20,997.83 ₱ 80,991.62

#16 GI tie wire 89.00 kg ₱ 65.00 ₱ 5,785.00 ₱ 2,024.75 ₱ 7,809.75

*Equipments 1- Electric Grinder 1.00 LOT WHOLE ₱ 1,200.00

₱ 129,049.57 sub-total ₱ 175,416.92

ITEM 4 MASONRY & PLASTERING WORKS Quantity Unit Unit Cost Materials Labor Total

4.1 Cement (40kg) 245.00 bags ₱ 250.00 ₱ 61,250.00 ₱ 21,437.50 ₱ 82,687.50

4.2 Fine aggregates 13.36 m 3


₱ 600.00 ₱ 8,016.00 ₱ 2,805.60 ₱ 10,821.60

4.3 4" CHB 555.00 pcs ₱ 14.00 ₱ 7,770.00 ₱ 2,719.50 ₱ 10,489.50

4.4 10mm RSB 65.00 pcs ₱ 130.00 ₱ 8,450.00 ₱ 2,957.50 ₱ 11,407.50

4.5 #16 GI tie wire 2.88 rolls ₱ 1,500.00 ₱ 4,320.00 ₱ 1,512.00 ₱ 5,832.00

4.6 Hardware materials Lumpsum ₱ 2,000.00

4.7 *Equipments 1- Bagger Concrete Mixer 1.00 LOT WHOLE ₱ 8,000.00

₱ 89,806.00 sub-total ₱ 131,238.10

ITEM 4 MASONRY & PLASTERING WORKS Quantity Unit Unit Cost Materials Labor Total

5.1 Formworks/scaffolds (coco lumber) 256.00 bd.ft. ₱ 28.00 ₱ 7,168.00 ₱ 2,508.80 ₱ 9,676.80

5.2 3/4 ordinary plywood 15.00 pcs. ₱ 1,250.00 ₱ 18,750.00 ₱ 6,562.50 ₱ 25,312.50

5.3 1/2 ordinary plywood 20.00 pcs. ₱ 775.00 ₱ 15,500.00 ₱ 5,425.00 ₱ 20,925.00

5.4 3" nails CWN 13.00 kgs ₱ 90.00 ₱ 1,170.00 ₱ 409.50 ₱ 1,579.50
5.5 2" nails CWN 15.00 kgs ₱ 90.00 ₱ 1,350.00 ₱ 472.50 ₱ 1,822.50

5.6 1 1/2" nails CWN 10.00 kgs ₱ 90.00 ₱ 900.00 ₱ 315.00 ₱ 1,215.00

5.7 2" concrete nails 15.00 kgs ₱ 90.00 ₱ 1,350.00 ₱ 472.50 ₱ 1,822.50

5.8 3" concrete nails 15.00 kgs ₱ 90.00 ₱ 1,350.00 ₱ 472.50 ₱ 1,822.50

5.9 3" teks screw 1500.00 pcs. ₱ 4.00 ₱ 6,000.00 ₱ 2,100.00 ₱ 8,100.00

₱ 53,538.00 sub-total ₱ 72,276.30


ITEM 6 STEEL WORKS (Roofing) (Columns) (Side Wall Cover) Quantity Unit Unit Cost Materials Labor Total

6.1 2" x /2" x 3/16 Angle Bars 97.00 pcs. ₱ 550.00 ₱ 53,350.00 ₱ 16,005.00 ₱ 69,355.00

6.2 100mm x 150mm Steel W-Flange 20.00 pcs. ₱ 6,136.36 ₱ 122,727.20 ₱ 36,818.16 ₱ 159,545.36

6.3 150mm x 200mm Steel W-Flange 12.00 pcs. ₱ 8,863.00 ₱ 106,356.00 ₱ 31,906.80 ₱ 138,262.80

6.4 2" x 10" x 1.0 fascia 15.00 pcs. ₱ 680.00 ₱ 10,200.00 ₱ 3,060.00 ₱ 13,260.00

6.5 0.40 Cladding type roofing w/ bended materials (1m x 3.3m) 30.00 pcs. ₱ 1,050.00 ₱ 31,500.00 ₱ 7,875.00 ₱ 39,375.00

6.6 16mm-Ø Round Bar Cross Bracings 22.00 pcs. ₱ 490.00 ₱ 10,780.00 ₱ 3,234.00 ₱ 14,014.00
6.7 1m x 1m Steel Base Plate 12mm thk. 2.00 pcs. ₱ 6,000.00 ₱ 12,000.00 ₱ 3,600.00 ₱ 15,600.00
6.8 12mm-Ø Sagrods 25.00 pcs. ₱ 126.00 ₱ 3,150.00 ₱ 945.00 ₱ 4,095.00
6.8 Hardware materials Lumpsum ₱ 6,000.00

*Equipments Welding Machine (300 Amp) ₱ 12,000.00

₱ 350,063.20 sub-total ₱ 471,507.16

ITEM 7 TILE WORKS Quantity Unit Unit Cost Materials Labor Total
7.1 60x60 Semi granite kitchen counter & wall tiles 14.00 pcs. ₱ 420.00 ₱ 5,880.00 ₱ 2,646.00 ₱ 8,526.00

7.2 40Ux40 Unglazed floor tiles (landing and stairs) 75.00 pcs. ₱ 33.00 ₱ 2,475.00 ₱ 1,113.75 ₱ 3,588.75

7.3 40x40 glazed floor tiles (Kitchen Area) 161.50 pcs. ₱ 45.00 ₱ 7,267.50 ₱ 3,270.38 ₱ 10,537.88

7.4 15x30 Glazed Ceramic Floor tiles (Non Slip) 100.00 pcs. ₱ 60.00 ₱ 6,000.00 ₱ 2,700.00 ₱ 8,700.00

7.5 20x20 Mosaic Tiles (T&B Walls) 47.00 pcs. ₱ 36.00 ₱ 1,692.00 ₱ 761.40 ₱ 2,453.40

7.6 30x60 wall tiles (facade) 30.00 pcs. ₱ 200.00 ₱ 6,000.00 ₱ 2,700.00 ₱ 8,700.00

7.7 ABC tile adhesive 21.00 bags ₱ 205.00 ₱ 4,305.00 ₱ 1,937.25 ₱ 6,242.25

7.8 Cement (40kg) 54.00 bags ₱ 250.00 ₱ 13,500.00 ₱ 6,750.00 ₱ 20,250.00


7.9 Fine aggregates 6.60 m3 ₱ 600.00 ₱ 3,960.00 ₱ 1,980.00 ₱ 5,940.00

Tile grout/sealer/hardware Lumpsum ₱ 11,000.00

₱ 51,079.50 sub-total ₱ 85,938.28

ITEM 8 CEILING WORKS Quantity Unit Unit Cost Materials Labor Total

8.1 Ceiling joist (double furring) 12mm x 38mm x 5mm x 0.8mm 91.00 pcs ₱ 120.00 ₱ 10,920.00 ₱ 4,368.00 ₱ 15,288.00

8.2 Wall angle channel 31.00 pcs ₱ 55.00 ₱ 1,705.00 ₱ 682.00 ₱ 2,387.00

8.3 Carrying channel 12mm x 38mm x 5mm x 0.8mm 15.00 pcs ₱ 160.00 ₱ 2,400.00 ₱ 960.00 ₱ 3,360.00

8.4 4′ x 8′ x 4.50mm Fiber Cement (Ceiling board) 140.00 pcs ₱ 425.00 ₱ 59,500.00 ₱ 23,800.00 ₱ 83,300.00

8.5 Ceiling Vent 1" x 12" x 4' with Screen 74.00 pcs ₱ 187.00 ₱ 13,838.00 ₱ 5,535.20 ₱ 19,373.20

8.6 Blind Rivets 7.00 boxes ₱ 220.00 ₱ 1,540.00 ₱ 616.00 ₱ 2,156.00

8.7 Hardware materials Lumpsum ₱ 2,000.00

₱ 89,903.00 sub-total ₱ 127,864.20

ITEM 9 DOORS & WINDOWS Quantity Unit Unit Cost Materials Labor Total

9.1 2.60m x 1m Glass wall (D1) 1.00 sets ₱ 15,000.00 ₱ 15,000.00 ₱ 2,250.00 ₱ 17,250.00

9.2 2.1m x 0.8m uPVC Door w/ Accessories 3.00 sets ₱ 2,500.00 ₱ 7,500.00 ₱ 1,125.00 ₱ 8,625.00

9.3 2.1m x 0.7m Steel Door (D2) 2.00 sets ₱ 2,000.00 ₱ 4,000.00 ₱ 600.00 ₱ 4,600.00

9.4 W-1 Alum. Glass window 1 (1.2m x 1.2m) 8mm 4.00 sets ₱ 3,850.00 ₱ 15,400.00 ₱ 2,310.00 ₱ 17,710.00

9.5 W-1 Alum. Glass window 1 (1.2m x 2m) 8mm 2.00 sets ₱ 4,500.00 ₱ 9,000.00 ₱ 1,350.00 ₱ 10,350.00

9.6 W-2 Alum. Glass window 1 (1.2m x 2m) 8mm 4.00 sets ₱ 5,000.00 ₱ 20,000.00 ₱ 3,000.00 ₱ 23,000.00

Miscellaneous ₱ 2,000.00

₱ 70,900.00 sub-total ₱ 83,535.00


ITEM 11 PAINTING WORKS Quantity Unit Unit Cost Materials Labor Total
Semi-Gloss Latex Paint Finish (includes Preparation, 1 Coat
Flat Primer, 2 Coats Finish) on prepared 6mm Fibercement
11.1 70.00 m² ₱550.00 ₱ 38,500.00 ₱ 3,850.00 ₱ 42,350.00
Board Walls - 06160.F1 W/ (stone finish at third floor and
beams)
Semi-Gloss Latex Paint (Matte) with Plexibond Primer
11.2 55.00 m² ₱500.00 ₱ 27,500.00 ₱ 2,750.00 ₱ 30,250.00
Applied as Primer to Firewall
Semi-Gloss Latex Paint (Matte) at Elevated Wall Grade beam
11.3 15.00 m² ₱550.00 ₱ 8,250.00 ₱ 825.00 ₱ 9,075.00
level
₱ 74,250.00 sub-total ₱ 81,675.00

ITEM 12 RAILINGS Quantity Unit Unit Cost Materials Labor Total

12.1 Stainless 2 1/2"-Ø Railings Tubular Handrails 40.00 ln.m ₱880.00 ₱ 35,200.00 ₱ 3,520.00 ₱ 38,720.00

12.2 Stainless 3 Railings 156.00 ln.m ₱150.00 ₱ 23,400.00 ₱ 2,340.00 ₱ 25,740.00

₱ 58,600.00 sub-total ₱ 64,460.00

ITEM 13 ELECTRICAL WORKS Quantity Unit Unit Cost Materials Labor Total
13.1 Panel board-4 holes 1.00 sets ₱ 850.00 ₱ 850.00 ₱ 85.00 ₱ 935.00

13.2 No. 6 THN wire 0.50 box ₱ 6,450.00 ₱ 3,225.00 ₱ 322.50 ₱ 3,547.50

13.3 No. 8 THHN wire 1.00 box ₱ 7,200.00 ₱ 7,200.00 ₱ 720.00 ₱ 7,920.00

13.4 No. 10 THHN wire 0.25 box ₱ 6,100.00 ₱ 1,525.00 ₱ 152.50 ₱ 1,677.50

13.5 No. 14 THHN wire 1.00 boxes ₱ 2,900.00 ₱ 2,900.00 ₱ 290.00 ₱ 3,190.00

13.6 60 AT, 80 AT Main circuit breaker, Plug-in type,2p 4.00 sets ₱ 760.00 ₱ 3,040.00 ₱ 304.00 ₱ 3,344.00

13.7 utility/junction boxes 10.00 pcs. ₱ 26.00 ₱ 260.00 ₱ 26.00 ₱ 286.00

13.8 1 gang switch 20.00 sets ₱ 110.00 ₱ 2,200.00 ₱ 220.00 ₱ 2,420.00

13.9 2 gang switch 10.00 sets ₱ 160.00 ₱ 1,600.00 ₱ 160.00 ₱ 1,760.00

14.0 3 gang switch 1.00 sets ₱ 200.00 ₱ 200.00 ₱ 20.00 ₱ 220.00

14.1 2-gang convinience outlet (weatherproof) 8.00 sets ₱ 250.00 ₱ 2,000.00 ₱ 200.00 ₱ 2,200.00

14.2 2-gang convinience outlet 20.00 sets ₱ 180.00 ₱ 3,600.00 ₱ 360.00 ₱ 3,960.00

14.3 CFL lightings (ordinay) 20.00 pcs. ₱ 250.00 ₱ 5,000.00 ₱ 500.00 ₱ 5,500.00

14.4 conduit pipes and fittings Lumpsum ₱ 2,000.00

14.5 Grounding rod 1 ₱ 400.00 ₱ 400.00 ₱ 40.00 ₱ 440.00

14.6 meter box, 1-window 1 unit ₱ 460.00 ₱ 460.00 ₱ 46.00 ₱ 506.00


14.7 2W spool rack insulator 1 set ₱ 300.00 ₱ 300.00 ₱ 30.00 ₱ 330.00

₱ 34,760.00 sub-total ₱ 40,236.00

ITEM 13 PLUMBING WORKS Quantity Unit Unit Cost Materials Labor Total

13.1 Water closet/lavatory (package) 1 sets ₱ 3,800.00 ₱ 3,800.00 ₱ 1,520.00 ₱ 5,320.00

13.1 Kitchen sink and accessories 2 units ₱ 3,000.00 ₱ 6,000.00 ₱ 2,400.00 ₱ 8,400.00

13.1 Shower head and faucet 1 sets ₱ 1,200.00 ₱ 1,200.00 ₱ 480.00 ₱ 1,680.00

13.1 Downspouts/catch basin/septic tank Lumpsum ₱ 7,500.00 Lumpsum ₱ 7,500.00

13.1 Water line Lumpsum ₱ 11,599.00 Lumpsum ₱ 11,599.00


13.1 Sanitary line Lumpsum ₱ 6,000.00 Lumpsum ₱ 6,000.00

13.1 Assorted fittings/solvent cement etc. Lumpsum ₱ 3,000.00 Lumpsum ₱ 3,000.00

13.1 Hardware materials Lumpsum ₱ 3,000.00 Lumpsum ₱ 3,000.00

₱ 42,099.00 sub-total ₱ 46,499.00

Material ,equipments and labor cost ₱ 1,680,083.33

Overhead contingencies ₱ 67,203.33

Mobilization cost ₱ 33,601.67

TOTAL PROJECT COST ₱ 1,780,888.33

Prepared by:

JANSEN B. TABDI,CE MRS. MELODY BANAÑA LAMPUYAS


PRC No: 058015 Owner

EXCLUDING WORKS: 1. PERIMETER FENCING WORKS


2. LANDSCAPING WORKS
3. CABINETRY WORKS
4. WATER METER
5. ELECTRIC METER