PECAT
PECAT
• Proximity measurement
• Arm-mounted magnetic sensing technology
• HR Caliper
Sensor Arms
Inc Caliper
Sensor
Springs
Pressure
Vessel
Odometer
Debris
2nd PECAT™ KM Volume (m³)
Run 1 0.14
2 0.12
3 0.15
4 0.13
5 0.15
6 0.13
7 0.17
8 0.12
9 0.32
10 0.11
11 0.13
End 0.14
Total 1.81
Fairfield Betula Ltd Dunlin – UK 24” x 35km Pipeline. Progressive cleaning 2015
Cormorant A programme and post cleaning cleanliness
assessment.
EnQuest Britain Ltd Heather – UK 16” x 32km Pipeline. Pre-inspection cleaning 2014
Ninian followed by cleanliness assessment.
BP Exploration & Operating Azeri Caspian 30” x 188km Pipeline. Data-logger run to record 2014
Co. Ltd vibration and differential pressure.
BP Exploration & Operating Greater Plutonia Angola 12” x 23km (S) Pipeline. Pre-inspection cleanliness 2012
Co. Ltd assessment.
BP Exploration & Operating Greater Plutonia Angola 12” x 48km (N) Pipeline. Pre-inspection cleanliness 2012
Co. Ltd assessment.
EnQuest Britain Ltd Thistle – UK 16" x 12km Pipeline. Progressive cleaning 2012
Dunlin programme and post cleaning cleanliness
assessment.
EnQuest Britain Ltd Thistle – UK 16" x 12km Pipeline. Pre cleaning cleanliness 2011 /
Dunlin assessment followed by progressive cleaning 2010
programme and post cleaning assessment.
Marathon Oil UK LLC East Brae – UK 18” x 25km Pipeline. Cleanliness assessment. 2010
Brae Alpha
3D Anomaly
Visualisation