Labour & Machinary Output & Productivity

The document contains productivity calculations for various construction items for a building with a 700 sqm floor plate area. It lists 29 construction items and provides the expected productivity per day in units like cubic meters or square meters based on the crew size. For example, excavation by JCB can achieve 1,500 cubic meters per day with one machine working. Manual backfilling can achieve 60 cubic meters per 6 days with one crew. Concrete works in mass raft foundations can achieve 450 cubic meters over 2 days with 2 crews.

Uploaded by

Zeeshan Mumtaz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views24 pages

Labour & Machinary Output & Productivity

The document contains productivity calculations for various construction items for a building with a 700 sqm floor plate area. It lists 29 construction items and provides the expected productivity per day in units like cubic meters or square meters based on the crew size. For example, excavation by JCB can achieve 1,500 cubic meters per day with one machine working. Manual backfilling can achieve 60 cubic meters per 6 days with one crew. Concrete works in mass raft foundations can achieve 450 cubic meters over 2 days with 2 crews.

Uploaded by

Zeeshan Mumtaz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 24

PRODUCTIVITY CALCULATIONS

Tower Floor Plate Area Sqm 700

Description of Item Unit Qty


Manual - Excavation & Getting Out upto Depth 1.5 to 3.0 Metre
Productivity Calculation Cum 100
Days 20
Per Team 1

Description of Item Unit Qty


Excavation by JCB upto 3 Metre Depth
Productivity Calculation Cum 1500
Days 1
Per JCB (30 Cum Per Hour) 1

Description of Item Unit Qty


Backfilling by Manual
Productivity Calculation Cum 60
Days 6
Per Team 1

Description of Item Unit Qty


Plain Cement Concrete (Through Hand Mix)
Productivity Calculation Cum 5
Days 1
Per Team 1

Description of Item Unit Qty


Concrete In Isolated Footing & Foundations
Productivity Calculation Cum 25
Days 1
Per Team 2

Description of Item Unit Qty


Concrete In Mass Concrete Raft Foundations
Productivity Calculation Cum 450
Days 2
Per Team 2

Description of Item Unit Qty


Concrete In Columns / Shaer Walls / Retaining Walls
Productivity Calculation Cum 130
Days 10
Per Team 1

Description of Item Unit Qty


Concrete In RCC Slab & Beams (Mixer Machine & Manually)
Productivity Calculation Cum 20
Days 1
Per Team 2

Description of Item Unit Qty


Concrete In RCC Slab & Beams Through Pump & Batching
Productivity Calculation Cum 150
Days 2
Per Team 2

Description of Item Unit Qty


Concrete In RCC Slab & Beams Through Pump & Batching
Productivity Calculation Cum 150
Days 3
Per Team 2

Description of Item Unit Qty


Foundation Shuttering
Productivity Calculation Sqm 150
Days 5
Per Team 2

Description of Item Unit Qty


Rectangular Column, Pedestal Shuttering
Productivity Calculation Sqm 750
Days 15
Per Team 2

Description of Item Unit Qty


Retaining / RCC Walls
Productivity Calculation Sqm 950
Days 30
Per Team 2
Description of Item Unit Qty
Beam & Slab Shuttering
Productivity Calculation Sqm 2000
Days 15
Per Team 2

Description of Item Unit Qty


Reinforcement Steel Works
Productivity Calculation MT 20
Days 7
Per Team 2

Description of Item Unit Qty


Brick Work 230mm Thick upto Plinth Level
Productivity Calculation Cum 65
Days 20
Per Team 2

Brick Work 230mm Thick Above Plinth Level


Productivity Calculation Cum 250
Days 20
Per Team 4

AAC Block 100mm Thick


Productivity Calculation Sqm 120
Days 4
Per Team 2

AAC Block 150 / 230 / 300mm Thick


Productivity Calculation Cum 130
Days 15
Per Team 2

Half Brick Work 115mm Thick upto Plinth Level


Productivity Calculation Sqm 150
Days 7
Per Team 2

Internal Wall Plaster Cement


Productivity Calculation Sqm 3500
Days 25
Per Team 2

Ceiling Plaster 6-8mm Thick


Productivity Calculation Sqm 850
Days 20
Per Team 2

Gypsum Plaster Cement


Productivity Calculation Sqm 3500
Days 20
Per Team 4

External Plaster Works in Two Coats 18-20mm Thick


Productivity Calculation Sqm 6500
Days 30
Per Team 4

Concrete Flooring Works / IPS Flooring (40-50mm Thick)


Productivity Calculation Sqm 180
Days 7
Per Team 2

Tile Flooring
Productivity Calculation Sqm 650
Days 20
Per Team 3

Tile Skirting
Productivity Calculation Rmt 270
Days 5
Per Team 1

18-20mm Thick Stone - Granite/ Kota / Indian / Italian./ Imported


Marble Flooring
Productivity Calculation Sqm 135
Days 8
Per Team 2
Description of Item Unit Qty
Polishing & Rubbing
Productivity Calculation Sqm 135
Days 8
Per Team 2

Description of Item Unit Qty


Stone Flooring in Staircase Riser & Treads - Cutting & Fixing
Productivity Calculation Sqm 28
Days 2
Per Team 1
Polishing & Rubbing
Productivity Calculation Sqm 28
Days 4
Per Team 2

Laminate Wooden Flooring (Normal)


Productivity Calculation Sqm 180
Days 7
Per Team 2

1mm Thick - Birla Putty


Productivity Calculation Sqm 2650
Days 10
Per Team 2

OBD Paint on Walls including Priming Coat


Productivity Calculation Sqm 750
Days 10
Per Team 2

Acrylic / Plastic Emulsion Interior Paint on Walls including Priming Coat


Productivity Calculation Sqm 2650
Days 15
Per Team 2

Exterior Texture / Weather Shield Paint including Priming Coats


Productivity Calculation Sqm 6500
Days 30
Per Team 3
Tapecrete / Polymer Based Water Proofing in Toilet / Kitchen & Wet Areas
Productivity Calculation Sqm 70
Days 4
Per Team 2
Mason Labour
0.96
96
5
0.00 5.00

Mason JCB
0.03
6
6
0.00 6.00

Mason Labour
0.30
18
3
3.00

Mason Labour
0.17 3.13
1 16
1 16
1.00 16.00

Mason Labour
0.08 0.73
2 18
2 18
1.00 9.00

Mason Labour
0.03 0.36
12 163
6 82
3.00 41.00

Mason Labour
0.22 1.36
29 176
3 18
3.00 18.00

Mason Labour
0.24 3.40
5 68
5 68
2.00 34.00

Mason Labour
0.16 1.12
24 168
12 84
6.00 42.00

Mason Labour
0.10 0.15
15 23
5 8
3.00 4.00

Carpanter Helper
0.10 0.15
15 23
3 5
2.00 2.00

Carpanter Helper
0.18 0.30
131 225
9 15
4.00 8.00

Carpanter Helper
0.22 0.38
210 361
7 12
3.00 6.00
Carpanter Helper
0.15 0.23
300 450
20 30
10.00 15.00

Binder Helper
6 8
120 160
17 23
9.00 11.00

Mason Labour
0.72 1.78
47 115
2 6
1.00 3.00

0.94 3.34
235 834
12 42
3.00 10.00

0.07 0.29
9 35
2 9
1.00 4.00

0.62 1.75
81 228
5 15
3.00 8.00

0.09 0.25
14 37
2 5
1.00 3.00

0.08 0.26
263 910
11 36
5.00 18.00

0.06 0.17
47 142
2 7
1.00 4.00

0.20 0.12
700 420
35 21
9.00 5.00

0.12 0.34
780 2217
26 74
7.00 18.00 10% Labour for Scaffolding

0.09 0.25
16 45
2 6
1.00 3.00

0.20 0.38
130 247
7 12
2.00 4.00

0.03 0.04
9 12
2 2
2.00 2.00

0.18 0.41
24 55
3 7
1.00 3.00
Mason Helper
0.50
68
8
0.00 4.00

Mason Helper
0.20 0.58
5 16
3 8
3.00 8.00
0.50
14
4
0.00 2.00

0.10 0.15
18 27
3 4
1.00 2.00

0.05 0.05
119 119
12 12
6.00 6.00

0.05 0.05
41 38
4 4
2.00 2.00

0.06 0.05
159 143
11 10
5.00 5.00

0.06 0.04
390 228
13 8
4.00 3.00
0.22 0.25
15 18
4 4
2.00 2.00
LABOUR PRODUCTIVITY / OUTP

Description of Works

General Works
Loading / Unloading of Cement Bag at Plant

Loading / Unloading of Reinforcement Steel

Civil Works
Foundation Excavation

Excavation & Getting Out upto Depth 1.5 to 3.0 Metre

Excavation & Getting Out upto Depth 1.5 to 3.0 Metre

Backfilling by Manual

Backfilling by JCB

Foundation Excavation by JCB

Excavation & Getting Out upto Depth 1.5 to 3.0 Metre

Excavation & Getting Out upto Depth 1.5 to 3.0 Metre

Concreting Works

Plain Cement Concrete

Plain Cement Concrete

Concrete In Foundation / Raft / Footing

Concrete In Isolated Footing & Foundations

Concrete In Mass Concrete Raft Foundations

Concrete In Columns / Shaer Walls / Retaining Walls

Concrete In Columns / Shaer Walls / Retaining Walls

Concrete In RCC Slab & Beams

Concrete In RCC Slab & Beams

Concrete In Staicase / Chajjas / Counter Slabs

Concrete In Staicase / Chajjas / Counter Slabs

Concrete Pump Capacity Per Hour

Conventional Plywood Shuttering Works - Shuttering Making, Fabr


Foundation Shuttering
Rectangular Column, Pedestal Shuttering

Retaining / RCC Walls

Beam & Slab Shuttering

Lintal & RCC Band, Counter Shuttering

Reinforcement Steel Works


Reinforcement Steel Works

Masonary Works - Including, Mixing of Mortar, Shifting of Materials


Brick Work 230mm Thick Walls (650 to 700 Bricks/ Per Mason)

Brick Work 230mm Thick Walls (530 to 550 Bricks/ Per Mason)

Half Brick Work 115mm Thick (625 to 650 Bricks / Per Mason)

Half Brick Work 115mm Thick (470 to 500 Bricks / Per Mason)

AAC Block 100mm Thick

AAC Block 150 / 230 / 300mm Thick

Plastering Works - Including Scaffolding, Mixing & Curing


Internal Plaster Works 12-15mm Thick

Gypsum Plaster Works 12-15mm Thick

External Plaster Works in Two Coats 18-20mm Thick

External Plaster Works in Single Coats 18-20mm Thick

Ceiling Plaster 6-8mm Thick

Neat Cement Punning @ 4.4 Kg / Sqm

Flooring Works
Concrete Flooring Works

Concrete Flooring Works / IPS Flooring (40-50mm Thick)

Concrete Pavement in Road Work

Concrete Pavement in Road Work (Through Concrete Pump)

Tile Flooring Works

Tile Flooring - 15-20mm Thick Mortar


Tile Cladding with 12mm Thick Mortar

Tile Skiriting with 12mm Thick Mortar

Tile Flooring in Staircase Riser & Treads - Cutting & Fixing

Tile Flooring - 15-20mm Thick Mortar

Tile Cladding with 12mm Thick Mortar


18-20mm Thick Stone - Granite/ Kota / Indian / Italian./ Imported
Marble Flooring

Stone Flooring - Cutting & Fixing


Polishing & Rubbing

18-20mm Thick Stone - Granite/ Kota / Indian / Italian./ Imported


Marble Flooring
Stone Flooring - Cutting & Fixing

Polishing & Rubbing

Stone Flooring in Staircase Riser & Treads - Cutting & Fixing

Polishing & Rubbing

Kota Stone Flooring in Staircase Steps & Risers- Cutting & Fixing

Polishing & Rubbing


18-20mm Thick Stone - Granite/ Kota / Indian / Italian / Imported
Marble Flooring

Stone Flooring - Cutting & Fixing

Polishing & Rubbing

Laminate Wooden Flooring (Normal)

Laminate Wooden Flooring (Harringbone Pattern)

Painting & Finishing Works - Including Surface Prepration & Scaffo


1mm Thick - Birla Putty

Internal Finishings
White Wash / Colour Washing Works - Two Coats

Distempering on Walls including Priming Coat

OBD Paint on Walls including Priming Coat


Acrylic / Plastic Emulsion Interior Paint on Walls including Priming Coat

External Finishings
Exterior Texture / Weather Shield Paint including Priming Coats

Painting on Wood & MS Steel Sufaces


Painting of Wood Surfaces with Primer

Synthetic Enamel Paint of MS Plain Surfaces with Primer

Polishing on Wood Sufaces


French Spirit Polish

Melamine Polish

Wax Polish

Water Proofing Treatments Works


Tapecrete / Polymer Based Water Proofing in Toilet / Kitchen & Wet Areas

Water Proofing Treatment Over Roof


ODUCTIVITY / OUTPUT COEFFECIENTS IN CONSTRUCTION WORKS
Mason / Carpanter / Beldar / Mazdoor /
Unit Quantity
Fabricator / Painter Helper / Bhisti

Bag 140 1

MT 90 2

Cum 1 0.96

Cum 1 0.63

Cum 1 0.30

Cum 30 1.00

Cum 1 0.03

Cum 20 1.00

Cum 1 0.17 3.13

Cum 1 0.17 2.54

Cum 1 0.17 2.90

Cum 1 0.08 0.73

Cum 1 0.027 0.36

Cum 1 0.22 4.11

Cum 1 0.22 1.36

Cum 1 0.24 3.40

Cum 1 0.16 1.12

Cum 1 0.30 5.41

Cum 1 0.30 3.03

Cum 25

huttering Making, Fabrication, Shifting & Erection & Deshuttering


Sqm 1 0.10 0.15
Sqm 1 0.18 0.30

Sqm 1 0.22 0.38

Sqm 1 0.13 0.23

Sqm 1 0.25 2.25

MT 1 6.00 8.00

ar, Shifting of Materials, Scaffolding & Curing


Cum 1 0.72 1.78

Cum 1 0.94 3.34

Sqm 1 0.09 0.25

Sqm 1 0.12 0.42

Sqm 1 0.07 0.29

Cum 1 0.62 1.75

xing & Curing


Sqm 1 0.08 0.26

Sqm 1 0.20 0.12

Sqm 1 0.12 0.34

Sqm 1 0.07 0.18

Sqm 1 0.06 0.17

Sqm 1 0.03 0.03

Sqm 1 0.09 0.25

Cum 1 0.45 2.56

Cum 1 0.45 1.28

Sqm 1 0.20 0.38


Sqm 1 0.25 0.43

Rmt 1 0.033 0.04

Sqm 1 0.25 0.43

Sqm 1 0.30 0.48

Sqm 1 0.35 0.53

Sqm 1 0.12 0.38


Sqm 1 0.50

Sqm 1 0.175 0.41

Sqm 1 0.50

Sqm 1 0.195 0.40

Sqm 1 0.70

Sqm 1 0.30 0.58

Sqm 1 0.70

Sqm 1 0.12 0.38

Sqm 1 0.50

Sqm 1 0.10 0.15

Sqm 1 0.30 0.15

ce Prepration & Scaffolding (Note for Old Surfaces Painting Factors are 50% Applicable)
Sqm 1 0.045 0.045

Sqm 1 0.030 0.010

Sqm 1 0.080 0.040

Sqm 1 0.054 0.050


Sqm 1 0.060 0.054

Sqm 1 0.060 0.035


Sqm 1 0.085 0.060

Sqm 1 0.066 0.066

Sqm 1 0.350 0.100

Sqm 1 0.035 0.035

Sqm 1 0.080 0.080

Sqm 1 0.220 0.250

Sqm 1 0.300 0.150


TRUCTION WORKS

Remarks

Loading & Unloading Both Sides

2 Hydra Full Day

Foundation

Trench

Upto 50 Meter Lead / Normal Filling

Trench & Foundation Works

Foundation / Hour

Trench / Hour

By Hand Mix

By Plant / Mixer Machine

By Mixer Machine & Manually Placing

By Batching Plant Through Pump

By Batching Plant Through Pump

By Mixer Machine & Manually

By Plant / Mixer Machine by Tower Crane

By Mixer Machine & Manually Placing

By Batching Plant Through Pump

By Mixer Machine

By Batching Plant Through Pump

1 Concrete Pump with 2 Transit Mixer

huttering

Slab Height upto 3600mm


Slab Height upto 3600mm

Upto Plinth Level

Super Structure Works Above Plinth Level

Upto Plinth Level

Super Structure Works Above Plinth Level

Super Structure Works Above Plinth Level

Super Structure Works Above Plinth Level

Internal Walls upto 3600mm Height

Internal Walls upto 3600mm Height

10% Labour for additional floors for Scaffolding

10% Labour for additional floors for Scaffolding

Ceiling Height upto 3600mm Lvl.

In Drains & Wall Dados

(Mixing with Mixer & Placed Manually)

(Mixing with Plant & Placed with Concrete Pump)

Without Grouting (Joint to Joint Finish)


Without Grouting (Joint to Joint Finish)

With 3mm Spacer with Epoxy Grout in Groove Filling

Normal Plain Flooring

Pattern Flooring

Shifting, Cutting & Installation

Shifting, Cutting & Installation

53.82 53.82
nting Factors are 50% Applicable) 550 350

Min. Two Coats 0.097855 0.153771

Min. Two Coats

Min. Two Coats

Min. Two Coats


Min. Two Coats

Min. Two Coats


Min. Two Coats

Min. Two Coats

Single Coat

Single Coat

Min. Two Coats

With Two Layer Coating with Mortar Protection

With Two Layer Coating with Concrete Protection