Labour & Machinary Output & Productivity
Labour & Machinary Output & Productivity
Tile Flooring
Productivity Calculation Sqm 650
Days 20
Per Team 3
Tile Skirting
Productivity Calculation Rmt 270
Days 5
Per Team 1
Mason JCB
0.03
6
6
0.00 6.00
Mason Labour
0.30
18
3
3.00
Mason Labour
0.17 3.13
1 16
1 16
1.00 16.00
Mason Labour
0.08 0.73
2 18
2 18
1.00 9.00
Mason Labour
0.03 0.36
12 163
6 82
3.00 41.00
Mason Labour
0.22 1.36
29 176
3 18
3.00 18.00
Mason Labour
0.24 3.40
5 68
5 68
2.00 34.00
Mason Labour
0.16 1.12
24 168
12 84
6.00 42.00
Mason Labour
0.10 0.15
15 23
5 8
3.00 4.00
Carpanter Helper
0.10 0.15
15 23
3 5
2.00 2.00
Carpanter Helper
0.18 0.30
131 225
9 15
4.00 8.00
Carpanter Helper
0.22 0.38
210 361
7 12
3.00 6.00
Carpanter Helper
0.15 0.23
300 450
20 30
10.00 15.00
Binder Helper
6 8
120 160
17 23
9.00 11.00
Mason Labour
0.72 1.78
47 115
2 6
1.00 3.00
0.94 3.34
235 834
12 42
3.00 10.00
0.07 0.29
9 35
2 9
1.00 4.00
0.62 1.75
81 228
5 15
3.00 8.00
0.09 0.25
14 37
2 5
1.00 3.00
0.08 0.26
263 910
11 36
5.00 18.00
0.06 0.17
47 142
2 7
1.00 4.00
0.20 0.12
700 420
35 21
9.00 5.00
0.12 0.34
780 2217
26 74
7.00 18.00 10% Labour for Scaffolding
0.09 0.25
16 45
2 6
1.00 3.00
0.20 0.38
130 247
7 12
2.00 4.00
0.03 0.04
9 12
2 2
2.00 2.00
0.18 0.41
24 55
3 7
1.00 3.00
Mason Helper
0.50
68
8
0.00 4.00
Mason Helper
0.20 0.58
5 16
3 8
3.00 8.00
0.50
14
4
0.00 2.00
0.10 0.15
18 27
3 4
1.00 2.00
0.05 0.05
119 119
12 12
6.00 6.00
0.05 0.05
41 38
4 4
2.00 2.00
0.06 0.05
159 143
11 10
5.00 5.00
0.06 0.04
390 228
13 8
4.00 3.00
0.22 0.25
15 18
4 4
2.00 2.00
LABOUR PRODUCTIVITY / OUTP
Description of Works
General Works
Loading / Unloading of Cement Bag at Plant
Civil Works
Foundation Excavation
Backfilling by Manual
Backfilling by JCB
Concreting Works
Brick Work 230mm Thick Walls (530 to 550 Bricks/ Per Mason)
Half Brick Work 115mm Thick (625 to 650 Bricks / Per Mason)
Half Brick Work 115mm Thick (470 to 500 Bricks / Per Mason)
Flooring Works
Concrete Flooring Works
Kota Stone Flooring in Staircase Steps & Risers- Cutting & Fixing
Internal Finishings
White Wash / Colour Washing Works - Two Coats
External Finishings
Exterior Texture / Weather Shield Paint including Priming Coats
Melamine Polish
Wax Polish
Bag 140 1
MT 90 2
Cum 1 0.96
Cum 1 0.63
Cum 1 0.30
Cum 30 1.00
Cum 1 0.03
Cum 20 1.00
Cum 25
MT 1 6.00 8.00
Sqm 1 0.50
Sqm 1 0.70
Sqm 1 0.70
Sqm 1 0.50
ce Prepration & Scaffolding (Note for Old Surfaces Painting Factors are 50% Applicable)
Sqm 1 0.045 0.045
Remarks
Foundation
Trench
Foundation / Hour
Trench / Hour
By Hand Mix
By Mixer Machine
huttering
Pattern Flooring
53.82 53.82
nting Factors are 50% Applicable) 550 350
Single Coat
Single Coat